Английская Википедия:High-speed rail in China

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Hatnote Шаблон:Multiple image

The high-speed rail (HSR) network in the People's Republic of China (PRC) is the world's longest and most extensively used – with a total length of Шаблон:Convert by the end of 2023.[1][2][3] The HSR network encompasses newly built rail lines with a design speed of Шаблон:Convert.[4] China's HSR accounts for two-thirds of the world's total high-speed railway networks.[5][6] Almost all HSR trains, track and service are owned and operated by the China Railway Corporation under the brand China Railway High-speed (CRH).

High-speed rail developed rapidly in China since the mid-2000s. CRH was introduced in April 2007 and the Beijing-Tianjin intercity rail, which opened in August 2008, was the first passenger dedicated HSR line. Currently, the HSR extends to all provincial-level administrative divisions and Hong Kong SAR with the exception of Macau SAR.Шаблон:NoteTagШаблон:NoteTagШаблон:NoteTag

Notable HSR lines in China include the Beijing–Kunming high-speed railway which at Шаблон:Convert is the world's longest HSR line in operation, and the Beijing–Shanghai high-speed railway with the world's fastest operating conventional train services. The Shanghai Maglev is the world's first high-speed commercial magnetic levitation ("maglev") line that reach a top speed of Шаблон:Convert.[7]

Economics of the high-speed rail has been a topic of discussion.[8][9] A 2019 study produced by TransFORM, a knowledge platform developed by the World Bank and China’s Ministry of Transport, estimated the annual rate of economic return of China's high-speed rail network in 2015, to be at 8 percent, which is well above the opportunity cost of capital in China for major long term infrastructure investments. The study also noted a range of benefits which included shortened travel times, improved safety and better facilitation of tourism, labor and mobility, as well as reducing highway congestion, accidents and greenhouse emissions as some automobile travellers switch from car use to rail.[10][11] A 2020 study by Paulson Institute has estimated the net benefit of the high-speed rail system to be approximately $378 billion, with an annual return on investment of 6.5%.[12]

Definition and terminology

High-speed rail in China is officially defined as "newly-built passenger-dedicated rail lines designed for electrical multiple unit (EMU) train sets traveling at not less than Шаблон:Convert (including lines with reserved capacity for upgrade to the Шаблон:Convert standard) on which initial service operate at not less than Шаблон:Convert."Шаблон:Sfn EMU train sets have no more than 16 railcars with axle load not greater than 17 tonnes and a headway of three minutes or less.Шаблон:Sfn

Thus, high-speed rail service in China requires high-speed EMU train sets to be providing passenger service on high speed rail lines at speeds of not less than Шаблон:Convert. EMU trains operating on non-high speed track or otherwise but at speeds below Шаблон:Convert are not considered high-speed rail. Certain mixed use freight and passenger rail lines, that can be upgraded for train speeds of Шаблон:Convert, with current passenger service of at least Шаблон:Convert, are also considered high-speed rail.Шаблон:Sfn

In common parlance, high-speed train service in China generally refers to G-, D- and C-class passenger train service.

High-speed ridership statistics in China are often reported as the number of passengers carried by high-speed EMU train sets, and such figures typically include passengers on EMU trains operating on non-high speed track or at service speeds below Шаблон:Convert.[13]

History

Файл:Asia Express (2).jpg
The Asia Express steam locomotive, which operated commercially from 1934 to 1943 in Manchuria could reach Шаблон:Convert and was one of the fastest trains in Asia.

Precursor

The earliest example of higher-speed commercial train service in China was the Asia Express, a luxury passenger train that operated in Japanese-controlled Manchuria from 1934 to 1943.[14] The steam-powered train, which ran on the South Manchuria Railway from Dalian to Xinjing (Changchun), had a top commercial speed of Шаблон:Convert and a test speed of Шаблон:Convert.[14] It was faster than the fastest trains in Japan at the time. After the founding of the People's Republic of China in 1949, this train model was renamed the SL-7 and was used by the Chinese Minister of Railways.

Early planning

Файл:N595ncd80.JPG
In the early 1990s, diesel locomotives in China could attain a maximum speed of Шаблон:Convert on passenger trains. Here a DF4 diesel locomotive is shown hauling passenger coaches on the Guangzhou–Sanshui Railway at Foshan in 2008.

State planning for China's current high-speed railway network began in the early 1990s under the leadership of Deng Xiaoping. He set up what became known as the "high-speed rail dream" after his visit to Japan in 1978, where he was deeply impressed by the Shinkansen, the world's first high speed rail system.[15] In December 1990, the Ministry of Railways (MOR) submitted to the National People's Congress a proposal to build a high-speed railway between Beijing and Shanghai.[16] At the time, the Beijing–Shanghai Railway was already at capacity, and the proposal was jointly studied by the Science & Technology Commission, State Planning Commission, State Economic & Trade Commission, and the MOR.[16] In December 1994, the State Council commissioned a feasibility study for the line.[16]

Policy planners debated the necessity and economic viability of high-speed rail service. Supporters argued that high-speed rail would boost future economic growth. Opponents noted that high-speed rail in other countries were expensive and mostly unprofitable. Overcrowding on existing rail lines, they said, could be solved by expanding capacity through higher speed and frequency of service.Шаблон:Citation needed In 1995, Premier Li Peng announced that preparatory work on the Beijing Shanghai HSR would begin in the 9th Five Year Plan (1996–2000), but construction was not scheduled until the first decade of the 21st century.

The "Speed Up" campaigns

Шаблон:Main

Шаблон:Multiple image

In 1993, commercial train service in China averaged only Шаблон:Convert and was steadily losing market share to airline and highway travel on the country's expanding network of expressways.[17][18] The MOR focused modernization efforts on increasing the service speed and capacity on existing lines through double-tracking, electrification, improving grade (through tunnels and bridges), reducing turn curvature and installing continuous welded rail. Through five rounds of "Speed-Up" campaigns in April 1997, October 1998, October 2000, November 2001, and April 2004, passenger service on Шаблон:Convert of existing tracks was upgraded to reach sub-high speeds of Шаблон:Convert.[19]

A notable example is the Guangzhou–Shenzhen railway, which in December 1994 became the first line in China to offer sub-high-speed service of Шаблон:Convert using domestically produced DF-class diesel locomotives. The line was electrified in 1998, and Swedish-made X 2000 trains increased service speed to Шаблон:Convert. After the completion of a third track in 2000 and a fourth in 2007, the line became the first in China to run high-speed passenger and freight service on separate tracks.

The completion of the sixth round of the "Speed-Up" Campaign in April 2007 brought HSR service to more existing lines: Шаблон:Convert capable of Шаблон:Convert train service and Шаблон:Convert capable of Шаблон:Convert.[20]Шаблон:NoteTag In all, travel speed increased on Шаблон:Convert, or one-fifth, of the national rail network, and the average speed of passenger trains improved to Шаблон:Convert. The introduction of more non-stop service between large cities also helped to reduce travel time. The non-stop express train from Beijing to Fuzhou shortened travel time from 33.5 to less than 20 hours.[21] In addition to track and scheduling improvements, the MOR also deployed faster CRH series trains. During the Sixth Railway Speed Up Campaign, 52 CRH trainsets (CRH1, CRH2 and CRH5) entered into operation. The new trains reduced travel time between Beijing and Shanghai by two hours to just under 10 hours. Some 295 stations have been built or renovated to allow high-speed trains.[22][23]

The conventional rail v. maglev debate

The development of the HSR network in China was initially delayed by a debate over the type of track technology to be used. In June 1998, at a State Council meeting with the Chinese Academies of Sciences and Engineering, Premier Zhu Rongji asked whether the high-speed railway between Beijing and Shanghai still being planned could use maglev technology.[24] At the time, planners were divided between using high-speed trains with wheels that run on conventional standard gauge tracks or magnetic levitation trains that run on special maglev tracks for a new national high-speed rail network.

Maglev received a big boost in 2000 when the Shanghai Municipal Government agreed to purchase a turnkey TransRapid train system from Germany for the Шаблон:Convert rail link connecting Shanghai Pudong International Airport and the city. In 2004, the Shanghai Maglev Train became the world's first commercially operated high-speed maglev. Шаблон:As of, it remains the fastest commercial train in the world with peak speeds of Шаблон:Convert and makes the Шаблон:Convert trip in less than 7.5 minutes. Шаблон:Multiple image

Файл:A maglev train coming out, Pudong International Airport, Shanghai.jpg
The Shanghai maglev train running on a special maglev track, departing the Shanghai Pudong International Airport. The maglev train can reach a top speed of Шаблон:Convert.

Despite unmatched advantage in speed, the maglev has not gained widespread use in China's high-speed rail network due to high cost, German refusal to share technology and concerns about safety. The price tag of the Shanghai Maglev was believed to be $1.3 billion and was partially financed by the German government. The refusal of the Transrapid Consortium to share technology and source production in China made large-scale maglev production much more costly than high-speed train technology for conventional lines. Finally, residents living along the proposed maglev route have raised health concerns about noise and electromagnetic radiation emitted by the trains, despite an environmental assessment by the Shanghai Academy of Environmental Sciences saying the line was safe.[25] These concerns have prevented the construction of the proposed extension of the maglev to Hangzhou. Even the more modest plan to extend the maglev to Shanghai's other airport, Hongqiao, has stalled. Instead, a conventional subway line was built to connect the two airports, and a conventional high-speed rail line was built between Shanghai and Hangzhou.

While maglev was drawing attention to Shanghai, conventional track HSR technology was being tested on the newly completed Qinhuangdao-Shenyang Passenger Railway. This Шаблон:Convert standard gauge, dual-track, electrified line was built between 1999 and 2003. In June 2002, a domestically made DJF2 train set a record of Шаблон:Convert on the track. The China Star (DJJ2) train followed the same September with a new record of Шаблон:Convert. The line supports commercial train service at speeds of Шаблон:Convert, and has become a segment of the rail corridor between Beijing and Northeast China. The Qinhuangdao-Shenyang Line showed the greater compatibility of HSR on conventional track with the rest of China's standard gauge rail network.

In 2004, the State Council in its Mid-to-Long Term Railway Development Plan, adopted conventional track HSR technology over maglev for the Beijing–Shanghai High Speed Railway and three other north–south high-speed rail lines. This decision ended the debate and cleared the way for rapid construction of standard gauge, passenger dedicated HSR lines in China.[26][27]

Acquisition of foreign technology

Шаблон:Multiple image Шаблон:Multiple image Шаблон:Multiple image Шаблон:Multiple image Despite setting speed records on test tracks, the DJJ2, DJF2 and other domestically produced high-speed trains were insufficiently reliable for commercial operation.[28] The State Council turned to advanced technology abroad but made clear in directives that China's HSR expansion could not only benefit foreign economies and should also be used to develop its own high-speed train building capacity through technology transfers.[28] The State Council, MOR and state-owned train builders used China's large market and competition among foreign train-makers to force technology transfers of foreign high speed rail technologyШаблон:Citation needed. This would later allow the Chinese government through CRRC to make the more reliable Fuxing Hao and Hexie Hao trains. The CRH380 series(or family) of trains was initially built with direct cooperation (or help) from foreign trainmakers, but newer trainsets are based on transferred technology, just like the Hexie and Fuxing Hao.

In 2003, the MOR was believed to favor Japan's Shinkansen technology, especially the 700 series.[28] The Japanese government touted the 40-year track record of the Shinkansen and offered favorable financing. A Japanese report envisioned a winner-take all scenario in which the winning technology provider would supply China's trains for over Шаблон:Convert of high-speed rail.[29] However, Chinese citizens angry with Japan's denial of World War II war crimes organized a web campaign to oppose the awarding of HSR contracts to Japanese companies. The protests gathered over a million signatures and politicized the issue.[30] The MOR delayed the decision, broadened the bidding and adopted a diversified approach to adopting foreign high-speed train technology.

In June 2004, the MOR solicited bids to make 200 high-speed train sets that can run Шаблон:Convert.[28] Alstom of France, Siemens of Germany, Bombardier Transportation based in Germany and a Japanese consortium led by Kawasaki all submitted bids. With the exception of Siemens which refused to lower its demand of CN¥350 million per train set and €390 million for the technology transfer, the other three were all awarded portions of the contract.[28] All had to adapt their HSR train-sets to China's own common standard and assemble units through local joint ventures (JV) or cooperate with Chinese manufacturers. Bombardier, through its joint venture with CSR's Sifang Locomotive and Rolling Stock Co (CSR Sifang), Bombardier Sifang (Qingdao) Transportation Ltd (BST) won an order for 40 eight-car train sets based on Bombardier's Regina design.[31] These trains, designated CRH1A, were delivered in 2006. Kawasaki won an order for 60 train sets based on its E2 Series Shinkansen for ¥9.3 billion.[32] Of the 60 train sets, three were directly delivered from Nagoya, Japan, six were kits assembled at CSR Sifang Locomotive & Rolling Stock, and the remaining 51 were made in China using transferred technology with domestic and imported parts.[33] They are known as CRH2A. Alstom also won an order for 60 train sets based on the New Pendolino developed by Alstom-Ferroviaria in Italy. The order had a similar delivery structure with three shipped directly from Savigliano along with six kits assembled by CNR's CRRC Changchun Railway Vehicles, and the rest locally made with transferred technology and some imported parts.[34] Trains with Alstom technology carry the CRH5 designation.

The following year, Siemens reshuffled its bidding team, lowered prices, joined the bidding for Шаблон:Convert trains and won a 60-train set order.[28] It supplied the technology for the CRH3C, based on the ICE3 (class 403) design, to CNR's Tangshan Railway Vehicle Co. Ltd. The transferred technology includes assembly, body, bogie, traction current transforming, traction transformers, traction motors, traction control, brake systems, and train control networks.

Technology transfer

Achieving indigenous high-speed rail technology has been a major goal of Chinese state planners. Chinese train-makers, after receiving transferred foreign technology, have been able to achieve a considerable degree of self-sufficiency in making the next generation of high-speed trains by developing indigenous capability to produce key parts and improving upon foreign designs. Шаблон:Multiple image Examples of technology transfer include Mitsubishi Electric’s MT205 traction motor and ATM9 transformer to CSR Zhuzhou Electric, Hitachi’s YJ92A traction motor and Alstom’s YJ87A Traction motor to CNR Yongji Electric, Siemens’ TSG series pantograph to Zhuzhou Gofront Electric. Most of the components of the CRH trains manufactured by Chinese companies were from local suppliers, with only a few parts imported.Шаблон:Citation needed

For foreign train-makers, technology transfer is an important part of gaining market access in China. Bombardier, the first foreign train-maker to form a joint venture in China, has been sharing technology for the manufacture of railway passenger cars and rolling stock since 1998. Zhang Jianwei, President and Chief Country Representative of Bombardier China, stated that in a 2009 interview, “Whatever technology Bombardier has, whatever the China market needs, there is no need to ask. Bombardier transfers advanced and mature technology to China, which we do not treat as an experimental market.”[35] Unlike other series which have imported prototypes, all CRH1 trains have been assembled at Bombardier's joint-venture with CSR, Bombardier Sifang in Qingdao.

Kawasaki's cooperation with CSR did not last as long. Within two years of cooperation with Kawasaki to produce 60 CRH2A sets, CSR began in 2008 to build CRH2B, CRH2C and CRH2E models at its Sifang plant independently without assistance from Kawasaki.[36] According to CSR president Zhang Chenghong, CSR "made the bold move of forming a systemic development platform for high-speed locomotives and further upgrading its design and manufacturing technology. Later, we began to independently develop high-speed CRH trains with a maximum velocity of 300–350 kilometers per hour, which eventually rolled off the production line in December 2007."[37] Since then, CSR has ended its cooperation with Kawasaki.[38] Kawasaki challenged China's high-speed rail project for patent theft, but backed off the effort.[39]

Between June and September 2005, the MOR launched bidding for high-speed trains with a top speed of Шаблон:Convert, as most of the main high-speed rail lines were designed for top speeds of Шаблон:Convert or higher. Along with CRH3C, produced by Siemens and CNR Tangshan, CSR Sifang bid 60 sets of CRH2C.

In 2007, travel time from Beijing to Shanghai was about 10 hours at a top speed of Шаблон:Convert on the upgraded Beijing–Shanghai Railway. To increase transport capacity, the MOR ordered 70 16-car trainsets from CSR Sifang and BST, including 10 sets of CRH1B and 20 sets of CRH2B seating trains, 20 sets of CRH1E and 20 sets of CRH2E sleeper trains.

Construction of the high-speed railway between Beijing and Shanghai, the world's first high-speed rail with a designed speed of Шаблон:Convert, began on April 18, 2008. In the same year, the Ministry of Science and the MOR agreed to a joint action plan for the indigenous innovation of high-speed trains in China. The MOR then launched the CRH1-350 (Bombardier and BST, designated as CRH380D), CRH2-350 (CSR, designated as CRH380A/AL), and CRH3-350 (CNR and Siemens, designated as CRH380B/BL & CRH380CL), to develop a new generation of CRH trains with a top operation speed of Шаблон:Convert. A total of 400 new generation trains were ordered. The CRH380A/AL, the first indigenous high-speed train of the CRH series, entered service on the Shanghai-Hangzhou High-Speed Railway on October 26, 2010.[40]

On October 19, 2010, the MOR announced the beginning of research and development of "super-speed" railway technology, which would increase the maximum speed of trains to over Шаблон:Convert.[41]

Early passenger-dedicated high-speed rail lines

After committing to conventional-track high-speed rail in 2006, the state embarked on an ambitious campaign to build passenger-dedicated high-speed rail lines, which accounted for a large part of the government's growing budget for rail construction. Total investment in new rail lines grew from $14 billion in 2004 to $22.7 and $26.2 billion in 2006 and 2007.[42] In response to the global economic recession, the government accelerated the pace of HSR expansion to stimulate economic growth. Total investments in new rail lines including HSR reached $49.4 billion in 2008 and $88 billion in 2009.[42] In all, the state planned to spend $300 billion to build a Шаблон:Convert HSR network by 2020.[43][44] Шаблон:Multiple image As of 2007, the Qinhuangdao-Shenyang high-speed railway, which carried trains at top speed of Шаблон:Convert along the Liaoxi Corridor in the Northeast, was the only passenger-dedicated HSR line (PDL) in China, but that would soon change as the country embarked on a high-speed railway construction boom.

National high-speed rail grid (4+4)

Шаблон:See also Higher-speed express train service allowed more trains to share the tracks and improved rail transport capacity. But high-speed trains often have to share tracks with slower, heavy freight trains – in some cases with as little as 5 minutes headway.[21] To attain higher speeds and transport capacity, planners began to propose a passenger-dedicated HSR network on a grand scale. Initiated by MOR's 2004 "Mid-to-Long Term Railway Network Plan", a national grid composed of eight high-speed rail corridors, four running north–south and four going east–west, was to be constructed.[45] The envisioned network, together with upgraded existing lines, would total Шаблон:Convert in length. Most of the new lines follow the routes of existing trunk lines and are designated for passenger travel only. They became known as passenger-designated lines (PDLs). Several sections of the national grid, especially along the southeast coastal corridor, were built to link cities that had no previous rail connections. Those sections will carry a mix of passenger and freight. High-speed trains on PDLs can generally reach Шаблон:Convert. On mixed-use HSR lines, passenger train service can attain peak speeds of Шаблон:Convert. The earliest PDLs built were sections of the corridors that connected large cities in the same region. On April 19, 2008, Hefei–Nanjing PDL in the East opened with a top-speed of Шаблон:Convert. On August 1, 2008, the Beijing–Tianjin intercity railway opened in time for the 2008 Summer Olympics. This line between northern China's two largest cities, was the first in the country to accommodate commercial trains with top speed of Шаблон:Convert and featured the CRH2C and CRH3C train sets. This ambitious national grid project was planned to be built by 2020, but the government's stimulus has expedited time-tables considerably for many of the lines.

The Wuhan–Guangzhou high-speed railway (Wuguang PDL), which opened on December 26, 2009, was the country's first cross-regional high-speed rail line. With a total length of Шаблон:Convert and capacity to accommodate trains traveling at Шаблон:Convert, the Wuguang PDL set a world record for the fastest commercial train service with average trip speed of Шаблон:Convert. Train travel between central and southern China’s largest cities, Wuhan and Guangzhou, was reduced to just over three hours. On October 26, 2010, China opened its 15th high-speed rail, the Shanghai–Hangzhou line, and unveiled the CRH380A trainset manufactured by CSR Sifang started regular service. The Beijing–Shanghai high-speed railway, the second major cross-regional line, opened in June 2011 and was the first line designed with a top speed of Шаблон:Convert in commercial service.[46][47]

By January 2011, China had the world's longest high-speed rail network with about Шаблон:Convert[48] of routes capable for at least Шаблон:Convert running in service including Шаблон:Convert of rail lines with top speeds of Шаблон:Convert.Шаблон:Dead link[49] The MOR reportedly committed investment of ¥709.1 billion (US$107.9 billion) in railway construction in 2010 and would invest ¥700 billion (US$106 billion) in 2011 on 70 railway projects, including 15 high-speed rail projects. Some Шаблон:Convert of new high-speed railways would be opened, and by the end of 2011, China would have Шаблон:Convert of railways capable of carrying trains at speeds of at least Шаблон:Convert.[50]

Corruption and concerns

Файл:Beijing-Tianjin High Speed Train.jpg
Former Railway Minister Liu Zhijun hosting Nancy Pelosi and Edward Markey, members of the United States Congress, in Beijing in 2009.

In February 2011, Railway Minister Liu Zhijun, a key proponent of HSR expansion in China, was removed from office on charges of corruption. The Economist estimates Liu accepted ¥1 billion of bribes ($152 million) in connection with railway construction projects.[51] Investigators found evidence that another ¥187 million ($28.5 million) was misappropriated from the $33 billion Beijing–Shanghai high-speed railway in 2010.[52] Another top official in the Railways Ministry, Zhang Shuguang, was also sacked for corruption.[51] Zhang was estimated to have misappropriated to his personal overseas accounts the equivalent of $2.8 billion.[53]

After the political shake-up, concerns about HSR safety, high ticket prices, financial sustainability and environmental impact received greater scrutiny in the Chinese press.[54][55]

In April 2011, the new Minister of Railways Sheng Guangzu said that due to corruption, safety may have been compromised on some construction projects and completion dates may have to be pushed back.[51] Sheng announced that all trains in the high-speed rail network would operate at a maximum speed of Шаблон:Convert beginning on July 1, 2011.[54][56][57] This was in response to concerns over safety, low ridership due to high ticket prices,[58] and high energy usage.[55] On June 13, 2011, the MOR clarified in a press conference that the speed reduction was not due to safety concerns but to offer more affordable tickets for trains at Шаблон:Convert and increase ridership. Higher-speed train travel uses greater energy and imposes more wear on expensive machinery. Railway officials lowered the top speed of trains on most lines that were running at Шаблон:Convert to Шаблон:Convert. Trains on the Beijing-Tianjin high-speed line and a few other inter-city lines remained at Шаблон:Convert.[59] In May 2011, China's Environmental Protection Ministry ordered the halting of construction and operation of two high-speed lines that failed to pass environmental impact tests.[60][61] In June, the MOR maintained that high-speed rail construction was not slowing down.[62] The CRH380A trainsets on the Beijing–Shanghai high-speed railway could reach a top operational speed of Шаблон:Convert but were limited to Шаблон:Convert.[46][63] Under political and public pressure, the National Audit Office (NAO) carried out an extensive investigation into the building quality of all high-speed rail lines. As of March 2011, no major quality defects had been found in the system.[64] Foreign manufacturers involved in Shanghai-Beijing high-speed link reported that their contracts call for maximum operational speed of Шаблон:Convert.[65] From July 20, 2011, the frequency of train service from Jinan to Beijing and Tianjin was reduced due to low occupancy, which renewed concerns about demand and profitability for high-speed services. Service failures in the first month of operation drove passengers back to pre-existing slower rail service and air travel; airline ticket prices rebounded due to reduced competition.[66]

Wenzhou accident

Шаблон:Main

Файл:Speed of Shanghai to Hangzhou high speed CRH train.JPG
Maximum speed of CRH380A train on Shanghai–Hangzhou high-speed railway before the Wenzhou accident was around 350km/h. Since 2017, with the introduction of the Fuxing series of trains, this line has resumed 350km/h operations.

On July 23, 2011, two high-speed trains collided on the Ningbo–Taizhou–Wenzhou railway in Lucheng District of Wenzhou, Zhejiang Province.[67][68][69] The accident occurred when one train traveling near Wenzhou was struck by lightning, lost power and stalled. Signals malfunctioned, causing another train to rear-end the stalled train.[68][70][71][72][73] Several carriages derailed.[74] State-run Chinese media confirmed 40 deaths, and at least 192 people hospitalised, including 12 who were severely injured.[75][76][77] The Wenzhou train accident and the lack of accountability by railway officials caused a public uproar and heightened concerns about the safety and management of China's high-speed rail system.[78][79] Quality and safety concerns also affected plans to export cheaper high-speed train technology to other countries.[80]

The train collision exposed poor management by the railway company.[81][82] This fatal accident, which happened in the midst of corruption investigations into railway officials, led to greater scrutiny in the Chinese press and the populace concerning the HSR[54][55][81][82] and on the railway company.[54][55]

Following the deadly crash, the Chinese government suspended new railway project approvals and launched safety checks on existing equipment.[83][84] A commission was formed to investigate the accident with a directive to report its findings in September 2011.[85] On August 10, 2011, the Chinese government announced that it was suspending approvals of any new high-speed rail lines pending the outcome of the investigation.[86][87] The Minister of Railways announced further cuts in the speed of Chinese high-speed trains, with the speed of the second-tier 'D' trains reduced from Шаблон:Convert to Шаблон:Convert, and Шаблон:Convert to Шаблон:Convert on upgraded pre-existing lines.[88] The speed of the remaining Шаблон:Convert trains between Shanghai and Hangzhou was reduced to Шаблон:Convert as of August 28, 2011.[89] To stimulate ridership, on August 16, 2011, ticket prices on high-speed trains were reduced by five percent.[90] From July to September, high-speed rail ridership in China fell by nearly 151 million trips to 30 million trips.[91]

Slowdown in financing and construction

Файл:CRH380BJ-A-0504@BCR (20160420125518).jpg
A comprehensive inspection train (CRH380B) designed for performance under high altitude and low temperature conditions in Northeast China.

In the first half of 2011, the MOR as a whole made a profit of ¥4.29 billion and carried a total debt burden of ¥2.09 trillion, equal to about 5% of China's GDP.[92][93] Earnings from the more profitable freight lines helped to off-set losses by high-speed rail lines.Шаблон:Citation needed As of years ending 2008, 2009 and 2010, the MOR's debt-to-asset ratio was respectively, 46.81%, 53.06% and 57.44%,[94] and reached 58.58% by mid-year 2011.[95] As of October 12, 2011, the MOR had issued ¥160 billion of debt for the year.[93] But in the late summer, state banks began to cut back on lending to rail construction projects, which reduced funding for existing railway projects. An investigation of 23 railway construction companies in August 2011 revealed that 70% of existing projects had been slowed or halted mainly due to shortage of funding.[95] Affected lines included Xiamen-Shenzhen, Nanning-Guangzhou, Guiyang-Guangzhou, Shijiazhuang-Wuhan, Tianjin-Baoding and Shanghai-Kunming high-speed rail lines.[91][92] By October, work had halted on the construction of Шаблон:Convert of track.[91] New projects were put on hold and completion dates for existing projects, including the Tianjin-Baoding, Harbin-Jiamusi, Zhengzhou-Xuzhou and Hainan Ring (West), were pushed back.[95] As of October 2011, the MOR was reportedly concentrating remaining resources on fewer high-speed rail lines and shifting emphasis to more economically viable coal transporting heavy rail.[93]

To ease the credit shortage facing rail construction, the Ministry of Finance announced tax cuts to interest earned on rail construction financing bonds and the State Council ordered state banks to renew lending to rail projects.[91] In late October and November 2011, the MOR raised RMB 250 billion in fresh financing and construction resumed on several lines including the Tianjin-Baoding, Xiamen-Shenzhen and Shanghai-Kunming.[96]

Recovery

Файл:Train line at Xingping Reservoir.JPG
The Guiyang–Guangzhou High-Speed Railway under construction in Yangshuo, Guangxi in August 2013. This line traverses 270 caves and 510 valleys in the karst landscape of southwest China.[97] Bridges and tunnels comprise 83% of this line's total length of 857 km, including 92% in Guizhou Province.[97] Travel time by train between Guizhou and Guangzhou was reduced from 20 hours to 4 hours.[98]

By early 2012, the Chinese government renewed investments in high-speed rail to rejuvenate the slowing economy.[99] Premier Wen Jiabao visited train manufacturers and gave a vote of confidence in the industry.[99] Over the course of the year, the MOR's budget rose from $64.3 billion to $96.5 billion.[99] Five new lines totaling Шаблон:Convert in length entered operation between June 30 and December 31, including the Beijing-Wuhan section of the Beijing-Guangzhou line.[100] By the end of 2012, the total length of high-speed rail tracks had reached Шаблон:Convert, and ridership rebounded and exceeded levels prior to the Wenzhou crash.[101][102] China's 1,580 high-speed trains were transporting 1.33 million passengers daily, about 25.7% of the overall passenger traffic.[100] The Beijing–Tianjin, Shanghai–Nanjing, Beijing–Shanghai and Shanghai–Hangzhou lines reported breaking even financially[103][104][105][106] The Shanghai-Nanjing line even reported to be operationally profitable,[105] operating with a 380 million yuan net profit.[104][105] However, in 2013, only few lines had yet become profitable.[106]

On December 28, 2013, the total length of high-speed rail tracks nationally topped Шаблон:Convert with the opening of the Xiamen–Shenzhen, Xian–Baoji, Chongqing−Lichuan high-speed railways as well as intercity lines in Hubei and Guangxi.[107]

Second boom

Файл:Century Kiss of CR400 series (20170225103539).jpg
Double heading of CR400AF and CR400BF, two China Standardized EMU models built by different manufacturers, at Beijing West railway station in February 2017

In 2014, high-speed rail expansion gained speed with the opening of the Taiyuan–Xi'an, Hangzhou–Changsha, Lanzhou-Ürümqi, Guiyang-Guangzhou, Nanning-Guangzhou trunk lines and intercity lines around Wuhan, Chengdu,[108] Qingdao[109] and Zhengzhou.[109] High-speed passenger rail service expanded to 28 provinces and regions.[110] The number of high-speed train sets in operation grew from 1,277 pairs in June to 1,556.5 pairs in December.[110][111]

In response to a slowing economy, central planners approved a slew of new lines including Shangqiu-Hefei-Hangzhou,[112] Zhengzhou-Wanzhou,[113] Lianyungang-Zhenjiang,[114] Linyi-Qufu,[115] Harbin-Mudanjiang,[116] Yinchuan-Xi'an,[112] Datong-Zhangjiakou,[112] and intercity lines in Zhejiang[117] and Jiangxi.[112]

The government actively promoted the export of high-speed rail technology to countries including Mexico, Thailand, the United Kingdom, India, Russia and Turkey. To better compete with foreign trainmakers, the central authorities arranged for the merger of the country's two main high-speed train-makers, CSR and CNR, into CRRC.[118]

By 2015, six high speed rail lines, Beijing–Tianjin, Shanghai–Nanjing, Beijing–Shanghai, Shanghai–Hangzhou, Nanjing–Hangzhou and Guangzhou–Shenzhen–Hong Kong report operational profitability.[119] The Beijing–Shanghai is particularly profitable reporting a 6.6 billion yuan net profit.[120]

In 2016, with the near completion of the National 4+4 grid, a new "Mid-to-Long Term Railway Network" Plan was drafted. The plan envisions a larger 8+8 high speed rail grid serving the nation and expanded intercity lines for regional and commuter services for large metropolitan areas of China.[121] The proposed completion date for the network is 2030.[122]

Since 2017, with the introduction of the Fuxing series of trains, a number of lines have resumed 350 km/h operations such as Beijing–Shanghai HSR, Beijing–Tianjin ICR, and Chengdu–Chongqing ICR.[123]

The HSR network reached Шаблон:Convert in total length by the end of 2020.[124] In 2025, the HSR network will reach a total length of 50.000 km and will grow further.[125]

Шаблон:Multiple image

Шаблон:Historical populations

Development and social impact

China's high-speed rail expansion is entirely managed, planned and financed by the Chinese government.

Файл:京津城际铁路-天津北站.jpg
Over 85% of track on the Beijing–Tianjin intercity railway is laid on viaducts. Chinese builders use elevated lines to keep high-speed rail tracks straight and level over uneven terrain, and to save on land acquisition costs.

Public concern

On one hand, the demand of high-speed rail in China steadily increases over time. In 2012, the average occupancy rate of high-speed rails in China was 57%. This percentage increased to 65%, 69% and 72% in the year of 2013, 2014 and 2015, respectively. As of February 2016, high-speed rails covered nearly Шаблон:Cvt.[126] On the other hand, however, public concerns about the high-speed rail development have been raised from various perspectives.[127]

The safety issue that drew the attention of the public and the government was the Wenzhou train collision which happened on July 23, 2011, in which 40 people died, 172 were injured, and 54 related officials blamed and punished.[128]

However overall, Chinese high speed rail has an exemplary safety record[129]Шаблон:Rp and according to The New York Times, the Chinese high-speed rail network is "one of the world’s safest transportation systems."[130] As of at least 2024, the Wenzhou crash remains the only serious accident in the massive Chinese HSR network.[129]Шаблон:Rp

Construction costs

According to a 2019 World Bank report, China was able to have construction costs of its high speed rail to be at an average of $17 million to 21 million dollars per km, which is lower than other countries by a third. Standardization of the designs and procedures, were cited as the key reason for keeping costs down.[131][132][133]

Economic efficiency

Experts expressed concern of the network's operational efficiency.[134][135] In 2016, Chinese railways carried almost 2 trillion ton-kilometers of freight and over 1 billion passenger-kilometer of passengers, making it one of the world's most intensively used freight and passenger railway networks in the world.[136] However, the rail staff productivity upon railway track infrastructure index in China is less than 0.05, being the lowest among the countries with significant railway construction.[134] The government also articulated the importance and urgency of assuring the capacity of railway staff, especially their familiarity with telecommunication and signaling testing in the official investigation of the Wenzhou train collision.[137] In addition, it is hard to identify problems in the construction process, given the distribution resource planning system needed for rapid railway building and assembling. Suppliers and manufacturers blame each other for any problem detected in the trial operation, while tracking the construction process to every single detail is an almost impossible job for inspectors.[127]

Файл:Hada high-speed railway under const.JPG
A prefabricated section of the elevated track being installed on the Harbin–Dalian High Speed Railway in October 2010

Policy justifications

Critics both in China and abroad have questioned the necessity of having an expensive high-speed rail system in a largely developing country, where most workers cannot afford to pay a premium for faster travel.[43][44] The government has justified the expensive undertaking as promoting a number of policy objectives. HSR provides fast, reliable and comfortable means of transporting large numbers of travelers in a densely populated country over long distances,[138][139] which:

  • Improves economic productivity and competitiveness over the long term by increasing the transport capacity of railways and linking labor markets.[44][140] Dedicating passenger transport to high-speed lines frees up older conventional railways to freights, which can now carry more payload at lower speed and is more profitable for railway companies than passengers, whose fares are subsidized.[138]
  • Stimulates the economy in the short term as HSR construction creates jobs and drives up demand for construction, steel and cement industries during the economic downturn. Work on the Beijing–Shanghai HSR mobilized 110,000 workers.[42][140][141]
  • Facilitates cross-city economic integration and promotes the growth of second-tier cities.[142] The introduction of the high-speed railways is responsible for 59% of the increase in market potential for the secondary cities connected by bullet trains. (Market potential, a concept used by economic geographers, measures "a geographic area's access to markets for inputs and outputs.") A 10% increase in a secondary city's market potential is expected to be associated with a 4.5% increase in its average real estate price.[143]
  • Supports energy independence and environmental sustainability. Electric trains use less energy to transport people and goods on a per unit basis and can draw power from more diverse sources of energy including renewables than automobile and aircraft, which are more reliant on imported petroleum.[138]
  • Develop an indigenous high-speed rail equipment industry. The expansion into HSR is also developing China into a leading source of high-speed rail building technology.[42] Chinese train-makers have absorbed imported technologies quickly, localized production processes, and even begun to compete with foreign suppliers in the export market. Six years after receiving Kawasaki's license to produce Shinkansen E2, CSC Sifang can produce the CRH2A without Japanese input, and Kawasaki has ended cooperation with Sifang on high-speed rail.[144]

Profitability and debt

Файл:Traffic density and market share on major corridors, 2001–13.jpg
Traffic density and market share of conventional and high-speed rail on major corridors from 2001 to 2013

One major concern of the high-speed rail network is the high amount of debt incurred. As of 2022, the China State Railway Group has had a debt of around US$900 billion, according to Nikkei.[9] Conservative scholars and officials are worried that the indebted high-speed rail is further exacerbated by its unprofitability, operating at a daily loss of US$24 million as of November 2021. While a number of high-speed railways in eastern China have started to be operationally profitable since 2015, the high speed railways in the midwest still operate at a loss. Zhengzhou–Xi'an high-speed railway is estimated to run 59 trains in 2010 and 125 trains in 2018, yet in 2016 there are merely around 30 trains on operation, causing a 1.4 billion loss. The Guiyang–Guangzhou high-speed railway and Lanzhou–Xinjiang high-speed railway (where fares do not cover electricity costs) are both suffering from high maintenance cost due to harsh climate conditions and complicated terrain structure.[145] The Beijing-Shanghai high-speed railway is one of the few lines that have been profitable, with profits steadily increasing after first breaking even in 2014, and achieving revenue of CNY 29.6 billion and net profit of CNY 12.7 billion in 2017.Шаблон:Citation needed In an analysis conducted in 2019, only five out of fifteen high speed railway lines with travel speeds reaching 350 kilometers per hour, were able to cover all costs that included both the operating and capital costs.Шаблон:Citation needed

Construction financing

China's high-speed rail construction projects are highly capital intensive. About 40–50% of financing is provided by the national government through lending by state owned banks and financial institutions, another 40% by the bonds issued by the Ministry of Railway (MOR) and the remaining 10–20% by provincial and local governments.[95][138] The MOR, through its financing arm, the China Rail Investment Corp (CRIC), issued an estimated ¥1 trillion (US$150 billion in 2010 dollars) in debt to finance HSR construction from 2006 to 2010,[146] including ¥310 billion in the first 10 months of 2010.[147] CRIC has also raised some capital through equity offerings; in the spring of 2010, CRIC sold a 4.5 percent stake in the Beijing–Shanghai high-speed railway to the Bank of China for ¥6.6 billion and a 4.5 percent stake to the public for ¥6 billion.[146] CRIC retained 56.2 percent ownership on that line. As of 2010, the CRIC-bonds are considered to be relatively safe investments because they are backed by assets (the railways) and implicitly by the government.

Файл:Crossing Shape-Shangrao Railway Station.JPG
Shangrao railway station with a 380BL train serving the Hefei–Fuzhou HSR on the upper platforms and a 380A train serving the Hangzhou–Changsha HSR in the lower platform.
Файл:Shenzhen section of GSGXRL.jpg
Workers on the Shenzhen section of Guangzhou–Shenzhen–Hong Kong high-speed railway in May 2011

Large construction debt-loads require significant revenues from rider fares, subsidies, and/or other sources of income, such as advertising, to repay. Despite impressive ridership figures, virtually every completed line has incurred losses in its first years of operation. For example, the Beijing–Tianjin intercity railway in its two full years of operation, delivered over 41 million rides. The line cost ¥20.42 billion to build, and ¥1.8 billion per annum to operate, including ¥0.6 billion in interest payments on its ¥10 billion of loan obligations.[166] The terms of the loans range from 5–10 years at interest rates of 6.3 to 6.8 percent.[166] In its first year of operation from August 1, 2008, to July 31, 2009, the line carried 18.7 million riders and generated ¥1.1 billion in revenues, which resulted in a loss of ¥0.7 billion. In the second year, ridership rose to 22.3 million and revenues improved to ¥1.4 billion, which narrowed losses somewhat to below ¥0.5 billion.[166] To break even, the line must deliver 30 million rides annually.[166] To be able to repay principal, ridership would need to exceed 40 million.[166] In September 2010, daily ridership averaged 69,000 or an annual rate of 25.2 million.[166] In 2013, ridership totaled 25.85 million.[167] The line has a capacity of delivering 100 million rides annually[168] and initial estimated repayment period of 16 years.[166] In 2012, the Beijing–Tianjin Intercity Railway reported that it had broken even, and by 2015 was operating at a profit.[169][170]

The Shijiazhuang-Taiyuan PDL lost ¥0.8 billion in its first year and is set to lose ¥0.9 billion in 2010.[146] The Southeast HSR corridor lost ¥0.377 billion in its first year beginning August 2009.[146] The Zhengzhou-Xian HSR since opening in February 2010 was expected to generate revenues of ¥0.6 billion in its first full year but must make interest payments of ¥1.1 billion. In the first three quarters of 2012, the line lost ¥1.87 billion.[171] The losses must be covered by the operator, which is usually subsidized by local governments.[168] In December 2014, the Henan provincial government imposed a rule requiring municipal authorities pay 70% of the deficit incurred by Henan's intercity lines with the provincial authorities paying the remainder 30%.[172]

The MOR faces a debt-repayment peak in 2014.[146] Some economists recommend further subsidies to lower fares and boost ridership and ultimately revenues.[168] Others warn that the financing side of the existing construction and operation model is unsustainable.[168] If the rail-backed loans cannot be fully repaid, they may be refinanced or the banks may seize ownership of the railways.[146] To prevent that eventuality, the MOR is trying to improve management of its rapidly growing HSR holdings.[146]

Overall, ridership is growing as the high-speed rail network continues to expand. High-speed rail is also becoming relatively more affordable as fares have remained stable while worker wages have grown sharply over the same period.[173] In 2016, the high-speed rail revenue was 140.9 billion RMB Yuan (US$20 billion), while the same term interest from at least 3300 billion debt of its construction was 156.8 billion RMB Yuan (US$22.4 billion).[174] According to the World Bank, a stable long term planning and standardization of technology and design used in the high-speed rail helps to reduce financial and operational cost. Standardization of designs and procedures such as train tracks, rolling stocks, signal systems keeps the construction cost down. Moreover, State-owned corporation also uses bulk purchasing to reduce material prices.[175]

Fare cost comparisons

Файл:China Railways CRH5 EMU used in Changchun–Jilin Intercity Railway..jpg
The CRH5 intercity train on the Changchun–Jilin Intercity railway.

In 2013 fares for China's high-speed rail service costs significantly less than similar systems in other developed countries, for comparison high speed rail tickets in France or Germany cost slightly over US$0.10 per kilometer and the various Shinkansen services hover above US$0.20 per kilometer.Шаблон:Citation needed A 2019 study by the World Bank Group, had found that the HSR fares in China are low when compared to other countries and have attracted passengers from all income levels. They noted that HSR is "very competitive" with bus and aircraft transport for distances between 150 km and 800 km (about 3 to 4 hours travel time). Additionally due to the frequency and its high speeds, HSR services that travel at 350kph, still remains competitive with other modes of transport, for distances of up to 1,200 km.[44][176]

Trip Distance Price Price US$/km Time
HSR trip from Beijing to Jinan Шаблон:Convert CNY185 (US$30) 0.07 1 hour 22 minutes
HSR trip from Paris to Lyon Шаблон:Convert CNY240 (US$39) 0.10 2 hours
HSR trip from Madrid to Valencia, Spain Шаблон:Convert €33–58 (US$41–72) 0.11–0.18 1 hour 40 minutes
HSR train from Tokyo to Gifu-Hashima Шаблон:Convert CNY270 (US$43) 0.11 1 hour 56 minutes

Impact on airlines

The spread of high-speed rail has forced domestic airlines in China to slash airfare and cancel regional flights.[177] The impact of high-speed rail on air travel is most acute for intercity trips under Шаблон:Convert.[177] By the spring of 2011, commercial airline service had been completely halted on previously popular routes such as Wuhan–Nanjing, Wuhan–Nanchang, Xi’an–Zhengzhou and Chengdu–Chongqing.[177] Flights on routes over Шаблон:Convert are generally unaffected.[177] As of October 2013, high-speed rail was carrying twice as many passengers each month as the country's airlines.[173]

Track network

Шаблон:Wide image Шаблон:Main

Файл:China high-speed rail network.png
Map showing projected high-speed rail network in China by 2020 and the travel time by rail from Beijing to each of the provincial capitals.

China's high-speed railway network is by far the longest in the world. The HSR network reached Шаблон:Convert in total length by end of 2023 with plans to reach Шаблон:Convert in 2035.[178] HSR lines with design speeds at Шаблон:Convert are more common than higher speed lines. According to a World Bank publication on Chinese HSR, by the end of 2017 "the length of 300–350 kph lines was about 10,000 km, and the length of 200–250 kph lines was about 15,000 km."[4]

Newer HSR lines are one of three types:

  1. passenger dedicated lines (PDLs) with a design speed of Шаблон:Convert,
  2. regional lines connecting major cities with a design speed of Шаблон:Convert, and
  3. certain regional "intercity" HSR lines with a design speed of Шаблон:Convert.

Lastly, the HSR network includes rail lines that had been newly constructed during a previous stage of the high speed rail build up, carrying high-speed passenger and express freight trains with a design speed of Шаблон:Convert.[4]

National High-Speed Rail Grid

Файл:Chine Railway High Speed.png
Map of "Eight Vertical and Eight Horizontal" high-speed railway network plan (in English)
Файл:JingjiuShanghang.jpg
The Shangqiu-Hangzhou HSR, part of the Harbin-Hong Kong (Macau) corridor, under construction in Shangqiu, Henan Province, in February 2017. The elevated HSR runs next to the conventional speed Beijing–Kowloon Railway.

The centerpiece of China's expansion into high-speed rail is a national high-speed rail grid consisting of mainly passenger dedicated lines that is overlaid onto the existing railway network.

4+4 HSR Grid

The grid is composed of eight high-speed rail corridors, four running north–south and four east–west, and has a total of Шаблон:Cvt.[45] Most of the lines follow the routes of existing trunk lines and are designated for passenger traffic only. They are known as passenger-designated lines (PDL). Several sections of the national grid, especially along the southeast coastal corridor, were built to link cities that had no previous rail connections. Those sections will carry a mix of passenger and freight. High-speed trains on HSR Corridors can generally reach Шаблон:Convert. On mixed-use HSR lines, passenger train service can attain peak speeds of Шаблон:Convert. This ambitious national grid project was planned to be built by 2020, but the government's stimulus has expedited time-tables considerably for many of the lines.

8+8 HSR Grid

The 4+4 national HSR grid was largely completed by the end of 2015 and now serves as the backbone of China's HSR network. In July 2016, the state planners reorganized the national HSR networkШаблон:Sndincluding HSR lines in operation, under construction and under planningШаблон:Sndinto eight vertical and eight horizontal high speed rail corridors, almost doubling the network.Шаблон:Sfn[179]

Шаблон:Div col Eight VerticalsШаблон:Sfn

  1. Coastal corridor
  2. Beijing–Shanghai corridor
  3. Beijing–Hong Kong (Taipei) corridor
  4. Harbin–Hong Kong (Macau) corridor
  5. Hohhot–Nanning corridor
  6. Beijing–Kunming corridor
  7. Baotou (Yinchuan)–Hainan corridor
  8. Lanzhou (Xining)–Guangzhou corridor

Eight HorizontalsШаблон:Sfn

  1. Suifenhe–Manzhouli corridor
  2. Beijing–Lanzhou corridor
  3. Qingdao–Yinchuan corridor
  4. Eurasia Continental Bridge corridor
  5. Yangtze River corridor
  6. Shanghai–Kunming corridor
  7. Xiamen–Chongqing corridor
  8. Guangzhou–Kunming corridor

Шаблон:Div col end

Regional High-Speed Rail

According to the "Mid-to-Long Term Railway Network Plan" (revised in 2008), the MOR plans to build over Шаблон:Convert of railway in order to expand the railway network in western China and to fill gaps in the networks of eastern and central China. Some of these new railways are being built to accommodate speeds of Шаблон:Convert for both passengers and freight. These are also considered high-speed rail though they are not part of the national HSR grid or Intercity High Speed Rail. Several HSR lines planned and built as a regional high-speed railway under the 2008 Revisions have since been incorporated into the 8+8 national grid.

High-speed intercity railways

Intercity railways are designed to provide regional high-speed rail service between large cities and metropolitan areas that are generally within the same province. They are built with the approval of the central government but are financed and operated largely by local governments with limited investment and oversight from the China Rail Corporation. Some intercity lines run parallel to other high-speed rail lines but serve more stations along the route. Intercity HSR service speeds range from Шаблон:Convert.

Passenger-freight railways and connecting conventional lines

The HSR network includes new mixed passenger-freight lines with a design speed of Шаблон:Convert. Some high speed trains also continue on or run over connecting segments of upgraded conventional lines. Trains can operate at Шаблон:Convert on many of the conventional main lines.[4]

Service

Файл:RID clearing CRH gate.jpg
Passenger tapping China Resident ID Card to board a high-speed train on China Railway High-speed.

Rail operators

Шаблон:Main Шаблон:See also China Railway High-speed (CRH) is the major high-speed rail service provided by state-owned railway manufacturing and construction corporation China Railway. The CRH's high-speed trains are called Harmony and Rejuvenation. In October 2010, CRH service more than 1,000 trains per day, with a daily ridership of about 925,000.[180]

Almost all HSR trains, tracks, and services are owned and operated by the China Railway Corporation under the brand China Railway High-speed (CRH) with two exceptions being the Shanghai Maglev Train, which is operated by the Shentong Metro Group, and Guangzhou–Shenzhen–Hong Kong Express Rail Link (XRL), which is partially operated by the Hong Kong-based MTR Corporation. Although both classified as high-speed rail, the Shanghai Maglev often is not counted as part of the national high-speed rail network, while XRL is fully integrated into the national network of the CRH.

China has the world's only commercial maglev high-speed train line in operation. The Shanghai Maglev Train, a turnkey Transrapid maglev demonstration line Шаблон:Cvt long. The trains have a top operational speed of Шаблон:Convert and can reach a top non-commercial speed of Шаблон:Convert. It opened for operations in March 2004, and transports passengers between Shanghai's Longyang Road station and Shanghai Pudong International Airport. There have been numerous attempts to extend the line without success. A Shanghai-Hangzhou maglev line was also initially discussed but later shelved in favour of conventional high-speed rail.[181]

Two other Maglev lines, the Changsha Maglev and the Line S1 of Beijing, were designed for commercial operations with speeds lower than Шаблон:Convert.[182] The Fenghuang Maglev[183] opened in 2022 while the Qingyuan Maglev is under construction.[184]

Ridership

Шаблон:Main Шаблон:Historical populations

China Railway reports the number of passengers carried by high-speed EMU train sets and this figure is frequently reported as high-speed ridership, even though this figure includes passengers from EMU trains providing sub-high speed service.[185] In 2007, CRH EMU trains running on conventional track upgraded in the sixth round of the "Speed-up Campaign" carried 61 million passengers, before the country's first high-speed rail line, the Beijing–Tianjin intercity railway, opened in August 2008.

In 2018, China Railway operated 3,970.5 pairs of passenger train service, of which 2,775 pairs were carried by EMU train sets.[185] Of the 3.313 billion passenger-trips delivered by China Railway in 2018, EMU train sets carried 2.001 billion passenger-trips.[185] This EMU passenger figure includes ridership from certain D- and C-class trains that are technically not within the definition of high-speed rail in China, as well as ridership from EMU train sets serving routes on conventional track or routes that combine high-speed track and conventional track.[185] Nevertheless, by any measure, high-speed rail ridership in China has grown rapidly with expansion of the high-speed rail network and EMU service since 2008.

China is the third country, after Japan and France, to have one billion cumulative HSR passengers. In 2018, annual ridership on EMU train sets, which encompasses officially defined high-speed rail service as well as certain sub-high-speed service routes, accounted for about two-thirds of all regional rail trips (not including urban trains) in China.[185] At the end of 2018, cumulative passengers delivered by EMU trains is reported to be over 9 billion.[185]


Technology

Rolling stock

Шаблон:Main

Файл:CRH380BL Business Coach SW622203 20121114.JPG
Business class compartment inside a CRH380BL train.
Файл:CRH1-Dining Car.jpg
Buffet car inside CRH1 train.
Файл:CRH2E-2464 at Beijing South Railway Station.jpg
CRH2-E Duplex double deck high speed sleeper train.

China Railway High-speed runs different electric multiple unit trainsets, the name Hexie Hao (Шаблон:Zh) is for designs which are imported from other nations and designated CRH-1 through CRH-5 and CRH380A(L), CRH380B(L), and CRH380C(L). CRH trainsets are intended to provide fast and convenient travel between cities. Some of the Hexie Hao train sets are manufactured locally through technology transfer, a key requirement for China. The signalling, track and support structures, control software, and station design are developed domestically with foreign elements as well. By 2010, the truck system as a whole is predominantly Chinese.[186] China currently holds many new patents related to the internal components of these trains, re-designed in China to allow the trains to run at higher speeds than the foreign designs allowed. However, these patents are only valid within China, and as such hold no international power. The weakness on intellectual property of Hexie Hao causes obstruction for China to export its high-speed rail related product, which leads to the development of the completely redesigned train franchise called Fuxing Hao (Шаблон:Zh) that based on indigenous technologies.[186][187][188][189]

Maglev

In October 2016 China's CRRC announced that it was beginning research and development on a Шаблон:Convert Maglev train and would build a Шаблон:Cvt test track.[190] In June 2020, a trial run was conducted at Tongji University. A planned launch of the maglev train was set for 2025.[191]

Track technology

Файл:China high speed rail ballastless tracks.JPG
Ballastless tracks in China.
Файл:Dmitry Medvedev in China 15 April 2011-2.jpeg
Russian President Dmitry Medvedev aboard a high-speed train in Hainan in April 2011.

Many of the Passenger Designated Lines use ballastless tracks, which allow for smoother train rides at high speeds and can withstand heavy use without warping. The ballastless track technology, imported from Germany, carries higher upfront costs but can reduce maintenance costs.[192][193]

Typical application of track technology in China high-speed lines

Type Classify Technology line
CRTSIs slab track RTRI, Japan Hada PDL
CRTSIIs slab track Max Bögl, Germany Jingjin ICL
CRTSIIIs slab track CRCC,China Chengguan PDL
CRTSIIb ballastless track Züblin, Germany Zhengxi PDL

Technology export

Chinese train-makers and rail builders have signed agreements to build HSRs in Turkey, Venezuela, Argentina,[194] and Indonesia[195] and are bidding on HSR projects in the United States, Russia, Saudi Arabia, Brazil (São Paulo to Rio de Janeiro) and Myanmar, and other countries.[43] They are competing directly with the established European and Japanese manufacturers, and sometimes partnering with them. In Saudi Arabia's Haramain High Speed Rail Project, Alstom partnered with China Railway Construction Corp. to win the contract to build phase I of the Mecca to Medina HSR line, and Siemens has joined CSR to bid on phase II.[196] China is also competing with Japan, Germany, South Korea, Spain, France and Italy to bid for California's high-speed rail line project, which would connect San Francisco and Los Angeles.[197] In November 2009, the MOR signed preliminary agreements with the state's high-speed rail authority and General Electric (GE) under which China would license technology, provide financing and furnish up to 20 percent of the parts with the remaining sourced from American suppliers, and final assembly of the rolling stock in the United States.[198]

In January 2014, the China Railway Construction Corporation completed a Шаблон:Cvt section of the Ankara-Istanbul high-speed railway between Eskişehir and İnönü in western Turkey.[199]

In 2015, China Railway signed up to design a high-speed railway line between the Russian cities of Moscow and Kazan. Russian state-owned railway corporation JSC Russian Railways cooperated with China Railway Group to plan for a 770-kilometer high-speed rail between the two Russian cities. The estimated total cost of the design contract is 20.8 billion rubles ($383 million) for two years.[200] Once the designs are developed, a separate tender will be held for the construction of the rail link, which Russian Railways expects to cost 1.06 trillion rubles ($19.5 billion).[201]

In October 2023, Indonesia launched the first high-speed railway in Southeast Asia, named Whoosh, connecting Indonesia's capital Jakarta and its economic hub Bandung.[202][203][204] As part of China's Belt and Road Initiative, the project cost $7.3 billion and was primarily funded by Chinese banks. As per the agreement, China Railway provided high-speed rail technologies and operational knowledge to Indonesia while China Railway Construction Corporation (CRCC) completed the line. The line is operated by Kereta Cepat Indonesia China. According to Western analysts, this is the first complete high-speed rail export project offered by China and signifies China's growing geopolitical influence in the region.[205][206][207][208][209] Indonesia and Chinese authorities discussed further plans to extend the railway across the Java island.[210][211]

Records

Файл:Digital readout of maximum speed of Shanghai Maglev, 431km per hr.jpg
The Shanghai Maglev train, with a top speed of Шаблон:Convert, is the fastest train in China. The maglev train has remained confined to its original Шаблон:Convert track as state planners chose high-speed trains that run on conventional tracks for the national HSR network.

Fastest trains in China

Шаблон:Main The "fastest" train commercial service can be defined alternatively by a train's top speed or average trip speed.

Longest service distance

The trains G403/404 and G405/406 for the Шаблон:Rws (Beijingxi) - Шаблон:Rws (Kunmingnan) service (distance Шаблон:Cvt, travel time about 10 1/2 hours), which began service on January 1, 2017, became the longest high-speed rail service in the world.[218] It overtook the G529/530 trains for the Шаблон:Station - Beihai (Шаблон:Ill) service (Шаблон:Cvt, 15 1/2 hours for southbound train, 15 3/4 hours for northbound train), which had set the previous record on July 1, 2016.[219]

See also

Notes

Шаблон:NoteFoot

Further reading

References

Citations

Шаблон:Reflist

Sources

Шаблон:Refbegin

Шаблон:Refend

External links

Шаблон:Commons category-inline

Шаблон:High-speed rail in the People's Republic of China Шаблон:High-speed rail Шаблон:Transport in China Шаблон:Portal bar

  1. Шаблон:Cite web
  2. Шаблон:Cite web
  3. Шаблон:Cite news
  4. 4,0 4,1 4,2 4,3 Шаблон:Cite book
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite news
  8. Шаблон:Cite web
  9. 9,0 9,1 Шаблон:Cite web
  10. Gerald Ollivier, Richard Bullock, Ying Jin and Nanyan Zhou, "High-Speed Railways in China: A Look at Traffic" World Bank China Transport Topics No. 11 December 2014, accessed 2017-07-17
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. See ridership section for further details.
  14. 14,0 14,1 Louise Young. Japan's Total Empire. Berkeley: University of California Press 1998. pp. 246–67.
  15. Шаблон:Cite web
  16. 16,0 16,1 16,2 Шаблон:Cite web
  17. Шаблон:Cite web
  18. By the mid-1990s, average train speed in China was about Шаблон:Convert. (Chinese) "China plans five-year leap forward of railway development " Accessed 2006-09-30
  19. Шаблон:Cite news
  20. Шаблон:Cite web
  21. 21,0 21,1 Шаблон:Cite web
  22. Шаблон:Cite news
  23. Шаблон:Cite news
  24. (Chinese)[1] Accessed 2010-10-13
  25. Шаблон:Cite news
  26. Шаблон:Cite web
  27. Шаблон:Cite web
  28. 28,0 28,1 28,2 28,3 28,4 28,5 Шаблон:Cite news
  29. Шаблон:Cite web
  30. "Violence flares as the Chinese rage at Japan" Guardian 2005-04-17
  31. "High speed Train CRH1 – China" Bombardier Шаблон:Webarchive Accessed 2010-08-14
  32. "Kawasaki Wins High-Speed Train Order for China" 2004–10 Шаблон:Webarchive
  33. "How Japan Profits From China's Plans" Forbes 2009-10-26
  34. Шаблон:Cite web
  35. Шаблон:Cite webШаблон:Dead link
  36. Шаблон:Cite web
  37. Шаблон:Cite web
  38. Шаблон:Cite web
  39. Шаблон:Cite web
  40. Шаблон:Cite news
  41. Шаблон:Cite web
  42. 42,0 42,1 42,2 42,3 Шаблон:Cite news
  43. 43,0 43,1 43,2 "China to Bid on US High-Speed Rail Projects" A.P. March 13, 2010 Шаблон:Webarchive
  44. 44,0 44,1 44,2 44,3 Шаблон:Cite news
  45. 45,0 45,1 Шаблон:Cite web
  46. 46,0 46,1 "China's fastest high speed train 380A rolls off production line" Xinhua Шаблон:Webarchive 2010-05-27
  47. Шаблон:Cite news
  48. Шаблон:Cite web
  49. Шаблон:Cite web
  50. Шаблон:Cite web
  51. 51,0 51,1 51,2 Шаблон:Cite news
  52. Шаблон:Cite web
  53. Шаблон:Cite newsШаблон:Cbignore
  54. 54,0 54,1 54,2 54,3 Шаблон:Cite web
  55. 55,0 55,1 55,2 55,3 "China Puts Brakes on High-Speed Trains" The Wall Street Journal 2011-04-17
  56. "China slows down showcase bullet trains" Bloomberg Businessweek 2011-04-17
  57. Шаблон:Cite news
  58. "The Backlash Is Brewing Against Chinese High-Speed Rail: Here's Why It's In Trouble" Business Insider 2011-04-17
  59. Шаблон:Cite web
  60. Шаблон:Cite web
  61. Шаблон:Cite news
  62. Шаблон:Cite news
  63. Шаблон:Cite news
  64. Шаблон:Cite news
  65. Шаблон:Cite web
  66. Шаблон:Cite web
  67. Шаблон:Cite news
  68. 68,0 68,1 Шаблон:Cite web
  69. Шаблон:Cite news
  70. Шаблон:Cite news
  71. Шаблон:Cite news
  72. Шаблон:Cite web
  73. Шаблон:Cite web
  74. Шаблон:Cite web
  75. Шаблон:Cite news
  76. Шаблон:Cite news
  77. Шаблон:Cite news
  78. Шаблон:Cite news
  79. Шаблон:Cite web
  80. Шаблон:Cite web
  81. 81,0 81,1 Шаблон:Cite news
  82. 82,0 82,1 Шаблон:Cite news
  83. Шаблон:Cite news
  84. Шаблон:Cite news
  85. Шаблон:Cite news
  86. Шаблон:Cite web
  87. Шаблон:Cite news
  88. Шаблон:Cite web
  89. Шаблон:Cite web
  90. Шаблон:Cite web
  91. 91,0 91,1 91,2 91,3 Шаблон:Cite news
  92. 92,0 92,1 Шаблон:Cite news
  93. 93,0 93,1 93,2 Шаблон:Cite web
  94. Шаблон:Cite web
  95. 95,0 95,1 95,2 95,3 Шаблон:Cite news
  96. Шаблон:Cite news
  97. 97,0 97,1 Шаблон:Cite news
  98. Шаблон:Cite news
  99. 99,0 99,1 99,2 Simon Rabinovitch, “China’s high-speed rail gets back on track” ‘’Financial Times’’ 2013-01-16
  100. 100,0 100,1 Шаблон:Cite news
  101. Шаблон:Cite web
  102. Шаблон:Cite news
  103. Шаблон:Cite web
  104. 104,0 104,1 Шаблон:Cite web
  105. 105,0 105,1 105,2 Шаблон:Cite web
  106. 106,0 106,1 Шаблон:Cite web
  107. "China's railways mileage tops 100,000 km" Xinhua 2013-12-28
  108. Шаблон:Cite web
  109. 109,0 109,1 Шаблон:Cite news
  110. 110,0 110,1 Шаблон:Cite news
  111. Шаблон:Cite news
  112. 112,0 112,1 112,2 112,3 Шаблон:Cite news
  113. Шаблон:Cite news
  114. Шаблон:Cite web
  115. Шаблон:Cite news
  116. Шаблон:Cite web
  117. Шаблон:Cite news
  118. "Chinese Trainmakers To Merge And Form Export Powerhouse" AFP 2014-12-03
  119. Шаблон:Cite news
  120. Шаблон:Cite news
  121. Шаблон:Cite news
  122. Шаблон:Cite news
  123. Шаблон:Cite web
  124. Шаблон:Cite web
  125. Шаблон:Cite web
  126. Шаблон:Cite web
  127. 127,0 127,1 Шаблон:Cite journal
  128. Шаблон:Cite news
  129. 129,0 129,1 Шаблон:Cite book
  130. Шаблон:Cite news
  131. Шаблон:Cite web
  132. Шаблон:Cite book
  133. Шаблон:Cite web
  134. 134,0 134,1 Шаблон:Cite journal
  135. Шаблон:Cite journal
  136. Шаблон:Cite web
  137. Шаблон:Cite news
  138. 138,0 138,1 138,2 138,3 Шаблон:Cite news
  139. Шаблон:Cite web
  140. 140,0 140,1 Шаблон:Cite news
  141. China's amazing new bullet train CNN Money August 6, 2009
  142. Шаблон:Cite news
  143. Шаблон:Cite news JournalistsResource.org, retrieved Feb. 20, 2014.
  144. Шаблон:Cite web
  145. Шаблон:Cite news
  146. 146,0 146,1 146,2 146,3 146,4 146,5 146,6 Шаблон:Cite web
  147. Shelley Smith "Yuan Bond Sales Climb to Record Led by Railways: China Credit" Bloomberg 2010-10-13
  148. Шаблон:Cite web
  149. Шаблон:Cite web
  150. Шаблон:Cite web
  151. Шаблон:Cite web
  152. Шаблон:Cite news
  153. Шаблон:Cite web
  154. Шаблон:Cite web
  155. Шаблон:Cite web
  156. Шаблон:Cite newsШаблон:Dead linkШаблон:Cbignore
  157. Шаблон:Cite web
  158. Шаблон:Cite web
  159. Шаблон:Cite web
  160. Шаблон:Cite web
  161. Шаблон:Cite news
  162. Шаблон:Cite book
  163. Шаблон:Cite web
  164. Шаблон:Cite web
  165. Шаблон:Cite web
  166. 166,0 166,1 166,2 166,3 166,4 166,5 166,6 Шаблон:Cite news
  167. Шаблон:Cite news
  168. 168,0 168,1 168,2 168,3 Шаблон:Cite news
  169. "Bullet trains trigger profit growth for railways" The Irish Times September 25, 2012
  170. Шаблон:Cite web
  171. Шаблон:Cite news
  172. Шаблон:Cite news
  173. 173,0 173,1 Шаблон:Cite news
  174. Шаблон:Cite web
  175. Шаблон:Cite web
  176. Шаблон:Cite web
  177. 177,0 177,1 177,2 177,3 Шаблон:Cite web
  178. Шаблон:Cite news
  179. Шаблон:Cite news
  180. (Chinese)Шаблон:Cite web 2010-10-16
  181. Шаблон:Cite news
  182. Шаблон:Cite news
  183. Шаблон:Cite web
  184. Шаблон:Cite news
  185. 185,0 185,1 185,2 185,3 185,4 185,5 Шаблон:Cite news
  186. 186,0 186,1 Шаблон:Cite news
  187. Шаблон:Cite news
  188. Шаблон:Cite news
  189. Шаблон:Cite news
  190. Шаблон:Cite news
  191. Шаблон:Cite news
  192. Шаблон:Cite web
  193. Шаблон:Cite web
  194. Шаблон:Cite news
  195. Шаблон:Cite news
  196. "Siemens joins China bid for Saudi Haramain project" Шаблон:Webarchive March 24, 2010
  197. "China Is Eager to Bring High-Speed Rail Expertise to the U.S." N.Y. Times 2010-04-10
  198. Шаблон:Cite web
  199. Chinese Firm Constructs High-Speed Railway in Turkey 2014-01-18
  200. Шаблон:Cite web
  201. Шаблон:Cite web
  202. Шаблон:Cite web
  203. Шаблон:Cite web
  204. Шаблон:Cite web
  205. Шаблон:Cite web
  206. Шаблон:Cite web
  207. Шаблон:Cite web
  208. Шаблон:Cite web
  209. Шаблон:Cite web
  210. Шаблон:Cite web
  211. Шаблон:Cite web
  212. Шаблон:Cite web
  213. Шаблон:Cite news
  214. Шаблон:Cite web
  215. Шаблон:Cite web
  216. Шаблон:Cite web
  217. Шаблон:Cite news
  218. "China launches longest high-speed train service" China Daily 2017-01-05
  219. Шаблон:Cite news