Английская Википедия:Hexie (train)
Шаблон:Short description Шаблон:Hatnote Шаблон:Infobox EMU Шаблон:Chinese
Hexie (Шаблон:Zh), also known as the CRH series EMU, is an umbrella term for the multiple unit high-speed and higher-speed trains operated by China Railway under the China Railway High-speed brand. All series of Hexie are based on foreign-developed technology and later manufactured locally in China through technology transfer licenses, with the ultimate goal of China acquiring the know-how and capability to produce high-speed rail trains.
The Harmony series does not belong to any single platform, instead encompassing all high-speed trains in China with roots in foreign technology, specifically CRH1, CRH2, CRH3 and CRH5. Although later variants of Hexie such as CRH380A were designed by Chinese companies, they are still classified as CRH due to incorporation of foreign technology.
History
In 2007, China's Ministry of Railways drafted a plan for China's future high-speed network. Bombardier Transportation, Kawasaki Heavy Industries, Alstom and later Siemens joined the high-speed train manufacturing project that later became known as Harmony. Forming joint-ventures with Chinese company CNR and CSR, these four foreign companies signed agreements with China to manufacture high-speed trains for China as well as provide assistance for Chinese companies to manufacture train cars locally in the future.
While the initial train sets from each Hexie series were manufactured overseas, subsequent sets are manufactured locally through technology transfer, a key requirement for China. The signalling, track and support structures, control software, and station design are developed domestically with foreign elements as well. Although the first domestically produced trains were initially delivered in complete knock-down form, eventually manufacturing as a whole became predominantly Chinese.[1]
China currently holds many patents related to the internal components of these trains, re-designed in China to allow the trains to run at higher speeds than the foreign designs allowed. However, these patents are only valid within China, and as such hold no international power. This weakness on the intellectual property of Hexie trains became an obstruction for China to export its high-speed rail related products, leading to the development of a completely redesigned train brand, Fuxing, which is based on indigenous technologies.[1][2][3]
While most Hexie series trains are designed for China Railway, a variant of the CRH380A has been modified for operation by MTR Corporation of Hong Kong, who will operate these trains under the brand Vibrant Express specifically for the Guangzhou–Shenzhen–Hong Kong Express Rail Link.
Variants
The Harmony brand has different electric multiple unit trainsets, the designs for which are imported from other nations and designated CRH-1 through CRH-5 and CRH380A(L), CRH380B(L), and CRH380C(L). CRH trainsets are intended to provide fast and convenient travel between cities. Some of the trainsets are manufactured locally through technology transfer, a key requirement for China. The signalling, track and support structures, control software, and station design are developed domestically with foreign elements as well, so the system as a whole is predominantly Chinese.[1] China currently holds many new patents related to the internal components of these trains, re-designed in China to allow the trains to run at higher speeds than the foreign designs allowed. However, these patents are only valid within China, and as such hold no international power.[1][2][3]
The trainsets are as follows:
- CRH1 produced by Bombardier Transportation's joint venture Sifang Power (Qingdao) Transportation (BST), CRH1A, and CRH1B, nicknamed "Metro" or "Bread", derived from Bombardier's Regina; CRH1E, nicknamed "Lizard", is Bombardier's ZEFIRO 250 design.
- CRH1A: sets consists of 8 cars; maximum operating speed of Шаблон:Cvt
- CRH1B: a modified 16-car version; maximum operating speed of Шаблон:Cvt
- CRH1E: a 16-car high-speed sleeper version; maximum operating speed of Шаблон:Cvt
- CRH2: nicknamed "Hairtail", derived from E2 Series 1000 Shinkansen.
- CRH2A: In 2006, China unveiled CRH2, a modified version of the Japanese Shinkansen E2-1000 series. An order for 60 8-car sets had been placed in 2004, with the first few built in Japan, the rest produced by Sifang Locomotive and Rolling Stock in China.[4]
- CRH2B: a modified 16-car version of CRH2; maximum operating speed of Шаблон:Cvt
- CRH2C (Stage one): a modified version of CRH2 with a maximum operating speed up to Шаблон:Cvt as a result of replacing two intermediate trailer cars with motored cars
- CRH2C (Stage two): a modified version of CRH2C (stage one) has a maximum operating speed up to Шаблон:Cvt by using more powerful motors
- CRH2E: a modified 16-car version of CRH2 with sleeping cars
- CRH3: nickname "Rabbit", derived from Siemens ICE3 (class 403); 8-car sets; maximum operating speed of Шаблон:Cvt.
- CRH5A: derived from Alstom Pendolino ETR600; 8-car sets; maximum operating speed of Шаблон:Cvt.[5]
- CRH6: designed by CSR Puzhen and CSR Sifang, will be manufactured by CSR Jiangmen. It is designed to have two versions: one with a top operating speed of Шаблон:Cvt; the other with a top operating speed of Шаблон:Cvt. They will be used on Шаблон:Cvt or Шаблон:Cvt Inter-city High Speed Rail lines; planned to enter service by 2011.Шаблон:Clarify
- CRH380A; Maximum operating speed of Шаблон:Cvt. Developed by CSR and manufactured by Sifang Locomotive and Rolling Stock; entered service in 2010.
- CRH380B: upgraded version of CRH3; maximum operating speed of Шаблон:Cvt, manufactured by Tangshan Railway Vehicle and CRRC Changchun Railway Vehicles; entered service in 2011.
- CRH380CL: designed and manufactured by CRRC Changchun Railway Vehicles. Maximum operating speed of 380 km/h; planned to enter service in 2012.
- CRH380D: also named Zefiro 380; maximum operating speed of Шаблон:Cvt, manufactured by Bombardier Sifang (Qingdao) Transportation Ltd.; planned to enter service in 2012.
- CRH380D: 8-car version
CRH1A, B,E, CRH2A, B,E, and CRH5A are designed for a maximum operating speed (MOR) of Шаблон:Cvt and can reach up to Шаблон:Cvt. CRH3C and CRH2C designs have an MOR of Шаблон:Cvt, and can reach up to Шаблон:Cvt, with a top testing speed more than Шаблон:Cvt. However, in practical terms, issues such as maintenance costs, comfort, and safety make the maximum speed of more than Шаблон:Cvt impractical and remain limiting factors.
Train type | Car dimensions | Total length | Top speed | Seating capacity | Formation | Power output (under 25 kV) |
Entry into Service |
---|---|---|---|---|---|---|---|
CRH1 | |||||||
CRH1A–200 | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
673: 144 first and 529 standard 612: 128 first and 484 standard |
5M3T | Шаблон:Convert | February 1, 2007 |
CRH1A–250 | Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
597: 144 first and 453 standard 646: 128 first and 518 standard 635: 128 first and 507 standard 673: 144 first and 529 standard |
September ?, 2010 | ||||
CRH1B | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1299: 208 first and 1091 standard | 10M6T | Шаблон:Convert | May 1, 2009 | |
CRH1B (1E head) | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
1299: 208 first and 1091 standard | ||||
CRH1E | Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
618: 122 standard, 16 luxury sleepers and 480 soft sleepers 642: 122 standard and 520 soft sleepers |
November 4, 2009 | ||||
CRH1A–A | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
613: 48 first and 565 standard | 5M3T | Шаблон:Convert | February 1, 2016 | |
CRH1E–250 | Calculated:Шаблон:Convert Real:Шаблон:Convert |
642: 110 standard and 532 soft sleepers | 10M6T | Шаблон:Convert | January 29, 2016 | ||
CRH380D | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
554: 10 sightseeing, 32 first and 512 standard 556: 10 business, 28 first and 518 standard |
4M4T | Шаблон:Convert | April 19, 2014 |
CRH2 | |||||||
CRH2G | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
613: 48 first and 565 standard | 4M4T | Шаблон:Convert | January 8, 2016 |
CRH2A (EC) | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width: Шаблон:Convert Height:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
November 6, 2013 | ||||
CRH2A (Old) | Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
610: 51 first and 559 standard | January 28, 2007 | ||||
CRH2C Stage 1 | Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
6M2T | Шаблон:Convert | August 1, 2008 | |||
CRH2C Stage 2 | Test: N/A Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
Шаблон:Convert | February 6, 2010 | ||||
CRH2B | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1240: 155 first and 1075 standard | 8M8T | Шаблон:Convert | August 1, 2008 | |
CRH2E | Test: N/A Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
630: 110 standard and 520 soft sleepers | December 1, 2008 | ||||
CRH2E–NG | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
642: 110 standard and 532 soft sleepers | December 14, 2015 | ||||
End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
880: 880 soft sleepers | July 1, 2017 | |||
CRH380A | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test:Шаблон:Convert Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
480: 18 sightseeing, 89 first and 373 standard | 6M2T | Шаблон:Convert | September 30, 2010 |
CRH380A (New) | Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
556: 10 business, 28 first and 518 standard | January 16, 2014 | ||||
CRH380AL | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1028: 28 business, 162 first and 838 standard 1061: 20 business, 118 first and 923 standard |
14M2T | Шаблон:Convert | June 30, 2011 | |
CRH3 | |||||||
CRH3A | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height: Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
613: 48 first and 565 standard | 4M4T | Other sets: Шаблон:Convert Set Nº. 5257: Шаблон:Convert |
October 4, 2017 |
CRH3C | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
546: 16 special, 40 first and 490 standard | 4M4T | Шаблон:Convert | August 1, 2008 |
CRH380BG | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
551: 16 sightseeing, 44 first and 491 standard 556: 10 sightseeing, 28 first and 518 standard |
4M4T | Шаблон:Convert | October 9, 2012 | |
CRH380BL | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1005: 28 business, 186 first and 791 standard 1015: 26 business, 118 first and 871 standard |
8M8T | Шаблон:Convert | January 13, 2011 | |
CRH380B | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
556: 10 business, 28 first and 518 standard | 4M4T | Шаблон:Convert | January 16, 2014 |
CRH380CL | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design:Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1029: 28 business, 130 first and 871 standard 1015: 26 business, 118 first and 871 standard |
8M8T | Шаблон:Convert | April 3, 2013 |
CRH5 | |||||||
CRH5A | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
622: 60 first and 562 standard 586: 112 first and 474 standard |
5M3T | Other sets: Шаблон:Convert Set Nº. 5191: Шаблон:Convert |
April 18, 2007 |
CRH5G (Old) | Test: N/A Design:Шаблон:Convert / Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
613: 48 first and 565 second class | December 26, 2014 | ||||
CRH5G (New) | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert | |||||
CRH5E | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: N/A Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
642: 110 standard and 532 soft sleepers 880: 880 soft sleepers |
10M6T | Шаблон:Convert | Under testing | |
CRH6 | |||||||
CRH6A | End cars length:Шаблон:Convert Inter cars length:Шаблон:Convert Width:Шаблон:Convert Height:Шаблон:Convert |
Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1488: 557 standard and 931 standings 1488: 477 standard and 1011 standings 613: 48 first and 565 standard |
4M4T | Шаблон:Convert | February 12, 2014 |
CRH6A–A | Calculated:Шаблон:Convert Real:Шаблон:Convert |
688: 252 standard and 436 standings | 2M2T | Шаблон:Convert | Under testing | ||
CRH6F | Calculated:Шаблон:Convert Real:Шаблон:Convert |
Test: Шаблон:Convert Design: Шаблон:Convert Continuous operation:Шаблон:Convert Current operation:Шаблон:Convert |
1988: ... standard and ... standings | 4M4T | Шаблон:Convert | July 11, 2015 | |
CRH6F–A | Calculated:Шаблон:Convert Real:Шаблон:Convert |
875: ... standard and ... standings | 2M2T | Шаблон:Convert | March 26, 2018 |
Chinese CRH trainsets order timetable
Date | Factory | Speed Level | Type | Quantity (set) |
Quantity (car) |
Amount |
---|---|---|---|---|---|---|
2004-10-10[6] | Alstom | 250 km/h | CRH5A | 3 | 24 | 620 million EUR |
CNR Changchun | 57 | 456 | ||||
2004-10-12[7] | BST (Bombardier & CSR) | 250 km/h | CRH1A | 20 | 160 | US$350 million |
2004-10-20[8] | Kawasaki | 250 km/h | CRH2A | 3 | 24 | 9,300 million RMB |
CSR Sifang | 57 | 456 | ||||
2005-05-30[9] | BST | 250 km/h | CRH1A | 20 | 160 | US$350 million |
2005-06[8] | CSR Sifang | 300 km/h | CRH2C Stage one | 30 | 240 | 8,200 million RMB |
350 km/h | CRH2C Stage two | 30 | 240 | |||
