Английская Википедия:Hanoi–Lao Cai Expressway

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox road The Hanoi–Lao Cai Expressway Another name Noi Bai–Lao Cai Expressway (Vietnamese: Đường cao tốc Nội Bài - Lào Cai, labelled CT.05) is an expressway section of the Expressways of Vietnam, 265 km long and has its starting point at the intersection of National Highway 18 with National Highway 2 in Thanh Xuân commune, Sóc Sơn district, Hanoi city and the end point at Duyên Hải ward, Lào Cai, Lao Cai province, connecting with G8011 Kaiyuan–Hekou Expressway at Lào Cai International Border Gate. This Expessway is part of the Asian Highway Network (AH14) and Transport infrastructure development project Kunming - Hanoi - Hai Phong economic corridor.

This route passes through 5 provinces and cities: Hanoi (12 km), Vĩnh Phúc (40 km), Phú Thọ (62 km), Yên Bái (65 km) and Lào Cai (83 km).


Construction

Construction on the expressway began in 2009 with a total investment of US$1.46 billion. The Asian Development Bank provided a US$1 billion loan for development of the expressway.[1] South Korean Posco Group won 3 of the 8 bids, China's Guangxi Road & Bridge Engineering won 2 bids and Vietnamese Vinacomex won one.[2][3][4]

When it opened on 21 September 2014, it was the longest expressway in Vietnam.[1] The Yên Bái to Lao Cai section of the route was opened as a two-lane expressway, the section between Yen Bai and Hanoi being a four lane dual carriageway.[1]

Route details

Файл:CT05 NoiBai LaoCai.svg

Lanes

  • Noi Bai - Yen Bai section: 160km long, with 4 lanes, 2 emergency lanes, maximum speed of 100km/h (from Km0+00 to Km123+080). There are 2 lanes in each direction, each lane is 3.75m wide and an emergency lane is 3m wide.
  • Yen Bai - Lao Cai section: 83km long, with 2 lanes, 2 emergency lanes, maximum speed of 80km/h. There are 1 lanes in each direction, each lane is 3.5m wide and an emergency lane is 2.5m wide. Every 8 - 10 km, there is a 1km long 4 lanes section for vehicles to pass each other.

Length

Total route length: 264 km

Speed

  • 2 lanes section: Maximum: 80km/h - Minimum: 60km/h
  • 4 lanes section: Maximum: 100km/h - Minimum: 60km/h (section Lào Cai City - Lào Cai international border gate Maximum: 90km/h - Minimum: 60km/h)

According to design, the maximum speed is 120 km/h. VEC will allow vehicles to run at a maximum speed of 120 km/h when ensuring safe conditions along the entire route.

List of interchanges and features

Шаблон:RJL

No. Name Dist. from
Origin
Connections Notes Location
Connect with Шаблон:Vietnam road banner  Noi Bai - Bac Ninh - Ha Long Expressway (Шаблон:Vietnam road banner National Route 18)
1 Nội Bài JCT 0.0 Шаблон:Vietnam road banner  Noi Bai - Bac Ninh - Ha Long Expressway
Шаблон:Vietnam road banner National Route 18
Шаблон:Vietnam road banner National Route 2
Võ Văn Kiệt road (to Hanoi Center)
Nội Bài International Airport
Hà Nội Sóc Sơn
2 Ring Road 4 IC 3.7 Шаблон:Vietnam road banner Ring Road 4 (Hanoi) Planned
TG Toll Gate Km6 6
3 IC.02 7.9 Nguyễn Tất Thành Road Planned Vĩnh Phúc Phúc Yên
4 Bình Xuyên IC 14.0 Provincial Road 310 Bình Xuyên
SA Phước An SA
5 Tam Đảo IC 25.0 Шаблон:Vietnam road banner National Route 2B Tam Dương
6 IC.05 31.4 Шаблон:Vietnam road banner National Route 2C Planned
BR Phó Đáy Bridge Phó Đáy River crossing Boundary Tam Dương - Lập Thạch
7 Văn Quán IC 40.9 Provincial Road 305C Lập Thạch
BR Sông Lô Bridge Lô River crossing Boundary Vĩnh Phúc - Phú Thọ
8 Việt Trì IC 49.4 Phù Đổng Road Phú Thọ Việt Trì
9 Phù Ninh IC 54.9 Шаблон:Vietnam road banner National Route 2 Phù Ninh
SA Service Area Km57 57 Lâm Thao
10 Phú Thọ IC 66.3 Шаблон:Vietnam road banner Tuyên Quang–Phú Thọ and Phú Thọ – Chợ Bến
HCM Road
Phú Thọ
BR Hanoi–Lào Cai railway crossing Thanh Ba
BR Hồng River Bridge Hồng River crossing Boundary Thanh Ba - Cẩm Khê
11 Sai Nga IC 81.5 Шаблон:Vietnam road banner National Route 32C Cẩm Khê
12 Hạ Hòa IC 98.6 Шаблон:Vietnam road banner National Route 70B Vô Tranh
13 Yên Bái JCT 114.8 Âu Cơ Road Yên Bái Trấn Yên
SA Service Area Km117 117.5
14 IC.13 121.4 Шаблон:Vietnam road banner National Route 37 Under Construction Yên Bái
BR Ngòi Rào Bridge Ngòi Rào crossing Trấn Yên
BR Ngòi Thia Bridge Ngòi Thia crossing Văn Yên
15 Mậu A JCT 150.0 Provincial Road 166 Connect with Шаблон:Vietnam road banner Yên Bái - Hà Giang
16 IC.15 166.3 Provincial Road 166 Planned
SA Service Area Km171 171.5
TN Noi Bai - Lao Cai Expressway Tunnel Completed the 500m long tunnel, phase 1
17 Văn Bàn JCT 199.9 Шаблон:Vietnam road bannerNational Route 279 Connect with Шаблон:Vietnam road banner Bảo Hà -Lai Châu Lào Cai Văn Bàn
BR Nhù Bridge Nhù Stream crossing Boundary Bảo Yên - Bảo Thắng
18 Phố Lu JCT Шаблон:Vietnam road bannerNational Route 4E Bảo Thắng
19 Xuân Giao IC 234.0 Шаблон:Vietnam road bannerNational Route 4E
TG Toll Gate Km237 237 Toward Lào Cai
SA Service Area Km237
TG Toll Gate Km237 Toward Nội Bài
20 Cam Đường JCT 245.0 Bình Minh Road Lào Cai
TN Tunnel Toward Lào Cai
21 National Route 4D JCT 256.0 Шаблон:Vietnam road bannerNational Route 4D
22 Kim Thành JCT 264.4 Khúc Thừa Dụ Road
Connect with Файл:China Expwy G8011 sign with name.svg   Kaiyuan–Hekou Expressway through to Hekou - Lào Cai International Border

Шаблон:Jctbtm

See also

References

Шаблон:Reflist

Шаблон:Highways in Vietnam

Шаблон:Vietnam-road-stub Шаблон:Vietnam-transport-stub