Английская Википедия:Greenboro station
Шаблон:Short description Шаблон:Infobox station Greenboro is a transitway stop and future O-Train Trillium Line (Line 2) station in Ottawa, Ontario, Canada. It is located at Bank Street and Johnston Road at the north end of the South Keys shopping complex.[1] The station has a 678-space paid park and ride lot. The bus terminus was opened with the southern transitway on September 2, 1995.
From 2001 to 2020, Greenboro served as the southern terminus for the Trillium Line. Upon the line's relaunch in 2024, Greenboro will become a through station, while Limebank station will serve as the line's new terminus. Service to the Шаблон:Octs (near the EY Centre) and Шаблон:Octs stations will be relocated to the nearby South Keys station, which will connect to these stations with a fare-paid interchange to the Airport Link train.
Service
Шаблон:See also The following routes serve Greenboro station as of May 3, 2020:[2] Шаблон:OC Transpo key
Greenboro Station Service | |
---|---|
North O-Train | Under construction (opening in 2024) |
South O-Train | Under construction (opening in 2024) |
1A Transitway South | Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox |
1B | Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox (Off only) |
2A Transitway North | Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox Шаблон:Rbox |
3A | No longer in use |
- Every route that ends at Greenboro (except for some Route 97 trips and O-Train replacement buses) ends at stop 1B
- Until 2015, A stop designated as 3A was in use by route 43 but when it was redirected to the Southeast Transitway, this stop was abandoned. This stop could go back into use when the time comes to convert the Southeast Transitway into LRT but this is not going to happen until some time after 2031.
Gallery
-
Future Greenboro Station to be used for the Trillium Line (opened for the public for Doors Open Ottawa 2023)
-
Greenboro O-Train platform in 2005, with Bombardier Talent BR643
References
External links
Шаблон:Commons category-inline
- Страницы с неработающими файловыми ссылками
- Английская Википедия
- Trillium Line stations
- Railway stations in Canada opened in 2001
- 2001 establishments in Ontario
- 1995 establishments in Ontario
- Transitway (Ottawa) stations
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии