Шаблон:Short description Шаблон:Featured article Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox rail line Шаблон:Hastings Line The Hastings line is a secondary railway line in Kent and East Sussex, England, linking Шаблон:Rws with the main town of Шаблон:Rws, and London via Шаблон:Rws and Шаблон:Rws. Although primarily carrying passengers, the railway also serves a gypsum mine which is a source of freight traffic. Southeastern Trains operates passenger trains on the line, and it is one of their busiest lines.

The railway was constructed by the South Eastern Railway in the early 1850s across the difficult terrain of the High Weald. Supervision of the building of the line was lax, enabling contractors to skimp on the lining of the tunnels. These deficiencies showed up after the railway had opened. Rectifications led to a restricted loading gauge along the line, requiring the use of dedicated rolling stock.

Served by steam locomotives from opening until the late 1950s, passenger services were then taken over by a fleet of diesel-electric multiple units built to the line's loading gauge. Diesel locomotives handled freight, also built to fit the loading gauge. The diesel-electric multiple units served on the line until 1986, when the line was electrified and the most severely affected tunnels were reduced from double track to single.

Background

The South Eastern Railway (SER) completed its main line from London to Dover, Kent in 1844, branching off the rival London, Brighton and South Coast Railway's (LBSC) line at Шаблон:Rws. Construction of a single line branch from Шаблон:Rws (modern spelling "Tonbridge"Шаблон:Ref) to Tunbridge Wells, a fashionable town where a chalybeate spring had been discovered in 1606,Шаблон:Sfn began in July 1844. At the time, Parliament had not given assent for the railway.[1] The Act of Parliament enabling the construction of the line had its first reading in the House of Commons on 28Шаблон:NbspApril 1845.[2] The bill completed its passage through the House of Commons and the House of Lords on 28Шаблон:NbspJuly,[3][4][5][6][7] following which Royal Assent was granted on 31Шаблон:NbspJuly by Queen Victoria.[8] Шаблон:Tonbridge station The engineer in charge of the construction was Peter W. Barlow and the contractors were Messrs. Hoof & Son.[9] In April 1845 the SER decided that the branch would be double track. A Шаблон:Convert tunnel was required Шаблон:Convert after leaving Tunbridge. This was named "Somerhill Tunnel" after the nearby mansion. A mile and 54 chains (2.70 km) after leaving Somerhill Tunnel, a Шаблон:Convert viaduct was required. Southborough Viaduct stands Шаблон:Convert high and has 26 arches. A temporary station was built at Tunbridge Wells as the Шаблон:Convert Wells Tunnel was still under construction. It was Шаблон:Convert from Tunbridge. The temporary station subsequently became a goods station.[1] The first train, comprising four locomotives and 26 carriages, arrived at Tunbridge Wells on 19Шаблон:NbspSeptember.Шаблон:Sfn Trains from Tunbridge had to reverse before starting the climb to Somerhill Tunnel, as there was no facing junction at Tunbridge. This situation was to remain until 1857,Шаблон:Sfn when a direct link was built at a cost of £5,700.[10] The old link remained in use until Шаблон:Circa 1913.Шаблон:Sfn

The SER was granted permission to build a line from Ashford in Kent to St Leonards, East Sussex in 1845. The LBSC reached St Leonards from Шаблон:Rws the following year. This gave the LBSC a shorter route to Шаблон:Rws than the SERs route, then still under construction. The SER sought permission to extend their branch from Tunbridge Wells across the High Weald to reach Hastings.Шаблон:Sfn Authorisation for the construction of a Шаблон:Convert line to Hastings was obtained on 18Шаблон:NbspJune 1846,[9] Parliament deemed the line between Ashford and St Leonards to be of military strategic importance. Therefore, they stipulated that this line was to be completed before any extension was built from Tunbridge Wells.Шаблон:Sfn The extension into Tunbridge Wells opened on 25Шаблон:NbspNovember 1846 without any public ceremony.[11] In 1847, the SER unsuccessfully challenged the condition that the line between Ashford and St Leonards be completed first. That line was opened in 1851, passing through Hastings and making an end-on junction with the LBSC line from Lewes.Шаблон:Sfn

Construction

The Hastings line is built over the difficult, forested, and hilly terrain across the High Weald and sandstone Hastings Beds, necessitating the construction of eight tunnels between Tonbridge and the south coast seaside resort of Hastings. The SER was anxious to construct the line as economically as possible, since it was in competition with the LBSC to obtain entry into Hastings and was not in a strong financial position in the mid-1840s.Шаблон:Sfn

The construction of the line between Tunbridge Wells and Robertsbridge was contracted to Messrs. Hoof & Wyths,[12] subcontracted to Messrs. H. Warden.[9] By March 1851, the trackbed had been constructed as far as Whatlington, East Sussex, a distance of Шаблон:Convert. All tunnels had been completed and a single line of railway had been laid for a distance of Шаблон:Convert from Tunbridge Wells.[13] When the Шаблон:Convert section from Tunbridge Wells to Robertsbridge opened on 1Шаблон:NbspSeptember, a single line of track extended a further Шаблон:Convert to Whatlington. On the Шаблон:Convert section between Whatlington and St Leonards, Шаблон:Convert out of Шаблон:Convert had been excavated.[14] Construction of the line between Tunbridge Wells and Bopeep Junction cost in excess of £500,000.[15]

Deficiencies in the construction of the tunnels

Supervision of the construction was lax,Шаблон:Sfn which enabled the contractors to skimp on the lining of the tunnels. This manifested itself in March 1855 when part of the brickwork of Mountfield Tunnel collapsed. An inspection of Grove Hill, Strawberry Hill and Wells tunnels revealed that they too had been constructed with too few layers of bricks.Шаблон:Sfn Grove Hill Tunnel had been built with just a single ring of bricks and no filling above the crown of the brickwork.Шаблон:Sfn The SER took the contractors to court and were awarded £3,500 in damages. However, rectifying the situation cost the company £4,700.[9]Шаблон:Sfn Although the contractors had charged for six rings of bricks, they had only used four. Due to the cost of reboring the tunnels,Шаблон:Sfn this had to be rectified by the addition of a further two rings of brickwork, reducing the width of the tunnels by Шаблон:Convert. The result of this was that the loading gauge on the line was restricted, and special rolling stock had to be built,Шаблон:Sfn later becoming known as Restriction 0 rolling stock.Шаблон:Sfn This problem would affect the line until 1986.Шаблон:Sfn

Wadhurst Tunnel collapsed in 1862 and it was discovered by the SER that the same situation existed there too.Шаблон:Sfn Rectification cost £10,231.[16] By 1877, only one train was permitted in Bopeep Tunnel at a time. The tunnel was partly widened in 1934–35.Шаблон:Sfn In November 1949, serious defects were discovered in the tunnel. Single-line working was put in place on 19Шаблон:NbspNovember, but the tunnel had to be closed completely a week later. The tunnel was partially relined with cast iron segments. It reopened to traffic on 5Шаблон:NbspJune 1950.Шаблон:Sfn Mountfield Tunnel was underpinned in 1938–39, remaining open with single-line working in operation.Шаблон:Sfn It partially collapsed on 17Шаблон:NbspNovember 1974, resulting in single-line working until 31Шаблон:NbspJanuary 1975. The line was then closed until 17Шаблон:NbspMarch whilst the track was singled through the tunnel.Шаблон:Sfn

Openings

The line was opened by the SER in three main stages: Tunbridge–Tunbridge Wells, Tunbridge Wells–Robertsbridge and Robertsbridge–Bopeep Junction. A temporary station was opened at Tunbridge Wells on 19Шаблон:NbspSeptember 1845 while Wells Tunnel was completed. The temporary station later became the goods depot. Tunbridge Wells (later Tunbridge Wells Central) station opened on 25Шаблон:NbspNovember 1846.[1]Шаблон:SfnШаблон:Sfn The Tunbridge Wells–Robertsbridge section opened on 1 September 1851, with the Robertsbridge–Battle section opening on 1 January 1852. The Battle–Bopeep Junction section opened on 1 February 1852.Шаблон:Sfn

Description of the route

Photograph showing Bopeep Junction, with the signalbox at centre right.
Bopeep junction

The line climbs steeply out of the Medway Valley at gradients of between 1 in 47Шаблон:Ref and 1 in 300 to a summit south of Tunbridge Wells, the line undulates as far as Шаблон:Rws at gradients between 1 in 80 and 1 in 155 before descending into the Rother Valley, which it follows as far as Шаблон:Rws at gradients between 1 in 48 and 1 in 485. The line then climbs at gradients between 1 in 86 and 1 in 170 before a dip where it crosses the River Brede. This is followed by a climb to Battle with gradients between 1 in 100 and 1 in 227 before the line falls to Hastings at gradients of between 1 in 100 and 1 in 945.Шаблон:SfnШаблон:Sfn

Bopeep Junction is the junction of the Hastings line with the East Coastway line. It lies east of Bopeep Tunnel.Шаблон:Sfn There is a pub in Bulverhythe called The Bo Peep. The name was a nickname for Customs and Excise men.[17]Шаблон:Sfn

Tunnels

There are eight tunnels between Tonbridge and Hastings. In order from north to south they are:

Tunnels on the Hastings line
Name Length Tracks Details Photograph
SomerhillШаблон:Sfn Шаблон:ConvertШаблон:Sfn Single Somerhill Tunnel is between Tonbridge and Шаблон:Rws stations.Шаблон:Sfn It was reduced to single track from 19Шаблон:NbspJanuary 1986.Шаблон:Sfn Photograph showing the south portal of Somerhill Tunnel, with a London-bound train about to enter.
WellsШаблон:Sfn Шаблон:Convert.Шаблон:Sfn Double Wells Tunnel is between High Brooms and Tunbridge Wells stations.Шаблон:Sfn Photograph showing the south portal of Wells Tunnel.
Grove HillШаблон:Sfn Шаблон:ConvertШаблон:Sfn Double Grove Hill Tunnel is between Tunbridge Wells and Шаблон:Rws Stations.Шаблон:Sfn Photograph showing the north portal of Grove Tunnel.
Strawberry HillШаблон:Sfn Шаблон:ConvertШаблон:Sfn Single Strawberry Hill Tunnel is between Tunbridge Wells and Frant stations.Шаблон:Sfn It was reduced to single track from 21Шаблон:NbspApril 1985.Шаблон:Sfn Photograph showing the north portal of Strawberry Hill tunnel.
WadhurstШаблон:Sfn Шаблон:ConvertШаблон:Sfn Single Wadhurst Tunnel is between Шаблон:Rws and Шаблон:Rws stations.Шаблон:Sfn It was reduced to single track from 8Шаблон:NbspSeptember 1985.Шаблон:Sfn ald=Photograph showing the north portal of Wadhurst Tunnel
MountfieldШаблон:Sfn Шаблон:ConvertШаблон:Sfn Single Mountfield Tunnel is between Robertsbridge and Шаблон:Rws stations.Шаблон:Sfn It was reduced to single track from 17Шаблон:NbspMarch 1975.Шаблон:Sfn Photograph showing north portal of Mountfield Tunnel.
BopeepШаблон:Sfn Шаблон:ConvertШаблон:Sfn Double Bopeep Tunnel is between Шаблон:Rws and Шаблон:Rws stations.Шаблон:Sfn Photograph showing west portal of Bopeep Tunnel.
HastingsШаблон:Sfn Шаблон:ConvertШаблон:Sfn Double Hastings Tunnel is between St Leonards Warrior Square and Hastings stations.Шаблон:Sfn Photograph showing the west portal of Hastings Tunnel.

Stations

The original stations on the Tunbridge Wells to Hastings section of the line are mostly in the Gothic or Italianate styles. These were designed by William Tress.Шаблон:Sfn Frant, Wadhurst, Witherenden, Etchingham and Robertsbridge stations opened on 1Шаблон:NbspSeptember 1851.Шаблон:Sfn Other station openings are detailed below. Stations are listed under their original names.

  • Tunbridge
Photograph showing the exterior of Tonbridge station.
Tonbridge, July 2009

Шаблон:Rws station opened in May 1842. Following the opening of the branch to Tunbridge Wells in 1845, it was renamed to Tunbridge Junction in January 1852, then Tonbridge Junction in 1893, and to its current name in July 1929.Шаблон:SfnШаблон:Sfn The original station stood to the east of the road bridge, whereas the current station, opened in 1864, stands to the west.Шаблон:Sfn Trains leaving Tonbridge had to reverse to reach Tunbridge Wells. This arrangement lasted until 1857, when a new section of line was constructed enabling trains to reach the Hastings line without reversal.Шаблон:Sfn The station is Шаблон:Convert from Шаблон:Rws via Шаблон:Rws.[18]

  • Southborough

Southborough station opened on 1Шаблон:NbspMarch 1893. It was renamed High Brooms on 21Шаблон:NbspSeptember 1925 to avoid confusion with Southborough station on the Chatham Main Line, which had already been renamed Bickley.Шаблон:Sfn The station is Шаблон:Convert from Charing Cross.[18]

  • Tunbridge Wells
Файл:Strawberry Hill Tunnel 2.jpg
The north portal of the single-tracked Strawberry Hill Tunnel just south of Tunbridge Wells station

The first station at Шаблон:Rws was temporary and was situated north of Wells Tunnel. It opened on 19 September 1845 and was replaced by the present Tunbridge Wells Station on 25 November 1846. It subsequently became Tunbridge Wells Goods station, later renamed Tunbridge Wells Central Goods station.[1]Шаблон:Sfn The goods station closed in 1980, with a siding retained for engineers use.Шаблон:Sfn The original station was Шаблон:Convert from Шаблон:Rws via Redhill.[1][18]Шаблон:Ref

The building on the up side of the station was built in the Italianate style.Шаблон:Sfn A new building by A. H. Blomfield was constructed on the down side in 1911. The station was renamed Tunbridge Wells Central on 9 July 1923 with the ex-LBSC station being renamed Шаблон:Rws.[19]Шаблон:Sfn Following the closure of the Tunbridge Wells–Шаблон:Rws railway on 6 July 1985,[20] the name reverted to Tunbridge Wells. The station is Шаблон:Convert from Charing Cross.[18]

  • Frant

Шаблон:Rws station is Шаблон:Convert from Charing Cross.[18] The station building is on the down side.Шаблон:Sfn

  • Wadhurst

Шаблон:Rws station is Шаблон:Convert from Charing Cross.[18] The station building is in the Italianate style, with a later one-bay extension. The 1893-built signal box,Шаблон:Sfn decommissioned on 20 April 1986,Шаблон:Sfn was purchased by the Kent and East Sussex Railway.[21]

  • Witherenden

Шаблон:Rws station is Шаблон:Convert from Charing Cross.[18] It was renamed Ticehurst Road in December 1851, and Stonegate on 16Шаблон:NbspJune 1947.Шаблон:Sfn

  • Etchingham

Шаблон:Rws station is Шаблон:Convert from Charing Cross.[18] The building is on the up side.Шаблон:Sfn

  • Robertsbridge

Шаблон:Rws station is Шаблон:Convert from Charing Cross.[18] On 26Шаблон:NbspMarch 1900, it became a junction with the opening of the Rother Valley Railway to freight. The line opened to passengers on 2Шаблон:NbspApril 1900,Шаблон:Sfn and was renamed the Kent and East Sussex Railway in 1904. Шаблон:Sfn The Kent and East Sussex Railway closed to passengers on 2Шаблон:NbspJanuary 1954 and to freight on 12Шаблон:NbspJune 1962,Шаблон:Sfn except for a short section serving a mill at Robertsbridge which closed on 1Шаблон:NbspJanuary 1970.Шаблон:Sfn