2005-11-20[10] | Siemens | 350 km/h | CRH3C | 3 | 24 | 13,000 million RMB |
CNR Tangshan | 57 | 456 | ||||
2007-10-31[11] | BST | 250 km/h | CRH1B | 20 | 320 | 1,000 million EUR |
CRH1E | 20 | 320 | ||||
2007-11[12] | CSR Sifang | 250 km/h | CRH2B | 10 | 160 | 1,200 million RMB |
2007-11[8] | CSR Sifang | 250 km/h | CRH2E | 6 | 96 | 900 million RMB |
2008-12-06[8] | CSR Sifang | 250 km/h | CRH2E | 14 | 224 | 2,100 million RMB |
2009-09-23[13] | CNR Changchun | 250 km/h | CRH5A | 30 | 240 | 4,800 million RMB |
2009-03-16[14] | CNR Tangshan | 380 km/h | CRH380BL | 70 | 1,120 | 39,200 million RMB |
CNR Changchun | 30 | 480 | ||||
2009-09-28[15] | CSR Sifang | 380 km/h | CRH380A | 40 | 320 | 45,000 million RMB |
CRH380AL | 100 | 1,600 | ||||
2009-09-28[15] Modified 2012-09-05[16] |
BST | 380 km/h | CRH380D | 70 | 560 | 27,400 million RMB |
250 km/h | CRH1A | 46 | 368 | |||
250 km/h | Zefiro 250NG | 60 | 480 | |||
2009-09-28[17] | CNR Changchun | 380 km/h | CRH380B | 40 | 320 | 23,520 million RMB |
CRH380BL | 15 | 240 | ||||
CRH380CL | 25 | 400 | ||||
2009-09-28[18] | CNR Tangshan | 350 km/h | CRH3C[19] | 20 | 160 | 3,920 million RMB |
2009-12-30[20] | CSR Puzhen | 220 km/h | CRH6 | 24 | 192 | 2,346 million RMB |
2010-07-16[21] | BST | 250 km/h | CRH1A | 40 | 320 | 5,200 million RMB |
2010-09-14[22] | CSR Sifang | 250 km/h | CRH2A | 40 | 320 | 3,400 million RMB |
2010-10-13[23] | CNR Changchun | 250 km/h | CRH5A | 20 | 160 | 2,700 million RMB |
2011-04-26 | CNR Changchun | 250 km/h | CRH5A | 30 | 240 | 3,870 million RMB |
Total | 1050 | 10,240 |
Chinese CRH trainsets delivery timetable
Based on data published by Sinolink Securities;[24][25] some small changes were made according to the most recent news.
Type | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | Future (plan) |
Total |
CRH1A | 8 | 18 | 12 | 2 | 20 | 20 | 106 | 80 |
CRH2A | 19 | 41 | 15 | 25 | 100 | |||
CRH5A | 27 | 29 | 4 | 30 | 20 | 30 | 140 | |
CRH1B | 4 | 9 | 7 | 20 | ||||
CRH1E | 3 | 8 | 9 | 20 | ||||
CRH2B | 10 | 10 | ||||||
CRH2E | 6 | 14 | 20 | |||||
CRH2C | 10 | 20 | 30 | 60 | ||||
CRH3C | 7 | 36 | 37 | 80 | ||||
CRH380A | 40 | 40 | ||||||
CRH380AL | 6 | 94 | 100 | |||||
CRH380B | 20 | 20Шаблон:Ref | 40 | |||||
CRH380BL | 11 | 49 | 55Шаблон:Ref | 115 | ||||
CRH380CL | 25Шаблон:Ref | 25 | ||||||
CRH380D | 70Шаблон:Ref | 70 | ||||||
CRH380DL | 0Шаблон:Ref | 0 | ||||||
CRH6 | 24 | 24 | ||||||
Total | 27 | 86 | 78 | 88 | 204 | 237 | 330 | 1050 |
Cumulative | 27 | 113 | 191 | 279 | 483 | 744 | 1050 | 1050 |
- Шаблон:Note All CRH380B and CRH380C units to be delivered before 2012.
- Шаблон:Note All CRH380D units to be delivered before 2014.
Gallery
-
Two coupled 8-car CRH1A electric multiple unit train sets in Nanchang
-
CRH2 First Class Coach
-
CRH2 Second Class Coach
-
China CRH2C locomotives at Shanghai Hongqiao Station
-
Premier-class cabin inside Beijing-Tianjin Intercity CRH3 train
-
CRH2C and CRH3C at Tianjin railway station
-
CRH380BL Business Coach
-
CRH380CL at Beijing South railway station
-
CRH380D at Beijing South railway station
See also
- China Railway High-speed, Chinese high-speed railway service
- China Railway, Chinese state-owned corporation that operates nearly all Harmony trains.
- Fuxing (train), next-generation EMU developed by China with independent intellectual property rights.
References
Шаблон:High-speed rail in the People's Republic of China Шаблон:High-speed rail Шаблон:Transport in China
- ↑ 1,0 1,1 1,2 1,3 Шаблон:Cite news
- ↑ 2,0 2,1 Шаблон:Cite news
- ↑ 3,0 3,1 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 8,0 8,1 8,2 8,3 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 15,0 15,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- Страницы с неработающими файловыми ссылками
- Английская Википедия
- High-speed trains of China
- Electric multiple units of China
- Passenger trains running at least at 350 km/h in commercial operations
- Passenger trains running at least at 200 km/h in commercial operations
- CRRC multiple units
- 25 kV AC multiple units
- Train-related introductions in 2007
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии