Английская Википедия:Harrington railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:For Шаблон:Use dmy dates Шаблон:Use British English Шаблон:More citations needed Шаблон:Infobox station Harrington railway station is a railway station serving the village of Harrington in Cumbria, England. It is on the Cumbrian Coast Line, which runs between Шаблон:Rws and Шаблон:Rws. It is owned by Network Rail and managed by Northern Trains.

Harrington Hump

The station came to national prominence in 2008 when it was chosen as the initial site for the installation of an experimental ramp to raise the height of the platform to improve access to modern rolling stock. Christened the Harrington Hump, the ramp was built for £25,000[1] – 10% of the estimated cost of the conventional rebuilding that would have otherwise been required to make the platform fully DDA compliant. The modular design has since been deployed at several other rural stations across the UK where the cost of platform upgrades would otherwise have been considered prohibitive.[2]

Facilities

The station is unstaffed (like most others on the route), but now has been provided with a ticket machine to allow passengers to buy tickets before travelling. Shelters are located on both platforms, which are linked by a footbridge. Step-free access is available only on the southbound side (where the main entrance is situated).[3] Train running information is provided via telephone, digital information screens and timetable posters.

Service

Шаблон:Northern (train operating company) route 6 There is generally an hourly service northbound to Carlisle and southbound to Whitehaven with most trains going onward to Barrow-in-Furness (no late evening service operates south of Whitehaven).[4] A few through trains operate to/from Lancaster via the Furness Line.

Train operator Northern introduced a regular Sunday through service to Barrow via the coast at the May 2018 timetable change – the first such service south of Whitehaven for more than 40 years. Services run approximately hourly from mid-morning until early evening, with later trains terminating at Whitehaven. This represents a major upgrade on the former infrequent service of four per day each way to/from Whitehaven only that previously operated. In addition, it was announced that Harrington would no longer be a request stop.

Файл:Distington, Siddick Jn, Workington & Rosehill RJD 111.jpg
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area

References

Шаблон:Reflist

External links

Шаблон:Portal

Шаблон:Rail start Шаблон:Rail line Шаблон:Historical Rail Insert Шаблон:Rail line Шаблон:S-end

Шаблон:Cumbria railway stations Шаблон:Railway stations served by Northern Trains


Шаблон:NorthWestEngland-railstation-stub

  1. The Harrington Hump – Association of Community Rail Partnerships News Article Шаблон:Webarchive www.acorp.co.uk; retrieved 2010-12-30
  2. Station hump helps train access BBC News article www.bbc.co.uk; retrieved 2010-12-30
  3. Harrington station facilities National Rail Enquiries
  4. GB eNRT December 2019 Edition, Table 100