  • Mountfield Halt

Шаблон:Rws opened in 1923. It closed on 6Шаблон:NbspOctober 1969.Шаблон:Sfn The platforms were built of sleepers and were demolished in the early 1970s.Шаблон:Sfn The station was Шаблон:Convert from Charing Cross.[18]

  • Battle

Шаблон:Rws station opened on 1Шаблон:NbspSeptember 1851.Шаблон:Sfn The buildings are in the Gothic style and stand on the up side.Шаблон:Sfn The station is Шаблон:Convert from Charing Cross.[18]

  • Crowhurst

A siding had existed at Шаблон:Rws from 1877.Шаблон:Sfn The station opened on 1Шаблон:NbspJune 1902 and was located at the junction for the Bexhill West branch line, which also opened the same day.Шаблон:Sfn Despite the line's closure on 14Шаблон:NbspJune 1964, Crowhurst station remains open.Шаблон:Sfn The station is Шаблон:Convert from Charing Cross.[18]

  • West St Leonards

Шаблон:Rws station opened on 1Шаблон:NbspOctober 1887.[22] The buildings are wood framed and covered with weatherboards.Шаблон:Sfn The station is Шаблон:Convert from Charing Cross.[18]

  • St Leonards Warrior Square

Шаблон:Rws station opened on 13 February 1851Шаблон:Sfn along with a new section of line between Hastings and the LBSCs Hastings & St Leonards station. This gave the LBSC better access to Hastings.[9][23] It lies between Bopeep Tunnel and Hastings Tunnel.Шаблон:Sfn The station is Шаблон:Convert from Charing Cross.[18]

  • Hastings
Photograph showing the exterior of Hastings station.
Hastings, May 2008

Шаблон:Rws station opened on 13 February 1851 along with the SER branch from Ashford.[23] Through platforms were provided for SER services and a separate terminal platform for LBSC services.Шаблон:Sfn The station was rebuilt and enlarged by the SER in 1880 as it was then inadequate for the increasing seasonal traffic. In 1930 the station was rebuilt by the Southern Railway. This entailed closure of the engine sheds at Hastings, with locomotives being transferred to St Leonards. The original station building, by Tress, was demolished and a new Neo-Georgian station building by J. R. Scott was erected. The rebuilt station was completed on 5 July 1931.[24] The new layout provided two island platforms.Шаблон:Sfn The station was rebuilt in 2003 by Railtrack. The 1931-built building was demolished and a new structure erected in its place.[25] The station is Шаблон:Convert from Charing Cross via Orpington.[18]

Links to other lines

Built

In the late 1860s, a single track link was built between the SERs Шаблон:Rws station and the LBSCs Tunbridge Wells station, which had opened in 1866. It was 1875 before powers were granted to run a passenger service over this section of line.Шаблон:Sfn The junction with the main line was Grove Junction. It was removed on 7Шаблон:NbspJuly 1985, following closure of the Tunbridge Wells Central–Eridge line the previous day.[20]

In 1900, the Rother Valley Railway opened from Robertsbridge to Tenterden. It was extended in stages to Шаблон:Rws and Шаблон:Rws, which was reached in 1905.Шаблон:Sfn The line closed to passengers on 2 January 1954 and freight on 12 June 1961, except for access to Hodson's Mill closed in 1970.Шаблон:Sfn The Rother Valley Railway heritage railway are rebuilding the line between Robertsbridge and Шаблон:Rws, with completion scheduled by 2018.[26] In 1902, a branch line was built to Шаблон:Rws, with a new station at the junction with the main line at Шаблон:Rws.Шаблон:Sfn This line closed on 14 June 1964.Шаблон:Sfn

Authorised

In 1903, a railway was authorised to be built from Robertsbridge to Pevensey, East Sussex. The line was authorised under the Light Railways Act 1896,[27] but was not constructed.[28]

Proposed

In 1856, it was proposed to build a Шаблон:Convert long branch from Шаблон:Rws to Mayfield, East Sussex.[29]Шаблон:Ref In 1882, an Шаблон:Convert long railway was proposed from Шаблон:Rws to Langney, East Sussex, giving access to Шаблон:Rws. Stations were proposed at Burwash, Dallington, Bodle Street Green, Boreham Street, Pevensey and Langney.[30]

Planned electrification

Photograph showing a Pullman carriage that was built between 1929 and 1934 to the Hastings line loading gauge.
One of the Pullman carriages built for the line between 1929 and 1934
Photograph showing one of the three electric locomotives built in 1941 to the Hastings line loading gauge.
One of the locomotives ordered in 1937 for the proposed electrification of the Hastings Line

Electrification of the Hastings line was first considered by the SER as early as 1903. Lack of finance meant that no decision had been made by the time World War I broke out in 1914.Шаблон:Sfn It was stated in 1921 that electrification was a long-term aim. In the mid-1930s, the Southern Railway, which had been formed from the SER, LBSC, London and South Western Railway (LSWR) and London, Chatham and Dover Railway (LCDR) in 1923 under the Railways Act 1921, electrified a number of lines. The East Coastway line was electrified in 1935, with a depot being built at Ore, East Sussex. In 1937, it was proposed to electrify the line between Шаблон:Rws and St Leonards Warrior Square at a cost of £1,500,000. The scheme was deferred, with another proposal in 1937 costing £1,300,000 also failing to gain favour before World War II broke out. One of the main reasons that electrification was not given the go-ahead was the fact that non-standard rolling stock would be required. The Southern Railway had provided the line with 104 new carriages and six Pullman Cars between 1929 and 1934.Шаблон:Sfn Two electric locomotives were ordered in 1937. They were built to the Hastings line loading gauge.Шаблон:Sfn

In October 1946, the Southern Railway announced a programme to electrify all lines in Kent and East Sussex in three stages. The Hastings line between Tonbridge and Bopeep Junction was to be part of the third stage.Шаблон:Sfn Track would have been slewed within the affected tunnels with only one train normally allowed in the tunnel. In an emergency, two trains would be allowed in the tunnel at the same time, but restricted to Шаблон:Convert. Standard Шаблон:Convert wide stock would be used.Шаблон:Sfn Following the nationalisation of railways in the United Kingdom under the Transport Act 1947, the Southern Region of British Railways shelved new electrification schemes, concentrating on the construction of new steam locomotives.Шаблон:Sfn In 1952, the possibility of operating standard rolling stock on the line had been examined. The Operating Department objected to the use of single line sections through the various tunnels. The 1930s stock was refurbished with the aim of extending its service by a further ten years. The first two phases of the Southern Railway's electrification scheme were revived in 1955. This did not include the Hastings line and it was announced in 1956 that a fleet of diesel-electric trains would be constructed to operate the service until the line was electrified. At that time, the rolling stock built in the 1930s was overdue for replacement.Шаблон:Sfn The modernisation to the Hastings line and the introduction of the diesel-electric trains cost £797,000, Шаблон:Sfn of which £595,000 was the cost of the first seven trains.Шаблон:Sfn A further thirteen trains cost £1,178,840.Шаблон:Sfn

Electrification was finally carried out in the 1980s, as detailed below.

Operators

From 1845, the line was operated by the SER.Шаблон:Sfn In 1899, the SER and LCDR entered into a joint working partnership, the South Eastern and Chatham Railway (SECR).Шаблон:Sfn On 1 January 1923, the Railways Act 1921 came into force, resulting in the Grouping.Шаблон:Sfn The SECR became part of the Southern Railway (SR).Шаблон:Sfn On 1 January 1948, the Transport Act 1947 came into force,Шаблон:Sfn and the SR became part of British Railways, with the former SR lines becoming the Southern Region.Шаблон:Sfn British Railways was rebranded British Rail on 1 January 1965.Шаблон:Sfn On 10 June 1986, Network SouthEast branded trains began operating.[31] On 1 January 1994, the Railways Act 1993 came into force, privatising British Rail. Passenger services were taken over by Connex South Eastern on 13 October 1996. On 27 June 2003, Connex lost the franchise due to poor financial management.[32] The Strategic Rail Authority took over the running of passenger trains from 9 November 2003, using their South Eastern Trains train operating company.[33] On 1 April 2006, Southeastern took over the operation of passenger trains on the route.[34] On 17 October 2021 SE Trains took over the operation of passenger trains on the route.[35]

Operation

Steam era (1845–1957)

Photograph showing a Schools class locomotive hauling a Hastings-bound passenger train. These locomotives were built in the 1930s to the Hastings line loading gauge.
Schools Class 30936 Cranleigh at Шаблон:Rws with a Шаблон:Rws to Hastings train in September 1948.

From the opening of the line, passenger stock consisted of 4-wheel carriages.Шаблон:Sfn In 1845, there were eight passenger trains a day from Tunbridge Wells to London, with half that number on Sundays.Шаблон:Sfn On 23Шаблон:NbspJune 1849, the Royal Train took Queen Victoria and Prince Albert to Tunbridge Wells to visit Queen Adelaide, the Queen Dowager. The train, consisting of the Royal Saloon, two first class carriages and a brake van made the journey from Bricklayers Arms to Tunbridge Wells in 75 minutes. It was driven by James Cudworth, the Locomotive Superintendent of the SER. The return journey took 70 minutes.[36] The Royal Train visited the line again on 18Шаблон:NbspDecember 1849 conveying Queen Victoria and Princess Alice from Windsor, Berkshire to Tunbridge Wells on a visit to Princess Louise. The journey via Waterloo took 100 minutes. The train was driven by William Jacomb, Resident Engineer of the LSWR, and Edgar Verringer, Superintendent of the LSWR. At Waterloo, driving of the train was taken over by John Shaw, General Manager of the SER and Mr. Cockburn, Superintendent of the SER. The return journey took 105 minutes.[37]

With the opening of the extension to Robertsbridge, there were three trains a day, with two on Sundays. These were augmented by an additional train daily when the extension to Bopeep Junction opened. In 1860, there were seven up trains and six down trains daily; Hastings to London via Шаблон:Rws taking two hours.Шаблон:Sfn From 1861, Cudworth 2-2-2 "Little Mail" class locomotives were introduced.Шаблон:Sfn In 1876, the Sub-Wealden Gypsum Co built a Шаблон:Convert long line from a junction south of Mountfield Tunnel to a gypsum mine located in Great Wood, Mountfield.Шаблон:Sfn This line was still in operation as of 2007.[38] Bogie carriages entered service on the line in 1880.Шаблон:Sfn In 1890, the winter service was eleven trains each way, of which five were fast.Шаблон:Ref An additional two trains daily operated between Tunbridge Wells and Wadhurst. By 1910, this had increased to twenty trains each way, of which twelve were fast, plus the extra two Wadhurst services. Four trains ran on Sundays. The service was reduced during World War I, but Sunday services had increased to seven by 1922.Шаблон:Sfn

By the 1930s the line was worked by L and L1 class 4-4-0 locomotives. The Schools class 4-4-0s were introduced in 1930;Шаблон:Sfn the width of these was Шаблон:Convert measured across the cab, and Шаблон:Convert measured across the cylinders.Шаблон:Sfn The service was again reduced during World War II, with fourteen trains daily in 1942, of which four were fast; there were seven trains on Sundays.Шаблон:Sfn As built, it was envisaged that the West Country and Battle of Britain class locomotives would be able to work the line. Forty-eight locomotives of the West Country and 22 of the Battle of Britain class were built with cabs that were Шаблон:Convert wide and paired with tenders of the same width. It was subsequently decided not to work these locomotives over the line.Шаблон:SfnШаблон:Sfn Locomotives from these two classes that were rebuilt gained a Шаблон:Convert cab. Unrebuilt locomotives retained their narrow cab.Шаблон:Sfn

By 1948, the service was sixteen trains, of which seven were fast. An additional three trains ran as far as Wadhurst. In 1957, the service was eighteen trains daily, of which nine were fast. There were nine trains on Sundays. The Schools Class locomotives worked the line until 1957 when steam was withdrawn on the Hastings line. Diesel-electric multiple units of what became British Rail Class 201, 202 and 203 (the "Hastings Diesels") took over working the route.Шаблон:Sfn

Under British Railways, classes D1, E1, H, N1, M7, Q, Q1, Std 3 2-6-2T, Std 4 2-6-0 Std 4 2-6-4T and U1 were permitted to work between Tonbridge and Grove junction. Freight trains from Tonbridge West Yard were not permitted to depart until the line was clear as far as Southborough Viaduct.Шаблон:Sfn Other classes of locomotive known to have worked over this section of line include C,Шаблон:Sfn and E4.Шаблон:Sfn

Diesel-electric era (1957–86)

Photograph showing a Hastings Unit at Cannon Street.
6S unit 1004 at Шаблон:Rws
Photograph showing a Class 33/2 locomotive. This sub-class were built to the Hastings line loading gauge.
Class 33/2

Special narrow bodied diesel electric multiple units were introduced in 1957–58 to replace steam traction. British Rail Class 201 (6S), 202 (6L) and 203 (6B) (the "Hastings Diesels") took over working the route. These units were constructed of narrow rolling stock. They were delivered in six-car formations (the 6Bs including a buffet car) and two units were often operated in multiple to form twelve-car trains.Шаблон:Sfn In latter years some of the units were reduced to five,Шаблон:Sfn and later still, to four cars.Шаблон:Sfn

The 6S units were intended to be introduced into service in June 1957. On 5Шаблон:NbspApril a fire at Cannon Street signal box disabled all signalling equipment there. As a result, locomotive-hauled trains were banned from the station. A temporary signal box was commissioned on 5Шаблон:NbspMay and the 6S units were introduced on peak services the next day. Two units coupled together formed the 06:58 and 07:26 Hastings–Cannon Street services in the morning, and the 17:18 and 18:03 Cannon Street–Hastings services in the evening. From 17Шаблон:NbspJune the 6S and 6L units were working services throughout the day. The 6B units entered service between May and August 1958.Шаблон:Sfn

The Hastings Diesels had almost completely replaced steam by June 1958.Шаблон:Sfn With the introduction of the Hastings Diesels, an hourly service was provided. This split at Tunbridge Wells, with the front portion running fast to Crowhurst and the rear portion stopping at all stations. The service ran every two hours on Sundays.Шаблон:Sfn The Hastings Diesels also worked services on the Bexhill West branch line until closure on 14Шаблон:NbspJune 1964.Шаблон:Sfn On 22Шаблон:NbspDecember 1958, 6L unit 1017 collided with 6B unit 1035 at Tunbridge Wells Central.Шаблон:Sfn[39]

In 1962, twelve Class 33/2 diesel locomotives, were also built with narrow bodies for the Hastings line. These enabled the last steam workings, overnight newspaper trains, to be withdrawn from the Hastings line.Шаблон:Sfn Nineteen British Rail Class 207 (3D) diesel electric multiple units were built in 1962.Шаблон:Sfn They operated over the Tonbridge–Grove Junction section of the line as part of a Tonbridge–Eastbourne (later Tonbridge–Eridge) service.Шаблон:SfnШаблон:Sfn In 1963, Frant, Stonegate, Wadhurst and Mountfield Halt were proposed to be closed under the Beeching Axe.Шаблон:Sfn One special working took place on 3Шаблон:NbspApril 1966 when one of the ex-Great Western Railway diesel railcars, W20W, was worked between Tonbridge and Robertsbridge as an out of gauge load. The railcar had been purchased by the Kent and East Sussex Railway for £415 including delivery to Robertsbridge. After trying to "wriggle out" of the deal, British Rail eventually found a solution. The vehicle was ballasted so that it leant away from the tunnel walls by some Шаблон:Convert and was worked to Robertsbridge at a maximum of Шаблон:Convert.Шаблон:Sfn From 1977, there were two trains an hour, one fast and one slow. In May 1980,Шаблон:Sfn the buffet cars were withdrawn from the 6B units, which were recoded as 5L, but retaining the Class 203 designation.Шаблон:Sfn The fast trains were withdrawn in January 1981, with trains now stopping at all stations.Шаблон:Sfn

Electric era (since 1986)

Photograph showing both sides of the souvenir ticket from the first day of electric train operation, 27Шаблон:NbspApril 1986.
Ticket from the first day of electric services, 27Шаблон:NbspApril 1986.
Photograph showing a 4CEP electric multiple unit at Hastings. The unit is in "Jaffa Cake" livery.
4CEP unit 1525 at Hastings.
Photograph showing an "Electrostar" electric multiple unit at Tonbrige.
Electrostar unit 375 610 Royal Tunbridge Wells at Шаблон:Rws on a Шаблон:Rws to Hastings train in May 2011.

On 28Шаблон:NbspOctober 1983, it was announced that the Hastings line was to be electrified. Reasons that decided the issue included a commitment by British Rail to eliminate asbestos from all stock in service by 1988 and the increasing cost of maintaining the then ageing Hastings Diesels. The scheme was to cost £23,925,000. Electrification was finally completed in 1986, the line was electrified using 750 V DC third rail using standard rolling stock, and the expedient of singling the track through the narrow tunnels. The tunnels either side of Tunbridge Wells Central station were not singled because the fact that the south portal of Wells Tunnel and north portal of Grove Hill Tunnel were at the ends of the platforms meant it was impossible to install pointwork without reducing the length of platform available. A speed restriction was imposed through Wells Tunnel. Parliamentary powers were sought in 1979 to bore a second Grove Hill Tunnel, but there was much opposition from local residents. This, and the high cost, caused the proposal to be abandoned. The track in Grove Hill Tunnel was relaid on a concrete base, allowing alignment to be precisely controlled.Шаблон:Sfn

The line was declared to conform to the standard C1 loading gauge on 14 March. The first passenger carrying train comprising C1 stock to use the line was a railtour on 15 March hauled by 50 025 Invincible. It was organised by the Southern Electric Group and ran from Paddington to Шаблон:Rws. A preview service of electric trains ran on 27 April 1986 and the full timetabled service commenced on 12 May 1986.Шаблон:Sfn The next day, a wrong-side failure occurred involving three signals between Tonbridge and Hastings. Contractors had made errors in the wiring of the signal heads.Шаблон:Sfn With the inauguration of electric services, a half-hourly service was operated, with trains departing from Charing Cross at 15 and 45 minutes past the hour. Those departing at xx:15 called at Шаблон:Rws, Sevenoaks, Tonbridge, High Brooms, Tunbridge Wells, Wadhurst, Battle, St Leonards Warrior Square and Hastings, taking 84 minutes. Those departing at xx:45 called at Waterloo East, London Bridge, Orpington, Sevenoaks, Шаблон:Rws, Tonbridge and then all stations to Hastings, taking 99 minutes.Шаблон:Sfn The Royal Train visited the line on 6 May, conveying Queen Elizabeth the Queen Mother. It was stabled at Wadhurst whilst she ate lunch. The train was hauled by a Class 73 diesel-electric locomotive.Шаблон:Sfn Upon electrification, services were operated by 4CEP,Шаблон:Sfn 4CIG and 4VEP electric multiple units.Шаблон:Sfn

Class 508 electric multiple units also operated services on the line from the Redhill direction as far as Tunbridge Wells.[40] When these units were withdrawn in the mid-2000s, they were replaced by Class 375 Electrostar,[41] Class 465 Networker and Class 466 Networker units.[42]

Train services on the line are provided by SE Trains, and are mostly operated by Class 375 Electrostar,[41] or occasionally Class 465/466 Networker units.[42] The line still sees a freight service to and from British Gypsum's sidings at Mountfield.[38] The line retains all its original intermediate station buildings, and is considered a well-preserved example of a Victorian secondary rail route.[43]

Accidents and incidents

A number of accidents have occurred on the Hastings line, none of which have involved the death of a passenger.

  • On 4Шаблон:NbspOctober 1852, a passenger train was derailed between Шаблон:Rws and Шаблон:Rws when the formation was flooded and washed away. Both engine crew members were injured.[44]
  • On 21Шаблон:NbspJune 1856, a passenger train derailed between Tunbridge Wells and Tunbridge Junction, killing the driver and injuring the fireman and a passenger.[45]
  • On [[Royal Charter Storm|25Шаблон:NbspOctober 1859]], almost Шаблон:Convert of track was washed away between St Leonards and Шаблон:Rws, affecting the Hastings line.[46]
  • On 23 June 1861, a collision between SER and LBSC passenger trains occurred at Bo Peep Junction, injuring around ten people. The SER train overran signals due to excessive speed, insufficient brakes, low rail adhesion or a combination of these factors.[47]
  • On 30 September 1866, the slip portion of a train, which was to be worked forwards to Hastings, failed to stop at Tunbridge due to an error by the slip guard. It crashed into a rake of empty carriages Шаблон:Convert east of the station. Eleven of the 40 passengers were injured.[48]
  • On 22Шаблон:NbspFebruary 1892, a SER locomotive was run into by a LBSC passenger train at Hastings. The passenger train had overrun a danger signal. Both locomotives were damaged.[49]
  • On 29Шаблон:NbspAugust 1896, the locomotive of a Charing Cross to Hastings train was derailed near Шаблон:Rws when it collided with a traction engine and threshing machine using an occupation crossing.[50]
  • On 29 April 1912, SECR F1 class locomotive No. 216 was working an empty stock train when it suffered the failure of the firebox crown near Tunbridge Wells due to a lack of water in the boiler. Both engine crew were severely injured by escaping steam and jumping from the moving locomotive.[51]
  • On 6Шаблон:NbspJanuary 1930, the rear carriages of a passenger train from Hastings to London were partially buried by a landslip near Wadhurst tunnel. The train was divided and the front part continued on to Tunbridge Wells, where it arrived 100 minutes late.[52]
  • On 23Шаблон:NbspDecember 1958, 6L unit 1017 collided with 6B unit 1035 at Tunbridge Wells Central. Eighteen people were injured, with three of them admitted to hospital.Шаблон:Sfn[39]
  • On 8 November 2010, a passenger train operated by Class 375 unit 375 711 failed to stop at Шаблон:Rws station due to maintenance errors in respect of the train's sanding apparatus. The train overran the station by Шаблон:Convert. Following the incident, Southeastern reduced the interval that the sand hoppers were to be refilled from seven days to five days.[53] The company was fined £65,000 and ordered to pay £22,589 in costs.[54]
  • On 23 December 2013, a landslip at Wadhurst was the first in a series of landslips up to February 2014 which led the line between Wadhurst and St. Leonards Warrior Square being closed and reopened three times, with speed restrictions in place following repairs. The train service was replaced by buses during closures.[55][56][57][58][59] Southeastern was criticised by Hastings and Rye MP Amber Rudd over poor customer service during this period.[60] By 12 March, the section between Wadhurst and Robertsbridge had reopened,[61] with full service being restored on 31 March.[62]

Notes

  1. Шаблон:Note Information for this route-map of the Hastings line was compiled from various sources.Шаблон:SfnШаблон:SfnШаблон:Sfn
  2. Шаблон:Note The modern spelling of "Tonbridge" was not adopted as the official spelling until 1870.Шаблон:Sfn
  3. Шаблон:Note A gradient of 1 in 47 means that the line climbs (or descends) by 1 foot in 47 feet, or 1 metre in 47 metres horizontal distance.
  4. Шаблон:Note This was the route of the line during the time that Tunbridge Wells Central Goods served as a passenger station. The line between Tunbridge and Orpington did not open until 1Шаблон:NbspMay 1868.Шаблон:Sfn
  5. Шаблон:Note Шаблон:Rws was reached by railway in 1880, with the opening of the Cuckoo Line.Шаблон:Sfn
  6. Шаблон:Note Trains designated as "fast" did not call at every station. "Slow" trains called at all stations.

Footnotes

Шаблон:Reflist

References

Шаблон:Refbegin

Шаблон:Refend

External links

Шаблон:Commons category

Шаблон:Railway lines in South East England

  1. 1,0 1,1 1,2 1,3 1,4 Шаблон:Cite web
  2. Шаблон:Ukhansard Hansard website
  3. Шаблон:Ukhansard Hansard website
  4. Шаблон:Ukhansard Hansard website
  5. Шаблон:UkhansardHansard website
  6. Шаблон:UkhansardHansard website
  7. Шаблон:Ukhansard Hansard website
  8. Шаблон:Cite news
  9. 9,0 9,1 9,2 9,3 9,4 Шаблон:Cite web
  10. Шаблон:Cite news
  11. Шаблон:Cite news
  12. Шаблон:Cite news
  13. Шаблон:Cite newspaper The Times
  14. Шаблон:Cite news
  15. Шаблон:Cite news
  16. Шаблон:Cite news
  17. Шаблон:Cite web
  18. 18,00 18,01 18,02 18,03 18,04 18,05 18,06 18,07 18,08 18,09 18,10 18,11 18,12 18,13 18,14 Шаблон:Cite web
  19. Шаблон:Cite web
  20. 20,0 20,1 Шаблон:Cite web
  21. Шаблон:Cite web
  22. Шаблон:Cite web
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite journal
  26. Шаблон:Cite newspaper The Times
  27. Шаблон:Cite journal
  28. Шаблон:Cite newspaper The Times
  29. Шаблон:Cite newspaper The Times
  30. Шаблон:Cite web
  31. Шаблон:Cite news
  32. Шаблон:Cite news
  33. Шаблон:Cite news
  34. Шаблон:Cite news
  35. Шаблон:Cite news
  36. Шаблон:Cite news
  37. 38,0 38,1 Шаблон:Cite web
  38. 39,0 39,1 Шаблон:Cite newspaper The Times
  39. Шаблон:Cite web
  40. 41,0 41,1 Шаблон:Cite web
  41. 42,0 42,1 Шаблон:Cite web
  42. Шаблон:Cite web
  43. Шаблон:Cite newspaper The Times
  44. Шаблон:Cite newspaper The Times
  45. Шаблон:Cite news
  46. Шаблон:Cite web
  47. Шаблон:Cite web
  48. Шаблон:Cite newspaper The Times
  49. Шаблон:Cite newspaper The Times
  50. Шаблон:Cite web
  51. Шаблон:Cite newspaper The Times
  52. Шаблон:Cite web
  53. Шаблон:Cite news
  54. Шаблон:Cite news
  55. Шаблон:Cite news
  56. Шаблон:Cite news
  57. Шаблон:Cite news
  58. Шаблон:Cite web
  59. Шаблон:Cite news
  60. Шаблон:Cite news
  61. Шаблон:Cite news