Английская Википедия:High-speed rail in Europe

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates

Файл:High Speed Railroad Map of Europe.svg
Operational high-speed lines in Europe
Файл:Networks of Major High Speed Rail Operators in Europe.gif
Networks of major high-speed rail operators in Europe, 2019

High-speed rail (HSR) has developed in Europe as an increasingly popular and efficient means of transport. The first high-speed rail lines on the continent, built in the 1970s, 1980s, and 1990s, improved travel times on intra-national corridors. Since then, several countries have built extensive high-speed networks, and there are now several cross-border high-speed rail links. Railway operators frequently run international services, and tracks are continuously being built and upgraded to international standards on the emerging European high-speed rail network.

In 2007, a consortium of European Railway operators, Railteam, emerged to co-ordinate and boost cross-border high-speed rail travel. Developing a Trans-European high-speed rail network is a stated goal of the European Union, and most cross-border railway lines receive EU funding. Several countries — France, Spain, Italy, Germany, Austria, Sweden, Belgium, the Netherlands, Poland, Portugal, Russia and the United Kingdom — are connected to a cross-border high-speed railway network.Шаблон:Citation needed

More are expected to be connected in the coming years as Europe invests heavily in tunnels, bridges and other infrastructure and development projects across the continent, many of which are under construction now. Alstom was the first manufacturer to design and deliver a high speed train or HS-Train, which ended up in service with TGV in France.

Currently, there are a number of manufacturers designing and building HSR in Europe, with criss-crossed alliances and partnerships, including Alstom, Bombardier (owned by Alstom since 2021), Hitachi, Siemens, and Talgo.[1]

Early national high-speed rail networks

The first high-speed rail lines and services were built in the 1980s and 1990s as national projects. Countries sought to increase passenger capacity and decrease journey times on inter-city routes within their borders. In the beginning, lines were built through national funding programs and services were operated by national operators. Шаблон:Image frame Шаблон:Image frame

France

Файл:Carte TGV.svg
High-speed rail in France and bordering countries
Файл:France TGV high speed trains.webm
Video footage of TGV, Thalys and Eurostar rushing past in France (2018)

Шаблон:Main France was the first country to introduce high-speed rail in Europe when the LGV Sud-Est from Paris to Lyon opened in 1981 and TGV started passenger service. Since then, France has continued to build an extensive network, with lines extending in every direction from Paris. France has the second largest high-speed network in Europe, with Шаблон:Cvt of operative HSR lines in June 2021,[2] behind only Spain's Шаблон:Cvt.[3]

The TGV network gradually spread out to other cities, and into other countries such as Switzerland, Belgium, the Netherlands, Germany, and the UK. Due to the early adoption of high-speed rail and the important location of France (between the Iberian Peninsula, the British Isles and Central Europe), most other dedicated high-speed rail lines in Europe have been built to the same speed, voltage and signaling standards. The most obvious exception is the high-speed lines in Germany, which are built to existing German railway standards. Also, many high-speed services, including TGV and ICE utilize existing rail lines in addition to those designed for high-speed rail. For that reason, and due to differing national standards, trains that cross national boundaries need to have special characteristics, such as the ability to handle different power supplies and signalling systems. This means that not all TGVs are the same, and there are loading gauge and signalling considerations.

Line Operating speed (max) Length Construction began Construction completed
or expected start of
revenue services
LGV Sud-Est Шаблон:Convert
then Шаблон:Convert
Шаблон:Cvt 1976 1983
LGV Atlantique Шаблон:Convert Шаблон:Cvt 1985 1990
LGV Rhone-Alpes Шаблон:Cvt 1989 1994
LGV Nord Шаблон:Cvt 1989 1996
LGV Interconnexion Est Шаблон:Convert Шаблон:Cvt 1990 1996
LGV Méditerrannée Шаблон:Convert Шаблон:Cvt 1996 2001
LGV Est Européen Шаблон:Cvt 2002 2016
LGV Perpignan-Barcelona Шаблон:Convert Шаблон:Cvt 2004 2012
LGV Rhin-Rhone Шаблон:Convert Шаблон:Cvt 2006 2011
LGV Sud Europe Atlantique Шаблон:Cvt 2012 2017
LGV Bretagne-Pays de la Loire Шаблон:Cvt 2012 2017
LGV Nîmes-Montpellier Шаблон:Convert Шаблон:Cvt 2013 2018
LGV Bordeaux-Toulouse Шаблон:Convert Шаблон:Cvt 2024 2030
LGV Bordeaux-Espagne Шаблон:Cvt Unknown ~ 2032
LGV Montpellier-Perpignan Unknown Шаблон:Cvt 2030 2035
Lyon-Turin Шаблон:Convert Шаблон:Cvt 2007 2032

United Kingdom

Шаблон:Main

Early developments

Файл:43104 in Hull station.jpg
An InterCity 125 train at Hull Paragon in 1982. The InterCity 125 is the world's fastest diesel train.

Britain has a history of high-speed rail, starting with early high-speed steam systems: examples of engines are GWR 3700 Class 3440 City of Truro and the steam-record holder LNER Class A4 4468 Mallard. Later, high-speed diesel and electric services were introduced, using upgraded main lines, mainly the Great Western Main Line (GWML) and East Coast Main Line. The InterCity 125, otherwise known as the High-Speed Train (HST), was launched in 1976 with a service speed of Шаблон:Convert and provided the first high-speed rail services in Britain.[4] The HST was diesel-powered, and the GWML was the first to be modified for the new service.[5] Because the GWML had been built mostly straight, often with four tracks and with a distance of Шаблон:Cvt between distant signal and main signal, it allowed trains to run at Шаблон:Convert with relatively moderate infrastructure investments, compared to other countries in Europe. The Intercity 125 had proven the economic case for high-speed rail,[6] and British Rail was keen to explore further advances.

Файл:395 St Pancras International to St Pancras International 1L36 at Hothfield.jpg
British Rail Class 395 high-speed train in Kent

In the 1970s, British Rail began to explore new technologies for high-speed passenger rail services in the UK. While the Japanese and French railway authorities had decided to build completely new tracks for their respective Shinkansen and TGV high-speed rail systems, British Rail opted instead to develop a train capable of running on existing rail infrastructure: the Advanced Passenger Train (APT), with a top speed of Шаблон:Convert. An experimental version, the APT-E, was tested between 1972 and 1976. It was equipped with a tilting mechanism which allowed the train to tilt into bends to reduce cornering forces on passengers, and was powered by gas turbines (the first to be used on British Rail since the Great Western Railway). The line had used Swiss-built Brown-Boveri and British-built Metropolitan-Vickers locomotives (18000 and 18100) in the early 1950s. The 1970s oil crisis prompted a rethink in the choice of motive power (as with the prototype TGV in France), and British Rail later opted for traditional electric overhead lines when the pre-production and production APTs were brought into service in 1980–86.[7]

Initial experience with the Advanced Passenger Trains was pretty good. They had a high power-to-weight ratio to enable rapid acceleration; the prototype set record speeds on the Great Western Main Line and the Midland Main Line, and the production versions vastly reduced journey times on the WCML. The APT was, however, beset with technical problems; financial constraints and negative media coverage eventually caused the project to be cancelled.[8]

Файл:E320 Eurostar nearest the camera, older Alsthom stock behind at St Pancras.jpg
Eurostar high speed trains at St Pancras Station

Current network and projects

Trains currently travel at Шаблон:Convert on five lines (across at least one section): the East Coast Main Line, Great Western Main Line, Midland Main Line, parts of the Cross Country Route, and the West Coast Main Line.

New dedicated high-speed lines have an operating speed of more than Шаблон:Convert:

Like Finnish and Russian counterparts, the strongest reasons for new high-speed lines are to relieve congestion on the existing network and create extra capacity.

Line Operating speed (max) Length Construction began Construction completed or
expected start of revenue services
High Speed 1 Шаблон:Convert Шаблон:Cvt 1998 2007
High Speed 2 Шаблон:Convert Шаблон:Cvt 2019 2028

In order to carry passengers to destinations beyond the core routes to Paris and Brussels, new Class 374 trains, also referred to as the Eurostar e320, were introduced in November 2015. A Class 374 train has 900 seats, roughly equivalent to six Airbus A320s or Boeing 737s (the aircraft typically used by low-cost airlines).

Germany

Файл:ICE Network.png
ICE network

Шаблон:Unreferenced sectionШаблон:Main

Construction of the first German high-speed lines began shortly after that of the French LGVs. Legal battles caused significant delays, so that the InterCityExpress (ICE) trains were deployed ten years after the TGV network was established. The ICE network is more tightly integrated with pre-existing lines and trains as a result of the different settlement structure in Germany, with more than twice the population density of France. ICE trains reached destinations in Austria and Switzerland soon after they entered service, taking advantage of the same voltage used in these countries. Starting in 2000, multisystem third-generation ICE trains entered the Netherlands and Belgium. The third generation of the ICE reached a speed of Шаблон:Convert during trial runs in accordance with European rules requiring maximum speed +10% in trial runs, and is certified for Шаблон:Convert in regular service. Germany has around 1,658 kilometers (1,030 miles) of high speed lines.[13]

In the south-west, a new line between Offenburg and Basel is planned to allow speeds of Шаблон:Convert, and a new line between Frankfurt and Mannheim for speeds of Шаблон:Convert is in advanced planning stages. In the east, a Шаблон:Convert long line between Nuremberg and Leipzig opened in December 2017 for speeds of up to Шаблон:Convert. Together with the fast lines from Berlin to Leipzig and from Nuremberg to Munich, which were completed in 2006, it allows journey times of about four hours from Berlin in the north to Munich in the south, compared to nearly eight hours for the same distance a few years ago.

Line Operating speed (max) Length Construction
began
Construction completed
or expected start
of revenue services
Hanover–Würzburg high-speed railway Шаблон:Convert Шаблон:Cvt 1973 1991
Mannheim–Stuttgart high-speed railway Шаблон:Cvt 1976 1991
Hanover–Berlin high-speed railway Шаблон:Convert Шаблон:Cvt 1992 1998
Cologne–Frankfurt high-speed rail line Шаблон:Convert Шаблон:Cvt 1995 2002
Cologne–Aachen high-speed railway Шаблон:Convert Шаблон:Cvt 1997 2002
Nuremberg–Munich high-speed railway Шаблон:Convert Шаблон:Cvt 1998 2006–2013
Erfurt–Leipzig/Halle high-speed railway Шаблон:Cvt 1987 2015
Nuremberg–Erfurt high-speed railway Шаблон:Cvt 1996 2017
Karlsruhe–Basel high-speed railway Шаблон:Convert Шаблон:Cvt 1987 1993–2031
Stuttgart–Wendlingen high-speed railway Шаблон:Convert Шаблон:Cvt 2012 2025 (expected)
Wendlingen–Ulm high-speed railway Шаблон:Cvt 2012 2022

Italy

Файл:Italy TAV.png
Italy's high-speed rail network

Шаблон:Main The earliest high-speed rail line built in Europe was the Italian "Direttissima", the Florence–Rome high-speed railway Шаблон:Cvt in 1978, which used FS Class E444 3 kV DC locomotives. Italy pioneered the use of the Pendolino tilting train technology. The Italian government constructor Treno Alta Velocità has been adding to the high-speed network in Italy, with some lines already opened. The Italian operator NTV is the first open access high-speed rail operator in Europe, since 2011, using AGV ETR 575 multiple units.

In March 2011, a contract for the second phase of construction on the MilanVerona high-speed line was signed. This section will be Шаблон:Cvt long. Construction was originally to be completed by 2015,[14] it is open to Brescia from late 2016.

Line Operating speed (max) Length Construction
began
Construction completed
or expected start
of revenue services
Florence–Rome Шаблон:Convert Шаблон:Cvt 1970 1992
Rome–Naples Шаблон:Convert Шаблон:Cvt 1995 2005
PaduaVenice (Mestre) Шаблон:Convert Шаблон:Cvt 2007
Naples-Salerno Шаблон:Convert Шаблон:Cvt 2008
Milan–Bologna Шаблон:Convert Шаблон:Cvt 2002 2008
Bologna–Florence Шаблон:Cvt 1992 2009
Turin–Milan Шаблон:Cvt 2009
Milan–Brescia Шаблон:Cvt 2012 2016
Brescia-Verona Шаблон:Cvt 2016 2026[15]
Verona-Vicenza Шаблон:Cvt 2021 2026[16]
Vicenza-Padua 26 2024 2029[17]
Brenner Base Tunnel Шаблон:Convert Шаблон:Cvt 2006 2032[18]
Turin-Lyon Шаблон:Cvt 2011 2030[19]
Verona-Brenner[20] Шаблон:Cvt 2021 2032
Milano-Genoa[21] Шаблон:Cvt 2011 2023[22]
Naples-Bari Шаблон:Convert Шаблон:Cvt 2016 2027[23]
Florence rail bypass 100 km/h (62 mph) Шаблон:Cvt 2023 2028[24][25]

The Italian high-speed railway network consists of Шаблон:Cvt of lines, which allow speeds of up to Шаблон:Cvt. The safety system adopted for the network is the ERMTS/ETCS II, the state-of-the-art in railway signalling and safety.[26] The power supply follows the European standard of 25 kV AC 50 Hz mono-phase current. The Direttissima segment is still supplied with 3 kV DC current, but it is planned that this will be conformed to the rest of the network.[27]

Файл:Etr1000pistoialaunch.jpg
Frecciarossa 1000 is one of the fastest trains in Europe.[28][29]

With the entering into service of the ETR1000 train-sets, which have a designed top speed of Шаблон:Cvt[30] and a designed commercial speed of Шаблон:Cvt,[31] the rail network speeds where thought to be upgraded[32] to safely allow trains to run at such speeds. After it entered in service in 2015, the Frecciarossa 1000 underwent several speed tests along the Turin-Milan route, reaching the Italian rail speed record of Шаблон:Cvt on 26 February 2016.[33] On 28 May 2018, the Italian Ministry of Infrastructure and Transport and the ANSF announced that no further tests will be carried out, as issues of ballast being suctioned by the train emerged at those speeds, and that the speed limit would be maintained at Шаблон:Cvt, which is the speed for which it is currently certified.[31][34][35]

The increasing success of Italy's high-speed rail networks since 2008 has been cited as one of the main reasons that the flag carrier airline Alitalia, which focused on domestic flights, went bankrupt and ceased operations in October 2021 as high-speed train travel became faster, cheaper and more efficient.[36]

Spain

Файл:HighSpeedSpain.svg
The Spanish High-speed rail network, the longest in Europe

Шаблон:Main

Early developments

In 1978, the Spanish manufacturer Talgo registered the world speed record for diesel-powered trains at Шаблон:Cvt with a Talgo 4. The same company had reached successive records at Шаблон:Cvt in 1942 with a Talgo 1, Шаблон:Cvt in 1964 with a Talgo 3, and then reached Шаблон:Cvt on a static test bench in 1990 with a Talgo 350 tilting train. Following these technical benchmarks, maximum commercial speeds in the Spanish networks were set at Шаблон:Cvt in 1950, Шаблон:Cvt in 1986, and Шаблон:Cvt in 1989.[37][38]

The AVE service

The Alta Velocidad Española (AVE) high-speed rail service in Spain has been operating since 1992, when the Madrid–Seville route started running, at speeds up to Шаблон:Cvt, and up to Шаблон:Cvt between 2011 and 2016 on a Шаблон:Cvt section of the Madrid–Zaragoza railway.[39] More than ten other lines have been opened since 2005, including the Шаблон:Convert long Madrid–Barcelona line in 2008. By December 2021, the total length of the ADIF-maintained network was Шаблон:Cvt,[3] making it the longest in Europe, and the second longest in the world after mainland China's.

The ambitious AVE construction programme aims to connect with high-speed trains almost all provincial capitals to Madrid in less than 3 hours and to Barcelona within 6 hours. With an initial deadline set for 2020, the programme was slowed down by the financial crisis: the two main lines still under construction, the Mediterranean Corridor and the Madrid–Extremadura line (which would be part of the Madrid-Lisbon link), are yet to be completed.[40]

The Spanish and Portuguese high-speed lines are being built to European standard track gauge (UIC) of Шаблон:RailGauge and electrified with 25 kV at 50 Hz from overhead wire. The first HSL from Madrid to Seville is equipped with the LZB train control system, and later lines with ETCS.

Elsewhere in Europe, the success of high-speed services has been due in part to interoperability with existing normal rail lines. Interoperability between the new AVE lines and the older Iberian gauge network presents additional challenges. Both Talgo and CAF supply trains with variable gauge wheels operated by automatic gauge-changer equipment which the trains pass through without stopping (Alvias). Some lines are being constructed as dual gauge to allow trains with Iberian and UIC gauge to run on the same tracks. Other lines have been re-equipped with sleepers for both Iberian and UIC gauge, such that the track can be converted from Iberian to UIC gauge at a later time without changing the sleepers.

The first AVE trains to link up with the French standard gauge network began running in December 2013, when direct high-speed rail services between Spain and France were launched for the first time.[41] This connection between the two countries was made possible by the construction of the Perpignan–Barcelona high-speed rail line (a follow-up of the Madrid-Barcelona line), completed in January 2013,[42][43] and its international section Perpignan-Figueres, which opened in December 2010 and includes a new Шаблон:Convert tunnel under the Pyrenees. Another high-speed rail link connecting the two countries at Irun/Hendaye is also planned.

Current network and projects

The total length of lines is Шаблон:Cvt as of 2023,[3] with long-term plans to expand it up to Шаблон:Cvt. Several new high-speed lines are under construction with a design speed of Шаблон:Convert, and several old lines are being upgraded to allow passenger trains to operate at Шаблон:Convert.[44][45]

Line Operating speed (max) Length Construction
began
Construction completed
or expected start
of revenue services
Madrid–Seville high-speed rail line Шаблон:Convert Шаблон:Cvt 1989 1992
L.A.V. Madrid-Toledo Шаблон:Cvt Шаблон:Cvt 2003 2005
L.A.V. CórdobaMálaga Шаблон:Convert Шаблон:Cvt 2001 2007
L.A.V. Madrid–Valladolid Шаблон:Convert Шаблон:Cvt 2001 2007
Madrid–Barcelona high-speed rail line Шаблон:Cvt 1995 2008
L.A.V. Madrid–Valencia Шаблон:Cvt 2004 2010[46]
L.A.V. Albacete–Alicante Шаблон:Cvt Unknown 2013[46]
L.A.V. Barcelona – France–Spain border Шаблон:Cvt 2004 2013
Atlantic Axis high-speed rail line Шаблон:Convert Шаблон:Cvt[47] 2001 2015
L.A.V. Valladolid–León Шаблон:Convert Шаблон:Cvt 2009 2015
L.A.V. Valencia–Castellón Шаблон:Convert Шаблон:Cvt Unknown 2018[46]
L.A.V. PalenciaBurgos Шаблон:Convert Шаблон:Cvt 2009 2022
L.A.V. SevilleCádiz Шаблон:Convert Шаблон:Cvt 2001 2015[48]
L.A.V. Antequera–Granada Шаблон:Convert Шаблон:Cvt 2006 2019
L.A.V. LeónGijón Шаблон:Convert Unknown 2009 2023
L.A.V. Olmedo–Zamora-Galicia Шаблон:Cvt 2004 2021[49][50][51]
L.A.V. Murcia–Almería Шаблон:Convert Шаблон:Cvt Unknown 2026
L.A.V. BurgosVitoria-Gasteiz Шаблон:Convert Шаблон:Cvt 2009 2025
Basque Y Шаблон:Convert Шаблон:Cvt 2006 2028
Mediterranean High Speed Corridor:
AndalusiaMurciaValenciaCataloniaFrench border[52]
Шаблон:Convert +Шаблон:Convert 2004 2013–2025
Madrid–(Cáceres–Mérida–Badajoz)–Portuguese border[53] Шаблон:Cvt Шаблон:Cvt 2008 after 2020
L.A.V. MadridJaén Шаблон:Convert Unknown 2015 Unknown
L.A.V. MadridSantander[54] Unknown Unknown Unknown 2025
Madrid AtochaMadrid Chamartín Шаблон:Cvt Шаблон:Cvt Unknown 2022[55]
Файл:Avlo en Miraflores (51070652803).jpg
A Renfe Class 102 refurbished for Avlo services

Three companies have built or will build trains for the Spanish high-speed railway network: Spanish Talgo, French Alstom and German Siemens AG. Bombardier Transportation is a partner in both the Talgo-led and the Siemens-led consortium. France will eventually build 25 kV TGV lines all the way to the Spanish border (there is now a gap between Nîmes and Perpignan), but multi-voltage trains will still be needed, as trains travelling to Paris need to travel the last few kilometres on 1.5 kV lines. To this end, RENFE decided to convert 10 existing AVE S100 trains to operate at this voltage (as well as the French signalling systems), which will cost €30,000,000 instead of the previously expected €270,000,000 for new trains.[56]

The network eventually opened to operators other than RENFE, and the SNCF-owned low-cost brand Ouigo España began to serve the Madrid–Barcelona route on 10 May 2021.[57] To complement their higher-end AVE trains, RENFE launched a no-frills service called Avlo on 23 June 2021.[58] Iryo, operated by the ILSA joint venture between Air Nostrum and Trenitalia, began operation in late 2022, making Spain the first country in Europe with three competing operators of high-speed trains.[59][60]

Integration of European high-speed rail network

The Trans-European high-speed rail network is one of a number of the European Union's Trans-European transport networks. It was defined by the Council Directive 96/48/EC of 23 July 1996.

The aim of this EU Directive is to achieve the interoperability of the European high-speed train network at the various stages of its design, construction and operation.

The network is defined as a system consisting of a set of infrastructures, fixed installations, logistic equipment and rolling stock.

On 5 June 2010, the European Commissioner for Transport signed a Memorandum of Understanding with France and Spain concerning a new high-speed rail line across the Pyrenees to become the first link between the high-speed lines of the two countries. Furthermore, high-speed lines between Helsinki and Berlin (Rail Baltica), and between Lyon and Budapest, were promoted.[61]

Cross-border infrastructure and passenger services

Belgium

Шаблон:Main

Файл:Réseau grande vitesse Belgique.svg
High-speed rail network in Belgium

Belgium's rail network is served by four high-speed train operators: Thalys, Eurostar, ICE and TGV trains. All of them serve Brussels South station, Belgium's largest railway station. Thalys trains, which are a variant of the French TGV, operate between Belgium, Germany (Dortmund), the Netherlands (Amsterdam) and France (Paris). Since 2007, Eurostar has connected Brussels to London St Pancras, before which, trains connected to London Waterloo. The German ICE operates between Brussels, Liège and Frankfurt.

The HSL 1 is a Belgian high-speed railway line which connects Brussels with the French border. Шаблон:Cvt long (Шаблон:Cvt dedicated high-speed tracks, Шаблон:Cvt modernised lines), it began service on 14 December 1997. The line has appreciably shortened rail journeys, the journey from Paris to Brussels now taking 1:22. In combination with the LGV Nord, it has also affected international journeys to France and London, ensuring high-speed through-running by Eurostar, TGV, Thalys PBA and Thalys PBKA trainsets. The total construction cost was €1.42 billion.

The HSL 2 is a Belgian high-speed rail line between Brussels and Liège, Шаблон:Cvt long (Шаблон:Cvt dedicated high-speed tracks between Leuven and Ans, Шаблон:Cvt modernised lines between Brussels and Leuven and between Ans and Liège) it began service on 15 December 2002. Its extension to the German border (the HSL 3) is now in use, the combined high-speed line greatly accelerates journeys between Brussels, Paris and Germany. HSL 2 is used by Thalys and ICE trains as well as fast internal InterCity services.

The HSL 3 is a Belgian high-speed railway line which connects Liège to the German border. Шаблон:Cvt long (Шаблон:Cvt dedicated high-speed tracks, Шаблон:Cvt modernised lines), it began service on 13 December 2009. HSL 3 is used by international Thalys and ICE trains only, as opposed to HSL 2 which is also used for fast internal InterCity services.

The HSL 4 is a Belgian high-speed railway line which connects Brussels to the Dutch border. Шаблон:Cvt long (Шаблон:Cvt dedicated high-speed tracks, Шаблон:Cvt modernised lines). HSL 4 is used by Thalys trains since 13 December 2009 and it will be used starting 2010 by fast internal InterCity trains. Between Brussels and Antwerp (Шаблон:Cvt), trains travel at Шаблон:Convert on the upgraded existing line (with the exception of a few segments where a speed limit of Шаблон:Convert is imposed). At the E19/A12 motorway junction, trains leave the regular line to run on new dedicated high-speed tracks to the Dutch border (Шаблон:Cvt) at Шаблон:Convert.

The completion of the Channel Tunnel rail link (High Speed 1) and the completion of the lines from Brussels to Amsterdam and Cologne led to news reports in November 2007 that both Eurostar and Deutsche Bahn were pursuing direct services from London to Amsterdam and Cologne. Both journeys would be under 4 hours, the length generally considered competitive with air travel.

The 25N line (SchaerbeekMechelen) opened in 2012–2018 is designed for speeds up to Шаблон:Convert, but is limited to Шаблон:Convert until another existing line Mechelen-Antwerp will be upgraded. It's unknown when it will happen.

Netherlands

Шаблон:Main

Файл:Hslbenelux.png
HSL-Zuid, connected to Antwerp with the HSL 4

HSL-Zuid (Шаблон:Lang-nl, Шаблон:Lang-en) is a Шаблон:Cvt high-speed line in the Netherlands. Using existing tracks from Amsterdam Centraal to Schiphol Airport, the dedicated high-speed line begins here and continues to Rotterdam Centraal and to the Belgian border. Here, it connects to the HSL 4, terminating at Antwerpen-Centraal.[62] Den Haag Centraal (The Hague) and Breda are connected to the high-speed line by conventional railway lines.[63] Services on the HSL-Zuid began on 7 September 2009.[64] It is being served by Thalys trains from Amsterdam to Brussels and Paris, Eurostar trains to Brussels and London and domestic Intercity Direct train services.[65]

HSL-Oost was planned, but was put on hiatus. It would connect Amsterdam Centraal via Utrecht Centraal and Arnhem to Germany.[66] The existing line from Amsterdam to Utrecht is four-tracked. Two tracks out of four are capable of Шаблон:Cvt, but the available voltage is not high enough. The line is planned to be re-electrified to 25 kV AC.

In the north, a new line called Lelylijn is under study between Lelystad and Groningen, with operating speed up to Шаблон:Cvt.[67] This line would, along with other measures on the Amsterdam - Copenhagen corridor, allow to reduce the traveling time between these two cities down to 4h 30mn.[68]

Paris to Frankfurt

Admission of ICE trains onto French LGVs was applied for in 2001, and trial runs were completed in 2005. In June 2007, the LGV Est from Paris to the middle of the Lorraine region of France was opened. For the first time, high-speed services over the Franco-German border were offered. SNCF operates the TGV service between Paris and Stuttgart via Strasbourg and a daily return journey from Paris to Frankfurt via Saarbrücken, while ICE trains operate the remaining Paris to Frankfurt.

Frankfurt to Marseille

After the inauguration of the LGV Rhin-Rhône in 2011 a daily high-speed TGV service has been introduced between Frankfurt Hbf and Marseille St. Charles via Strasbourg, Mulhouse, Lyon and Valence with a total travel time under 8h.

Channel Tunnel

The construction of the Channel Tunnel, completed in 1994, provided the impetus for the first cross-border high-speed rail line. In 1993, the LGV Nord, which connects Paris to the Belgian border and the Channel Tunnel via Lille, was opened. Initial travel times through the tunnel from London to Paris and Brussels were about 3 hours. In 1997, a dedicated high-speed line to Brussels, HSL 1, was opened. In 2007, High Speed 1, the Channel Tunnel Rail Link to London, was completed after a partial opening in 2003. All three lines were built to the French LGV standards, including electrification at 25 kV. The Channel tunnel itself is geometrically achievable to provide Шаблон:Convert speed, but it is limited to Шаблон:Convert. In the 1990s it was claimed that such speed restriction is temporary.[69]

London to Paris and Brussels

Passenger trains built to specific safety standards are operated by Eurostar through the Channel Tunnel. Direct trains now travel from London St Pancras to Paris in 2h15, and to Brussels in 1h51. On 1 May 2015 Eurostar introduced a weekly service from London to Lyon, Avignon and Marseille. Thalys high-speed international trains serve the Paris to Brussels corridor, which is now covered in 1h20. Additional Thalys services extend to Amsterdam and Cologne in addition to Belgian cities.

London to Amsterdam and Germany

Both Deutsche Bahn (DB) and Eurostar have announced plans for direct services from London to new continental destinations in the Netherlands and Germany. DB have not set a date for any new service to begin, although the company did at one point hope to introduce a five-hour service to Frankfurt by 2017. A four times daily direct Eurostar service between London St Pancras and Amsterdam started running on 4 April 2018. The German manufacturer Siemens has designed trainsets to meet the strict safety standards of Channel Tunnel operation.

Spanish-French border

A Шаблон:Convert section of the Perpignan–Barcelona high-speed rail line across the Spanish-French border opened in January 2013.[70] The line includes the new Шаблон:Convert Perthus Tunnel under the Pyrenees and permits high-speed rail services between Spain and France.[71] Since 15 December 2013 the French SNCF operates a TGV service between Paris and Barcelona and the Spanish AVE offers direct MadridMarseille, Barcelona–Lyon and Barcelona–Toulouse high-speed services.[72][73] The journey time for the TGV Paris–Barcelona service is now 6h 25min.[74] A 60 kilometer Nîmes–Montpellier bypass is under construction and will chop 20 minutes off travel times from Barcelona to Lyon and beyond.[75] There is on the other hand currently no funding for the missing segment of high-speed line between Montpellier and Perpignan, which would cut journey times between the two countries by an additional hour.

Another high-speed rail link connecting the two countries is planned via Irun/Hendaye, but is not currently funded.

Crossing the Alps

The north–south axis has been improved by the Swiss NRLA project already in 2007 with the Lötschberg Base Tunnel and in 2016 with the currently world's longest railway tunnel, the Gotthard Base Tunnel.

Further international links between Italy and France, Switzerland, Austria and Slovenia are under way. These links all incorporate extensive new tunnelling under the Alps. European Union funding has already been approved for the Turin–Lyon high-speed railway, which will connect the TGV and TAV networks, and for a link with Slovenia. In Slovenia, Pendolino-based trainsets are operated by Slovenian Railways as the InterCitySlovenija. Trains connect the capital Ljubljana with Maribor and also with Koper in the summer months. One unit operated as EC Casanova on the line LjubljanaVenice, but this service was discontinued in April 2008.

Between Austria and Italy, the Brenner Base Tunnel is being constructed to upgrade the Berlin–Palermo railway axis.

Future projects adjacent to existing high-speed services

Magistrale for Europe

Файл:Magistrale for Europe.gif
Planned high-speed rail link Paris – Bratislava

The Magistrale for Europe (MoE) is an initiative to promote railway expansion between Paris and Bratislava/Budapest, passing Strasbourg and Munich.[76] Founded in 1990, the initiative is supported by numerous cities and regions along the line.[77] Several railway projects, such as the LGV Est and Rastatt tunnel, have been promoted through the initiative.[78]

Austria

Шаблон:Main The Western Railway between the capital Vienna and Salzburg is being upgraded. Most new sections have a continuous maximum design speed of Шаблон:Convert.[79] German and Austrian ICE trains operate at a maximum speed of Шаблон:Convert, as do Austrian locomotive-hauled trains (called railjet) which were launched in 2008.

The Шаблон:Convert Brenner Base Tunnel under construction will allow speeds of up to Шаблон:Convert.[80][81] The first part of the New Lower Inn Valley railway was opened in December 2012 as part of an upgrade of the line connecting the future Brenner Base Tunnel and southern Germany, which is being upgraded from two tracks to four and to a maximum design speed of Шаблон:Convert. The section is also part of the Berlin–Palermo railway axis.

The Koralm Railway, the first entirely new railway line in the Second Austrian Republic has been under construction since 2006. It includes a new Шаблон:Convert tunnel (the Koralm Tunnel) connecting the cities of Klagenfurt and Graz. Primarily built for intermodal freight transport, it will also be used by passenger trains travelling at up to Шаблон:Convert. The time taken to travel from Klagenfurt to Graz will be reduced from three hours to one hour. The Koralmbahn is expected to be operational by 2025.

Line Operating speed (max) Length Construction began Service started
Western Railway (Vienna - Attnang-Puchheim) Шаблон:Convert
(per sections)Шаблон:Clarify[82]
Шаблон:Convert Unknown (past) 1990 (Linz - Wels) to 2016 (Ybbs - Amstetten)[82]
New Lower Inn Valley railway (Kundl - Baumkirchen) Шаблон:Cvt[82] Шаблон:Convert Unknown (past) 9 December 2012
Marchegger Eastern railway (upgrade Vienna Stadlau - Slovakian border) Шаблон:Convert[82] Шаблон:Cvt[82] Unknown (past) 2022 (expected)[82]
Pottendorfer line (upgrade & new Vienna Inzersdorf Ort - Wr. Neustadt) Шаблон:Cvt[82] Unknown (past) 2023 (expected)[82]
Koralm Railway (Graz - Klagenfurt) Шаблон:Convert[82] Шаблон:Cvt 2001 2025 (expected)[82][83]
Semmering Base Tunnel (Gloggnitz - Mürzzuschlag) Шаблон:Convert[82] Шаблон:Cvt 2012 2030 (expected)[84]
Brenner Base Tunnel & its Austrian access (Volders-Baumkirchen - Italian border) Шаблон:Convert[82] Шаблон:Cvt[82] Summer 2006 2032 (expected)[85][86]
North Railway (upgrade Gänserndorf - Břeclav, Czech Republic) Шаблон:Convert[82] Шаблон:Cvt[82] 2024 (expected)[82] 2030 (expected)
Western Railway (new line Köstendorf - Salzburg) Шаблон:Convert Шаблон:Cvt 2025/2026 (expected) 2040 (expected)
New Lower Inn Valley railway (Kundl - Brannenburg, Germany) Шаблон:Convert Шаблон:Cvt Unknown (future) Unknown (future)

Switzerland

Шаблон:Main

Файл:GBT north.jpg
SBB EuroCity entering the Gotthard Base Tunnel

The French-Swiss co-operation TGV Lyria and German ICE lines extend into Switzerland, but given the dense rail traffic and the often difficult terrain, they do not attain speeds higher than Шаблон:Convert (ICE3) or Шаблон:Convert (TGV, ICE1, ICE2). The fastest Swiss train is the SBB RABe 501 also named Giruno. It is operated by the Swiss Federal Railways since May 2016. They can reach higher speeds than conventional trains on the curve-intensive Swiss network, however the top speed of Шаблон:Convert can only be reached on high-speed lines. The former Cisalpino consortium owned by the Swiss Federal Railways and Trenitalia used Pendolino tilting trains on two of its international lines. These trains are now operated by the Swiss Federal Railways and Trenitalia.

To address transalpine freight and passenger bottlenecks on its roads and railways, Switzerland launched the Rail2000 and NRLA projects.

Line Service speed (passenger) Design speed Length Construction began Construction completed or
start of revenue services
Mattstetten–Rothrist new line Шаблон:Convert Шаблон:Convert Шаблон:Cvt 1996 2004
Solothurn-Wanzwil new line Per section:

Шаблон:Convert

or Шаблон:Convert

Per section:

Шаблон:Convert

or Шаблон:Convert

Шаблон:Cvt ? 2004
Lötschberg Base Tunnel Шаблон:Convert Шаблон:Convert Шаблон:Cvt 1994 2007
Gotthard Base Tunnel Normal:

Шаблон:Convert

If delay:

Шаблон:Convert

Technical:

Шаблон:Convert

Authorized:

Шаблон:Convert

Шаблон:Cvt 1999 2016
Ceneri Base Tunnel Normal:

Шаблон:Convert

If delay:

Шаблон:Convert

Technical:

Шаблон:Convert

Authorized:

Шаблон:Convert

Шаблон:Cvt 2006 2020


Nordic countries

Denmark

Шаблон:Main

Файл:Danish rail network approved lines.svg
Current completed and approved high-speed lines set to be built or upgraded in Denmark

Denmark is currentlyШаблон:When building two high-speed corridors: an international corridor linking Sweden to Germany through Copenhagen South, and a national corridor aiming to reduce travel times between the five biggest cities to less than one hour.

Denmark's two biggest cities, Copenhagen and Aarhus, are about Шаблон:Convert apart. There is a political target to reach a two-hour traveling time between them, and Шаблон:Convert is set as a target speed.[87] Some parts are planned to be rerouted because the present railway is too curvy. These new sections are to designed for at least Шаблон:Convert.

The top speed of some small sections of the main lines is Шаблон:Convert,[88] but trains quickly pass through these and return to slower sections around Шаблон:Convert. Most parts of the rail network are unelectrified – thus slowing acceleration and top speed.[89] Since 2007 it has been common practice for the infrastructure provider Banedanmark to pad the timetables with extra time to a near European recordШаблон:Clarify, so that trains only use the top speeds to make up for lost time.[90][91] Some of the rolling stock running on the Danish rail network is capable of reaching Шаблон:Convert, the SJ 2000 and the IC4 (the IC4 is only allowed up to 180 km/h or 112 mph in regular operation).

Denmark's signalling system, which contains numerous obsolete components, is being replaced with ERTMS 2, to be finished in 2030. This is a requirement for speeds higher than Шаблон:Convert.[92][93]

The railway line from Ringsted towards the future Fehmarn Belt Fixed Link was upgraded to a Шаблон:Convert double-tracked line in 2021.[94] Once the fixed link project is completed, Denmark will be able to link the Swedish high-speed lines with the rest of the European high-speed rail network. As Germany is electrifying and upgrading the Lübeck–Puttgarden railway from the current limit of between Шаблон:Convert to Шаблон:Convert, the only non-highspeed section will be Lübeck–Hamburg.

In 2013 the Danish Government (consisting of the parties: the Social Democrats, the Danish Social Liberal Party and the Socialist People's Party) along with the supporting party Red–Green Alliance and the opposition party Danish People's Party entered an ambitious political agreement on the infrastructure project called "The Train Fund DK". The main component of the agreement is to raise taxes on the oil companies operating in the Danish parts of the North Sea in order to raise 2,8 billion poundsШаблон:Clarify earmarked for railway upgrades. The first priority is to reduce the travel time between Denmark's two biggest cities, Copenhagen and Aarhus to two hours. This includes upgrading all main lines to handle speeds up to Шаблон:Convert and building three new high-speed lines with speeds up to Шаблон:Convert, which later can be upgraded to Шаблон:Convert. Furthermore, all main lines and many regional lines will be electrified.[95][96]

Line Operating speed Length Construction began Start of revenue services
Øresund fixed link Шаблон:Convert Шаблон:Convert 1995 2000
Copenhagen–Ringsted Line[97] Шаблон:Convert
(currently Шаблон:Convert)
Шаблон:Convert 2011 June 2019 at Шаблон:Convert;[98]
upgrade to Шаблон:Convert expected in 2023
RingstedFehmarn (part of Vogelfluglinie)[99] Шаблон:Convert Шаблон:Convert 2013 Expected 2029[100]

Finland

Файл:Finnish railroad network speeds 2019.png
Running speeds on the Finnish railway network

Шаблон:See also In Finland the national railway company VR operates tilting Alstom Pendolino trains. The trains reach their maximum speed of Шаблон:Convert in regular operation on a Шаблон:Convert route between Kerava and Lahti. This portion of track was opened in 2006. The trains can run at Шаблон:Convert on a longer route between Helsinki and Seinäjoki and peak at that speed between Helsinki and Turku.[101] The main railway line between Helsinki and Oulu is being upgraded between Seinäjoki and Oulu to allow for trains to run at speeds between Шаблон:Convert.[102] Other parts of the Finnish railway network are limited to lower speed.

Between 2007 and 2010 the Russian line from the Finnish border to Saint Petersburg was electrified and improved to allow higher running speeds. The Finnish line (Riihimäki – Saint Petersburg Railway) was also upgraded where needed, mostly to Шаблон:Convert. In 2010, a new service called Allegro started between Helsinki and Saint Petersburg, using the improved network. The service has a journey time of 3½ hours. It utilizes a new Pendolino model, supporting both Finnish and Russian standards.[103][104] Four new trains have been delivered, with a top speed of Шаблон:Convert. As of 2022, the service is on hold, a consequence of the 2022 Russian invasion of Ukraine.[105]

The planned Helsinki–Turku high-speed railway featuring new track from Espoo to Salo would be capable of maximum speeds of Шаблон:Convert, making this the fastest railway in Finland once built.

Line Speed Length Construction began Expected start of revenue services
ELSA-rata (Espoo-Salo Railway) Шаблон:Convert Шаблон:Convert Planned 2031

Iceland

A Шаблон:Convert long railway, the first in Iceland, has been proposedШаблон:Fix to link Keflavík International Airport to the capital city of Reykjavík in order to relieve one of the country's busiest roads. The railway would accommodate high-speed trains of up to Шаблон:Convert, with an average speed of Шаблон:Convert, which would enable the distance to be travelled within just 18 minutes. As of 2022, the project had not advanced beyond the proposal stage.[106]

Compared to widening the road, it would be more expensive (in the context of the country's relatively small economy), more environmentally destructive, and probably more vulnerable to adverse weather conditions.

Proposal for a Keflavík–Reykjavík line
Line Speed Length Construction began Expected start of revenue services
Reykjavik—Airport Rail Link Шаблон:Convert Шаблон:Convert Proposed 2025Шаблон:Dubious

Norway

Файл:Flytoget Oslo S.jpg
The Flytoget at Oslo station, Norway

Шаблон:Main Norway has several high speed stretches radiating from Oslo. These have speeds ranging from Шаблон:Convert. Several new railroad stretches are under construction and the complete Intercity triangle from Oslo will be finished by 2030.

Norway's only high-speed line is the Шаблон:Convert Gardermobanen (The Gardermoen Railway), which links Oslo Airport (OSL) with the metropolitan areas of Oslo. Here the Flytoget (the Airport Express Train) and some of the NSB (Norwegian State Railways) trains operate at speeds of up to Шаблон:Convert.[107] Gardermobanen contributes to give rail transport a relatively high market share. Almost 38% of the OSL passengers come by train, about 21% by bus, and about 40% by car.

Some more new high-speed lines are planned to be built in the Oslo region, during the 2010 and 2020 decades. Today, however, only small parts of Norway's rail network permit speeds faster than Шаблон:Convert.

There is a political climate for building more high-speed railway services in Norway, including long-distance lines from Oslo to Trondheim, Bergen, Stavanger and Gothenburg. They are assumed to be dedicated single-track high-speed railways having up to Шаблон:Convert. This is still at the feasibility planning stages.[108]

The Norwegian government is examining five lines radiating out from Oslo to Bergen, Kristiansand/Stavanger, Trondheim, Gothenburg, and Stockholm. A sixth line would be a coastal line between Bergen, Haugesund and Stavanger. At least two investigations on cost and benefit have been made. A more indepth analysis covering route analysis of the 6 lines will be made on order by the Norwegian government beginning late 2010.[109]

The closest Шаблон:Convert from Oslo on each of these lines have good potential for regional trains (except towards Stockholm). Upgrade and new construction to high-speed standard have to some extent already taken place like for Gardermobanen. More is being built and is planned, but with the present ambition it will take decades to have high-speed standard the closest Шаблон:Convert from Oslo on all these lines. The ambition is to some day have Шаблон:Convert or more to Halden, Skien, Hønefoss and Hamar. These projects have higher priority than the long-distance projects. They are also preconditions for the long-distance projects, since they will be used by long-distance trains.

Line Speed Length Construction began Start of revenue services
Drammen–Tønsberg Шаблон:Convert Шаблон:Convert 1993 2012–≈2025
Eidsvoll–Hamar Шаблон:Convert 2012 2015–≈2025
Oslo–Ski Шаблон:Convert Шаблон:Convert 2020 11 December 2022

Parts of the new built route Drammen–Tønsberg is in operation with trains (Stadler FLIRT) capable of 200 km/h.

Sweden

Шаблон:Main Newly built lines such as the West Coast Line, the Svealand line and the Bothnia line of the network can be relatively easily upgraded to Шаблон:Convert. This requires new signalling system, new trains and perhaps other minor efforts. The old main lines are difficult to upgrade due costs for increasing the bearing of the track. Most bridges and long sections of the main lines need to be rebuilt to allow Шаблон:Convert.

There are investigations regarding high-speed trains in Sweden, and to evaluate if the Western and Southern Mainline should be upgraded to Шаблон:Convert or if a whole new network of high-speed railway for Шаблон:Convert should be built between StockholmLinköpingJönköpingGothenburg and between JönköpingMalmöCopenhagen. The plan is to ease the situation on the existing railways that are relatively congested, combined with better travel times between both the largest three cities in Sweden, as well as fast regional trains between the cities along the routes (which today in many cases have no or slow railways).

An informal date suggestion by the Banverket is operation by year 2030. For two parts (SödertäljeLinköping and MölnlyckeBollebygd) detailed planning is done, and they are expected to have construction start by around 2017 and be in operation by around 2025.[110][111]

Many of the newly built railway lines in Sweden are adapted for speeds up to Шаблон:Convert, such as Botniabanan, Grödingebanan, Mälarbanan, Svealandsbanan, Västkustbanan, and Vänernbanan.[112] The problem that is slowing down high-speed rail in Sweden is the present signaling system (ATC), which does not allow speeds over Шаблон:Convert. It can be upgraded, but it will not be done since it shall be replaced by the European signaling system ERTMS level 2 on major lines in the near future, allowing high speeds up to Шаблон:Convert.[113] ERTMS level 2 has been installed and is being tried out on Botniabanan, and that railway allows Шаблон:Convert, although no passenger train goes above Шаблон:Convert for now. The train set X55-Regina has been delivered to the rail company SJ with the max speed of Шаблон:Convert but with the option to upgrade the EMU to Шаблон:Convert when possible.[114] These trains haven't got increased speed as of 2022, but SJ has in 2022 ordered new Zefiro trains which shall be able to go in 250 kph. Also the mix with freight trains slow down the practical speed.

There are five major high-speed projects proposed in Sweden with speeds between Шаблон:Convert.

The three first listed and the last, but not Europabanan, have been prospected by Trafikverket. In several cases the detailed alignment have been decided. The Swedish Conservative government 2006–2014 showed little interest in major railway projects. But the socialist/environmentalist government has from 2014 started further negotiations on stations and other alignment. There is plan to start building Gothenburg–Borås and Ostlänken in 2019. The other railways are expected to be built some years after. As of 2022 there is no decision. A problem is that cost has been increasing a lot.

With the 2022 elections, the left-wing–green–liberal constellation lost its majority and a new right-wing government was formed, which cancelled the main high-speed rail projects in southern and central Sweden.[120]

South-east

Turkey

Шаблон:Update

Файл:Rail transport map of Turkey.png
Turkish HSR Network: High-speed rail lines in service, those under construction, and those in the planning stages

Шаблон:Main Turkey started building high-speed rail lines in 2003 aiming a double-track high-speed rail network through the country allowing a maximum speed of Шаблон:Convert[121] Only the planned line between Istanbul, Edirne and Kapıkule is situated in the European part of the country.

The first line that was built aimed to connect Istanbul to Ankara (via Eskişehir) reducing the travel time from 6–7 hours to 3.5 hours. The Eskişehir-Ankara line started operating regular services on 14 March 2009 with a maximum speed of Шаблон:Convert, being the first High Speed Rail Service in Turkey making the Turkish State Railways the 6th European national rail company to offer HSR services (although these are situated in the Asian part of the country). The Eskişehir-Istanbul(Pendik) line is inaugurated in 2014 and the line extended to Halkalı in European side with Marmaray project via Marmaray Tunnel on 12 March 2019.

The Ankara–Konya line construction began in 2006 and inaugurated in 2011. The travel time was cut to 70 minutes on this route. The Konya–Karaman route also began construction in 2016 and was inaugurated in February 2021. The construction of the Ankara–KırıkkaleYozgatSivas line began in February 2009 and inaugurated on 26 April 2023. The travel time between Ankara and Sivas is cut from 12 hours to 2.5 hours. Several other HSR line projects between major cities such as Ankara–AfyonUşakİzmir, Ankara–Kayseri, Bilecik–Bursa–Bandırma, Istanbul–EdirneKapıkule (Bulgarian border), Karaman–Ulukışla and MersinAdanaOsmaniyeGaziantep lines are in construction phase. In addition EskişehirAfyonAntalya, Sivas–Erzincan and Aksaray–Ulukışla–Yenice lines are planned to be built in the coming years. The Antalya–Alanya–Konya and ErzincanErzurumKars lines are also in planning phase. The total length of constructed lines is.

The first 12 high-speed trainsets are ordered from CAF company, Spain. Several new trainsets from Siemens were also bought for the Ankara-Konya line, now operating in all HSR lines in Turkey.

Line Speed Length Construction began Start of revenue services
AnkaraSivas Шаблон:Convert Шаблон:Cvt 2009 April 2023
BandırmaBursaOsmaneli Шаблон:Convert Шаблон:Convert 2012 expected 2024
Polatlıİzmir Шаблон:Convert Шаблон:Cvt 2012 expected 2024 (Ankara to Afyonkarahisar) 2025 (İzmir)
KaramanUlukışla Шаблон:Convert Шаблон:Convert 2016 expected 2023
MersinAdanaGaziantep Шаблон:Cvt 2020 expected 2024
Istanbul (Halkalı)Kapıkule (Bulgarian border) Шаблон:Cvt 2019 expected 2023 (Çerkezköy to Kapıkule) 2024 (Halkalı to Çerkezköy)
YerköyKayseri Шаблон:Cvt 2022 expected 2026

Greece

Шаблон:Main Development of a modern rail network for Greece has been a major goal since the 1990s. In 1996, construction of what is currently known as the P.A.Th.E./P. was given the go-ahead. The line, which should have opened by 2004, would link Patras, Athens, Thessaloniki and the Greece–North Macedonia and Greece–Bulgaria borders in Idomeni and Promachonas respectively. The project faced lack of funding and construction difficulties. The Athens-Thessaloniki section has been finished, allowing a travel time of 3 hours 20 minutes, a reduction of three hours.

Line Speed Length Construction began Expected start of revenue services
PatrasAthensThessaloniki–borders with Republic of North Macedonia & Bulgaria Шаблон:Convert approx. Шаблон:Cvt 1994 2022 (parts already in operation)

Hungary and Romania

November 2007, the two countries agreed to build a high-speed line between their capital cities Budapest and BucharestШаблон:Citation needed which would be a part of a larger transportation corridor Paris-Vienna-Budapest-Bucharest-Constanța. Шаблон:As of, the railway from Bucharest to Constanța support speeds up to Шаблон:Convert. The plan for a high-speed railway through Budapest-Arad-Sibiu-Brașov-Bucharest-Constanța was officially included in the revised TEN-T plan in October 2013 as part of the Rhine-Danube Corridor.[122] In 2022, the Romanian Ministry of Transport and Infrastructure announced a 120 million euros feasibility study for the construction of a high-speed line connecting Bucharest to Constanța and the Port of Constanța, as well as a line to Budapest, making use of the European Union Recovery Instrument following the COVID-19 pandemic. The study is planned to be finished by 2026. Two variants of the line to Hungary are studied, including one through the Olt river Valley, passing Sibiu, Cluj and Oradea with a length of 590 kilometres and an estimated cost of 17 billion euros. The second variant is a hybrid approach, which includes sections of lower speeds taking into account geographical aspects and economic profitability.[123]

Hungary and Serbia

Шаблон:Main

As a result of negotiations between the two European countries and China, it was decided to build a high-speed line between their capital cities Budapest and Belgrade, as a part of a larger corridor Budapest-Belgrade-Niš-Skopje-Thessaloniki-Athens, by upgrading the current Budapest–Belgrade railway line to Шаблон:Convert in Serbia and to Шаблон:Convert in Hungary.[124][125]

The construction of the railway line in Serbia started in September 2017, when the construction of the Čortanovci tunnel began.[126] The Шаблон:Cvt railway for speed up to Шаблон:Convert between Belgrade and Novi Sad opened on 19 March 2022 (this part was divided in two sections: as of 2018, the Belgrade - Stara Pazova Шаблон:Convert section was planned to be finished in the end of 2020 and the Stara Pazova - Novi Sad Шаблон:Convert section in November 2021).[127][128][129][130] The construction of the Шаблон:Convert section between Novi Sad and Subotica (Hungarian border) was started on 7 April 2022 and is due to be completed for the end of 2024.[131]

The construction of the Hungarian part of the railway, Шаблон:Cvt, was started in October 2021 and is due to be completed by 2025.[132][124] When the project is complete, the journey between Budapest and Belgrade should be reduced to 2h 40mn according to some sources and to 3h 30mn according to some others.[127][125]

Serbia

After the realisation of a high speed line between Belgrade and Novi Sad, additional high speed connections within Serbia are planned as well as the modernisation of branch lines which will connect the main high speed line Subotica-Niš with neighbouring countries like North Macedonia and Bulgaria.

LineШаблон:Citation needed Speed Length Start of revenue services
Belgrade - Novi Sad Шаблон:Convert Шаблон:Cvt 19.03.2022[133]
Novi Sad - Subotica Шаблон:Convert Under construction - end of 2024[134]
Belgrade - Niš Шаблон:Cvt Construction to start in June 2023.[135] Completion expected for 2026 (partial) & 2029.[135][136]
Subotica - Horgoš Шаблон:Convert Шаблон:Cvt 01.08.2022[137]
Niš - Dimitrovgrad Шаблон:Cvt By 2025.[135]
Niš - Preševo Шаблон:Cvt Early 2026.[135]

Other high-speed projects

Several other countries in Europe have launched or planned high-speed rail programmes. Due to geographic challenges, these projects are likely to remain national in scope for the foreseeable future, without international links to existing high-speed networks.

Belarus

In 2017 Belarus authorities agreed to offer land territories to Chinese corporation CRCC for construction of a high-speed corridor between the EU and Russia through country territory. Chinese engineering companies are also interested in building highways and Russian high-speed railways running in connection with this route with possible interchange with the Moscow-Kazan high-speed corridor.[138]

The Baltics

A north/south Rail Baltica line from Tallinn to Kaunas is planned to be constructed starting in 2019 and in service by 2026. The line would connect Tallinn and Kaunas via Pärnu, Riga and Panevėžys, while also providing connections to airports and railway terminals. The railway will be the first high-speed, 1435mm standard gauge railway in the Baltics. From Kaunas, it will be connected to the already existing high-speed network in Poland. Project speeds are Шаблон:Cvt for passenger trains and Шаблон:Cvt for freight traffic. About 80% of construction costs (totalling ca. 5 billion €) will be covered by the European Union, the rest will be paid jointly by the Estonian, Latvian and Lithuanian governments. Indirectly the railway may also link Helsinki, as there are plans for a Tallinn-Helsinki railway tunnel.[139]

The project has been surrounded with controversy in all states, mainly due to environmental concerns and the cost of the project. According to surveys conducted to Estonia, public support remains around 60%, with the percent higher amongst people living in Tallinn and amongst people with higher education, while the percent drops in rural areas. Controversy has also surrounded the choice of route, with some proposing that the railway should also go through Tartu and Vilnius. However this has been dismissed as they are large detours, would increase the cost and bring no sufficient benefit.[140]

Croatia

Шаблон:Main With the highway construction programme in its final stages, the Croatian parliament has passed a bill to build its first high-speed line, a new BotovoZagrebRijeka line, with an initial maximum planned speed of 250 km/h.[141][142] The high speed rail will be ready by 2030.[143]

Czech Republic

Шаблон:Main

Файл:Map of High Speed Railroad in Czechia and neighbourhood.png
Map of planned high-speed railroads in Czechia

In 2004, the Czech Ministry of Transportation presented its plan for a high-speed rail network which should be roughly Шаблон:Convert long.[144] In 2017 the government approved five main lines connecting the biggest cities (main line being the RS1 Prague-Brno-Ostrava) and neighbouring countries. The operation speed should reach more than 300 km/h (186 mph) on most parts. Different parts of the expected network are at different stages of planning as of 2023, however construction of some should start by 2026.[145]

The most challenging part of high-speed rail will be linking Prague and Dresden in Saxony via Ústí nad Labem which will require a new 25 km long tunnel through the Ore Mountains. It should have speed of 200km/h for personal transport and 110 km/h for freight transport.[146] The tunnel is of a strategic importance for Czechia as in 2023 the only electrified line linking Germany and the Czech Republic goes through the narrow Elbe valley which capacity is limiting. The connection between Prague, Dresden and Berlin lies on the European Orient/East-Med Corridor, an important freight link to the North Sea ports. The rail connection was added to the German Bundesverkehrswegeplan 2015 (federal transportation plan) which lays out German transportation priorities until 2030, but it does not include the line in its highest priority category, making construction unlikely in the near term.[147]Шаблон:Unreliable source?

In regard to the rolling stock, the Czech Railways have been running the Super City Pendolino from Prague to Ostrava since 2005. The Pendolino is capable of operating at Шаблон:Convert, but trains that are in service are limited to Шаблон:Convert due to the speeds the railways were constructed for. These limits may be raised in the future to Шаблон:Convert. For example the last parts of 4th transit corridor (PragueČeské Budějovice) are already projected for Шаблон:Convert.[148] The railjet rolling stock is also capable of Шаблон:Convert and reaches that speed in Austria and Germany but is likewise limited to Шаблон:Convert in the Czech Republic.

The Velim railway test circuit contains a large Шаблон:Convert track with a maximum allowed speed of Шаблон:Convert for tilting trains and up to Шаблон:Convert for conventional trains.[149]

Hungary

In September 2022 the Hungarian Government has announced the purchase of 39 + 10 trains (composed of 7 carriages each) and 50 Siemens Vectron locomotives with the purpose of upgrading up to 2/3 of the existing long-distance passenger fleet running on domestic and international InterCity services of the Hungarian State Railways. The project foresees services similar to those provided by ÖBB's railjet services running in Austria as well as abroad, including between Budapest and Vienna (and forward to Munich or Zurich). The company plans to offer upgraded InterCity services on the following lines:

The new rolling stock is capable of reaching running speeds up to Шаблон:Convert. However, currently the highest allowed speed limit in the country remains at 160 km/h on the Budapest–Hegyeshalom (Austrian border) line.

Furthermore, in January 2022, the Hungarian Government has also announced to conduct a feasibility study on a new high-speed line capable of reaching speeds up to 250–300 km/h between Budapest and Cluj-Napoca, Transylvania, Romania.[151]

Ireland

In 2020 the Irish Government confirmed it will be launching a study into an approximately Шаблон:Convert high-speed railway from Belfast via Dublin to Cork and Limerick,[152] which could cost around €15 billion.[153]

Poland

Шаблон:Main

Файл:Polish Pendolino front 2.JPG
Polish Railways New Pendolino in Wrocław, western Poland

Today, the main cities of Poland are linked by railway transport reaching Шаблон:Convert. On 14 December 2014, Polish State Railways started passenger service trains PKP Pendolino ED250 operating Шаблон:Convert speed on Шаблон:Convert line Olszamowice-Zawiercie (part of railway line called Central Trunk Line (CMK) from Warsaw to Katowice). Currently it is the line with highest railway speed in Poland. Several other sections of the Central Trunk Line will soon allow speeds of Шаблон:Convert (with a current speed record set up by Pendolino Train on 21 November 2013 in Poland of Шаблон:Convert). According to recent plans of PKP-PLK, sections of CMK between Warsaw and Gdańsk (Шаблон:Convert) and Warsaw-Kraków (additional Шаблон:Convert) will be added to present section from no later than December 2015. That will make about Шаблон:Convert of railways available for speed of Шаблон:Convert. Other sections will start operating at Шаблон:Convert in 2016.

Polish Railways for many years did not possess the rolling stock to achieve speeds over Шаблон:Convert. Polish Railways planned to buy Pendolino trains in 1998, but the contract was cancelled the following year by the Supreme Control Chamber due to financial losses by Polish Railways. However, a new contract with Alstom Transport worth 665 million euros was signed in May 2011 and since December 2014, 20 Pendolino units service the Katowice/Kraków–Gdynia line and Wrocław/Warsaw line. However, Pendolinos in Poland are not equipped with tilting system, which would not be very useful on the flat Polish Plains. The lack of a tilting system for the Pendolino train along with choosing Alstom Transportation despite domestic train producers was a subject of broad debate in media and Polish Railways were heavily criticised for that purchase.

Other current plans call for a 'Y' line that will connect Warsaw, Łódź and Kalisz, with branches to Wrocław and Poznań. The geometric layout of the line will be designed to permit speeds of Шаблон:Convert. Construction was planned to begin around 2014 and finish in 2019. In the centre of the city of Łódź the 'Y' line will travel through a tunnel which will link two existing railway stations. One of them, Łódź Fabryczna, will be reconstructed as an underground station, work being scheduled to start in July 2010.[154] In April 2009, four companies qualified for the second phase of a public tender to prepare a feasibility study for construction of the line. In April 2010, the tender for a feasibility study was awarded to a consortium led by Spanish company Ingenieria IDOM.[155] The feasibility study project was granted €80 million in subsidy from European Union.[156] The total cost of the line including construction and train sets was estimated at €6.9bn and is planned to be financed partially by EU subsidies.[157]

In 2019, the program of the Solidarity Transport Hub (STH) or Central Communication/Transport Port (in Polish Centralny Port Komunikacyjny or CPK) was announced by the Polish government.[158] This project envisages the construction of 2,000 km of high-speed railways as well as upgrades to 3,700 km of existing railways to connect the largest urban areas in Poland and surrounding countries. A new airport in central Poland will serve as the main transport hub for the entire country, with travel time by rail of under 2.5 hours to nearly all major Polish cities.[159][160] The network will also connect Poland to the planned high-speed railway network of the Czech Republic and to Rail Baltica.

In 2020, the speed limit was raised to Шаблон:Convert on the line from Warsaw to Gdynia.[161]

Portugal

Шаблон:Main

Файл:CPA 4009.jpg
An Alfa Pendular train when its current livery was introduced (2017)

Since the 1990s, the Italian tilting train, the Pendolino, runs the Alfa Pendular service, connecting Portugal's mainland from the north border to the Algarve, its southern counterpart, at a speed of up to Шаблон:Convert.

High-speed connections between Spain and Portugal have been agreed upon and planned, but initial works had yet to begin when the projects were cancelled in 2012.[162] The Portuguese government had approved the construction of six high-speed lines from the capital Lisbon to Porto, from Porto to Vigo, from Aveiro to Salamanca, from Lisbon to Faro, from Faro to Seville and from Lisbon to Madrid, bringing the two countries' capital cities within three hours of each other, at a max speed of Шаблон:Convert.[163]

On 8 May 2010, The Portuguese Transport Minister signed off the 40-year PPP covering the construction of the Lisbon–Madrid high-speed line. The total cost was then put at €1.359bn for a double-track standard gauge line from Lisbon to the Spanish border. Also included was a broad gauge line from the Portuguese Port of Sines to the Spanish border. The line was expected to open by the end of 2013 and would reduce the journey time between Lisbon and Madrid to 2 hours 45 minutes,[164] the project however, was cancelled in March 2012.[162] In October 2020 the government proposed a 75-minute rail link between the country's two main cities, Lisbon and Porto.[165] Also, the Atlantic Axis of the Northwestern Peninsula–Eixo Atlântico do Noroeste Peninsular high-speed railway connection between Portugal and Galicia (covering all the main cities between Setúbal-Vigo) was favoured as of 2020.[166]

Line[53] Speed Length Expected start of revenue services
Lisbon-Évora-Spanish border (to Madrid) Шаблон:Convert Шаблон:Convert Évora-Elvas New high-speed line Évora-Elvas (90 km) to be inaugurated in 2024 with Lisbon-Bajadoz service.[167]

Initial project cancelled in 2012,[162] new project Évora-Spanish border announced in 2017.[168]

Lisbon–Porto high-speed rail line Шаблон:Convert Шаблон:Convert Early project cancelled[162] and repurposed in 2020.[165]
PortoSpanish border (to Vigo) Шаблон:Convert Шаблон:Convert Initial project cancelled[162] and repurposed in 2020.

Russia

Шаблон:Main Two experimental high-speed trainsets (designed for Шаблон:Convert operation) were built in 1974: locomotive-hauled RT-200 ("Russkaya Troika") and ER-200 EMU. The RT-200 set made only experimental runs in 1975 and 1980 and was discontinued due to unavailability of the ChS-200 high-speed locomotive – they were only delivered later. The ER-200 EMU was put into regular service in 1984. In 1992 a second ER-200 trainset was built in Riga. Both sets were in operation till 28 February 2009.[169]

Instead of these outdated domestic trainsets, imported trainsets have been in operation since March 2009. Siemens Velaro trainsets have operated since 2009 between Saint Petersburg and Moscow, at speeds of up to Шаблон:Convert and since 2010 between Nizhny Novgorod and Moscow, where service is limited to Шаблон:Convert. The Pendolino Sm6, similar to Finnish high-speed trains, began operation in 2010 between Saint Petersburg and Helsinki at up to Шаблон:Convert.

In February 2010 RZhD announced it would shortly release a proposal for a new high-speed line to be built parallel to the existing line between Saint Petersburg and Moscow due to congestion on the existing line.[170] In April 2010 it was confirmed that a new Moscow–Saint Petersburg high-speed line with length of Шаблон:Convert and running speed of up to Шаблон:Convert was envisioned, cutting the journey time from 3h 45m to 2h 30m. It is expected the line to include stops at both Saint Petersburg and Moscow region airports.[171][172] On 28 January 2011, Russia announced that the high speed rail link between Moscow and Saint Petersburg will be finished on time for the 2018 FIFA World Cup. The cost is expected to be "somewhere around" 10 to 15 billion euros, not including land purchases, said Denis Muratov, general director of High-Speed Rail Lines.[173] The state will shoulder up to 70 percent of construction costs, with the remainder coming from outside investors. Most of that money is likely to come from international financial institutions, including the World Bank and the European Bank for Reconstruction and Development, Muratov said. Sberbank, VTB and VEB may also be interested. In fact, construction of this new Moscow–Saint Petersburg high-speed line didn't start.

Instead of it, on 13 May 2015 the Russian government announced that China Railway Group Ltd will build a Шаблон:Convert high speed rail link from Moscow to Kazan by 2018 in time for the 2018 FIFA World Cup where Kazan is one of the cities that will host some of the football matches. The cost of the Moscow–Kazan link is estimated at $21.4 billion. Train travel from Moscow to Kazan, the capital of the Republic of Tatarstan, will be shortened to just 3.5 hours instead of the more than 14 hours that it takes now.Шаблон:Citation needed The opening date was later changed to 2020.Шаблон:Citation needed

Line Speed Length Expected start of revenue services
Moscow–KazanШаблон:Citation needed Шаблон:Convert Шаблон:Convert (Шаблон:Convert initial section) 2020 (postponed after crisis)

In development

Cross border

Countries Line Speed (km/h) Length Construction start year Expected start of revenue services
Austria/Italy Brenner Base Tunnel Шаблон:Convert Шаблон:Cvt 2006 2032
Finland/Russia/Norway Arctic Railway Шаблон:Cvt 2025+ 2030+
Germany/Switzerland Karlsruhe–Basel high-speed railway Шаблон:Cvt 1987 1993–2030
Germany/Czech Republic Шаблон:Ill Шаблон:Cvt Шаблон:Cvt+ 2025 2030–2035
Germany/Denmark Fehmarn Belt Fixed Link Шаблон:Convert Шаблон:Cvt 2021 2029
Sweden/Denmark HH Tunnel Шаблон:Cvt Unknown 2040 (guess)
Portugal/Spain Lisbon–Madrid high-speed rail line[53] Шаблон:Convert Шаблон:Cvt Cancelled[162]
Estonia/Latvia/Lithuania Rail Baltica Шаблон:Convert Шаблон:Cvt 2018 2023–2026
Estonia/Finland Helsinki-Tallinn Tunnel Undecided Шаблон:Cvt 2025 (estimate) 2040 (guess)
United Kingdom/Ireland Celtic Crossing Шаблон:Convert Шаблон:Cvt[174] to Шаблон:Cvt[175] Cancelled[176] 2030+
Portugal/Spain Porto–Vigo high-speed rail line[53] Шаблон:Cvt Cancelled[162]

Country-specific

Шаблон:Import style

Country Line Speed Length Construction began
to begin
Expected start of
revenue services
Austria Koralm Railway Шаблон:Convert Шаблон:Convert 2001 2025
North Railway Шаблон:Convert Шаблон:Convert Unknown 2030 (upgrading)
New Lower Inn Valley railway (extension) Шаблон:Convert Шаблон:Convert Unknown 2030
Belgium Line 25N Шаблон:Convert Шаблон:Convert 2012 2020–2027
Line 50A Шаблон:Convert 2018 Unknown (upgrading)
Line 96N Шаблон:Convert 1997 Unknown (upgrading)
Czech
Republic
Prague–České Budějovice Шаблон:Convert 2020 2023–2026
Praha–Poříčany Шаблон:Convert 2020 2023
Brno–Přerov Шаблон:Convert 2021 2025
Ejpovice Tunnel Шаблон:Convert
(Шаблон:Convert planned)
Шаблон:Convert 2018 2022
Praha–Plzeň Шаблон:Convert 2016 (upgrading) 2026
Praha-Brno-Ostrava Шаблон:Convert Шаблон:Convert 2027 2035
Praha-Beroun Шаблон:Convert Шаблон:Convert 2028 2038
Brno–Breclav Шаблон:Convert Шаблон:Convert 2027 2035
Hradec Králové–Polish Border 2040 2045
Denmark Ringsted-Fehmarn railway Шаблон:Convert Шаблон:Convert 2017 2029
Ringsted-Odense railway (upgrading) Шаблон:Convert 2023 2029
Kavslunde-Odense railway Шаблон:Convert Шаблон:Convert 2023 2028
Germany Rhine Railway Karlsruhe-Rastatt Шаблон:Convert Шаблон:Convert 2013 2026
Rhine Railway Offenburg-Basel Шаблон:Convert Unknown 2030
Kinzig Valley Railway (Hesse) Шаблон:Convert Шаблон:Convert 2007 2021 (upgrading)
Appenweier–Strasbourg railway Шаблон:Convert 2010 2023 (upgrading)
Frankfurt-Manheim Шаблон:Convert Шаблон:Convert 2025 2030
Oberhausen–Arnhem railway Шаблон:Convert Шаблон:Convert 2014 Unknown (upgrading)
Stuttgart–Wendlingen high-speed railway Шаблон:Convert Шаблон:Convert 2014 2025
Ulm-Augsburg high-speed railway (parallel) Шаблон:Convert 2023 2030
Hanau-Gelnhausen high-speed railway Шаблон:Convert Шаблон:Convert 2025 2030
Lübeck–Puttgarden railway Шаблон:Convert Шаблон:Convert 2022 2028 (upgrading)
Lübeck–Hamburg railway Шаблон:Convert 2020 2027 (upgrading)
Berlin–Frankfurt an der Oder Шаблон:Convert Unknown 2027 (upgrading)
Bielefeld–Hannover high-speed railway Шаблон:Convert Шаблон:Convert Unknown 2030
Uelzen–Langwedel railway Шаблон:Convert Шаблон:Convert Unknown 2030
Regensburg–Passau railway Шаблон:Convert 2006 2030
Berlin–Görlitz railway Шаблон:Convert 2023 2027
Wunstorf–Bremen railway Шаблон:Convert Unknown 2030 (upgrading approved)
Stendal–Uelzen railway Шаблон:Convert Unknown 2030
Greece Egnatia Railway Шаблон:Convert Шаблон:Convert Unknown 2028+
route to Albania Шаблон:Convert Unknown Unknown
Hungary Serbian Border-Budapest Шаблон:Convert Шаблон:Convert 2019 2023
Italy Verona–Brenner[20] Шаблон:Convert Шаблон:Cvt Unknown 2025
Tortona–Genoa high-speed railway[20] Шаблон:Convert 2013 2023
Naples–Foggia railway Шаблон:Convert Шаблон:Cvt 2012 2026 (upgrading)
Netherlands Rhine Railway Шаблон:Convert Unknown 2023
Lelylijn Шаблон:Convert Шаблон:Convert Unknown Before 2030
Norway Drammen–Kobbervik Шаблон:Convert Шаблон:Convert 2019 2025
Nykirke-Barkåker Шаблон:Convert 2020 2025
Kleverud-Åkersvika Шаблон:Convert 2022 2027
Poland Y-line Шаблон:Convert Шаблон:Convert 2021 (claimed) 2027-2030+
CMK Północ / PKP rail line 5 Шаблон:Convert 2025+ 2030+
Shortcut in PKP rail line 9 Шаблон:Convert 2020+ 2025+
Portugal Linha do Sul (another section) Шаблон:Cvt Шаблон:Convert 2015 2030
South Axis Шаблон:Convert Шаблон:Convert 2015 2030
High-speed mainline Шаблон:Convert Шаблон:Cvt Unknown 2030
Russia Gor'kovskaya Railway (Moscow - Nizhny Novgorod) Шаблон:Convert Шаблон:Cvt 2021 2024
Spain Mediterranean High Speed Corridor: AndalusiaMurciaValenciaCatalonia–French border[52] Шаблон:Convert +Шаблон:Convert 2016–2020–2030
Madrid–(CáceresMéridaBadajoz)–Lisbon[53] Шаблон:Convert Шаблон:Cvt Unknown
L.A.V. MadridSantander[54] Unknown Unknown Unknown
León–Gijón high-speed rail line Шаблон:Convert Unknown 2009 2020+
Murcia–Almería high-speed rail line Шаблон:Convert Шаблон:Convert Unknown 2026
L.A.V. Burgos–Vitoria-Gasteiz Шаблон:Convert Шаблон:Convert 2009 2023
Basque Y Шаблон:Convert Шаблон:Convert Unknown 2023
Slovakia Devínska Nová Ves-Czech border Шаблон:Convert Шаблон:Convert 2017 2030
Switzerland Jura Foot Railway Шаблон:Convert Unknown (upgrading) 2025–2030
Lausanne–Geneva railway Шаблон:Convert Unknown (upgrading) 2025–2030
Simplon Railway Шаблон:Convert Unknown (upgrading) 2025–2030
United Kingdom High Speed 2 Шаблон:Convert Шаблон:Convert 2017 2031
High Speed 2 (phase 2) Шаблон:Convert 2022 (planned) 2040
Northern Powerhouse Rail Шаблон:Convert Шаблон:Convert 2022 (planned) 2035+
Reading–Taunton line Шаблон:Convert Шаблон:Convert Unknown (proposed) Before 2043
Bristol–Exeter line Шаблон:Convert Before 2043
South West Main Line Шаблон:Convert Before 2043
Coventry–Nuneaton-Leicester lines Шаблон:Convert Before 2036
Crewe–Derby line Шаблон:Convert Before 2036
Waverley Route Unknown Шаблон:Convert Before 2035[177]
Welsh Marches line Шаблон:Convert Шаблон:Convert Before 2036
Romania Bucharest-Cluj Шаблон:Convert Шаблон:Convert 2020 (originally planned 2019) 2025
Iceland Airport Rail Link Шаблон:Convert Шаблон:Convert 2022 (planned)[178] 2025
Finland Helsinki–Turku high-speed railway Шаблон:Convert Шаблон:Convert (planned) 2031
East Rail Connection Шаблон:Cvt (planned) 2027+
Sweden North Bothnia Line Шаблон:Convert Шаблон:Cvt 2016 2028
Götalandsbanan Шаблон:Cvt Шаблон:Cvt 2017 (delayed) 2024–2030
East Link Project Шаблон:Convert Шаблон:Cvt 2017 (delayed) 2033–2036
Örebro–Kolbäck Шаблон:Convert Шаблон:Convert Unknown 2036
Ukraine Polish border-Lviv-Kyiv-Odesa Шаблон:Convert Шаблон:Convert 2021 (claimed) 2030
Ireland Dublin-Cork Railway Шаблон:Cvt Шаблон:Cvt Early 2000s 2023+
France LGV Bordeaux–Toulouse Шаблон:Convert Шаблон:Cvt 2019 (planned) 2032
LGV Bordeaux–Espagne (Dax to border) Шаблон:Convert Unknown 2034
LGV Montpellier–Perpignan Шаблон:Cvt 2021 (planned) 2027+
Ligne nouvelle Paris-Normandie Шаблон:Convert Шаблон:Cvt 2027 (approved) 2035+

See also

References

Шаблон:Reflist

External links

Шаблон:Wikivoyage

Шаблон:High-speed rail Шаблон:High-speed railway lines

  1. Шаблон:Cite web
  2. Шаблон:Cite news Шаблон:Dead link
  3. 3,0 3,1 3,2 Шаблон:Cite web
  4. Шаблон:Cite journal
  5. Шаблон:Cite journal
  6. Шаблон:Cite report
  7. Шаблон:Cite book
  8. Шаблон:Cite journal
  9. Шаблон:Cite web
  10. Шаблон:Cite news
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. Шаблон:Cite web
  14. Шаблон:Cite magazine
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite web
  18. Шаблон:Cite news
  19. Шаблон:Cite web
  20. 20,0 20,1 20,2 Шаблон:Cite web
  21. Шаблон:Cite web
  22. Шаблон:Cite web
  23. Шаблон:Cite web
  24. Шаблон:Cite journal
  25. Шаблон:Cite web
  26. Шаблон:Cite web
  27. Шаблон:Cite web
  28. Шаблон:Cite web
  29. Шаблон:Cite news
  30. Шаблон:Cite web
  31. 31,0 31,1 Шаблон:Cite web
  32. Шаблон:Cite web
  33. Шаблон:Cite web
  34. Шаблон:Cite news
  35. Шаблон:Cite web
  36. Шаблон:Cite news
  37. Шаблон:Cite web
  38. Шаблон:Cite web
  39. Шаблон:Cite web
  40. Шаблон:Cite news
  41. Шаблон:Cite news
  42. Шаблон:Cite web
  43. Шаблон:Cite web
  44. Шаблон:Cite web
  45. Шаблон:Cite web
  46. 46,0 46,1 46,2 Шаблон:Cite web
  47. Шаблон:Cite web
  48. Шаблон:Cite web
  49. Шаблон:Cite web
  50. Шаблон:Cite web
  51. Шаблон:Cite news
  52. 52,0 52,1 Шаблон:Cite news
  53. 53,0 53,1 53,2 53,3 53,4 Шаблон:Cite web
  54. 54,0 54,1 Шаблон:Cite web
  55. Шаблон:Cite web
  56. Шаблон:Cite web
  57. Шаблон:Cite web
  58. Шаблон:Cite web
  59. Шаблон:Cite web
  60. Шаблон:Cite web
  61. Шаблон:Cite web
  62. Шаблон:Cite web
  63. Шаблон:Cite web
  64. Шаблон:Cite magazine
  65. Шаблон:Cite web
  66. Шаблон:Cite web
  67. Шаблон:Cite web
  68. Шаблон:Cite web
  69. Шаблон:Cite book
  70. Шаблон:Cite news
  71. Шаблон:Cite news
  72. Шаблон:Cite news
  73. Шаблон:Cite web
  74. Шаблон:Cite news
  75. Шаблон:Cite news
  76. Шаблон:Cite web
  77. Шаблон:Cite web
  78. Шаблон:Cite web
  79. Шаблон:Cite web
  80. Шаблон:Cite news
  81. Шаблон:Cite news
  82. 82,00 82,01 82,02 82,03 82,04 82,05 82,06 82,07 82,08 82,09 82,10 82,11 82,12 82,13 82,14 82,15 Шаблон:Cite web
  83. Шаблон:Cite web
  84. Шаблон:Cite web
  85. Brenner Base Tunnel Delayed Modern Railways issue 874 July 2021 page 80
  86. Шаблон:Cite web
  87. Шаблон:Cite web
  88. Шаблон:Cite web
  89. Шаблон:Cite web
  90. Шаблон:Cite news
  91. Шаблон:Cite news
  92. Шаблон:Cite web
  93. Шаблон:Cite web
  94. Шаблон:Cite web
  95. Шаблон:Cite web
  96. Шаблон:Cite web
  97. Шаблон:Cite web
  98. Шаблон:Cite web
  99. Шаблон:Cite web
  100. Шаблон:Cite web
  101. Шаблон:Cite web
  102. Шаблон:Cite web
  103. Шаблон:Cite web
  104. Шаблон:Cite web
  105. Шаблон:Cite web
  106. Шаблон:Cite web
  107. Шаблон:Cite web
  108. Шаблон:Cite web
  109. Шаблон:Cite web
  110. Шаблон:Cite web
  111. Шаблон:Cite web
  112. Шаблон:Cite web
  113. Шаблон:Cite web
  114. Шаблон:Cite web
  115. Шаблон:Cite web
  116. Шаблон:Cite web
  117. Шаблон:Cite web Шаблон:Dead link
  118. Шаблон:Cite web
  119. Шаблон:Cite web
  120. Шаблон:Cite news
  121. Шаблон:Cite web
  122. Шаблон:Cite web
  123. Шаблон:Cite web
  124. 124,0 124,1 Шаблон:Cite web
  125. 125,0 125,1 Шаблон:Cite news
  126. Шаблон:Cite news
  127. 127,0 127,1 Шаблон:Cite web
  128. Шаблон:Cite news
  129. Шаблон:Cite news
  130. Шаблон:Cite web
  131. Шаблон:Cite web
  132. Шаблон:Cite web
  133. Шаблон:Cite web
  134. Шаблон:Cite web
  135. 135,0 135,1 135,2 135,3 Шаблон:Cite web
  136. Шаблон:Cite web
  137. Шаблон:Cite web
  138. Шаблон:Cite web
  139. Шаблон:Cite web
  140. Шаблон:Cite web
  141. Шаблон:Cite web
  142. Шаблон:Cite web
  143. Шаблон:Cite web
  144. Шаблон:Cite web
  145. Шаблон:Cite web
  146. Шаблон:Cite web
  147. Шаблон:Cite web
  148. Шаблон:Cite journal
  149. Шаблон:Cite web
  150. Шаблон:Cite web
  151. Шаблон:Cite web
  152. Шаблон:Cite web
  153. Шаблон:Cite web
  154. Шаблон:Cite web
  155. Шаблон:Cite news
  156. Шаблон:Cite web
  157. Шаблон:Cite web
  158. Шаблон:Cite web
  159. Шаблон:Cite web
  160. Шаблон:Cite web
  161. Шаблон:Cite web
  162. 162,0 162,1 162,2 162,3 162,4 162,5 162,6 Шаблон:Cite web
  163. Шаблон:Cite web
  164. Шаблон:Cite web
  165. 165,0 165,1 Шаблон:Cite web
  166. Шаблон:Cite web
  167. "Portugal confirma alta velocidade entre Badajoz e Lisboa em 2024" ("Portugal confirms high speed between Badajoz and Lisbon in 2024"), 16 March 2023.
  168. Шаблон:Cite journal.
  169. Шаблон:Cite web
  170. Шаблон:Cite web
  171. Шаблон:Cite web
  172. Шаблон:Cite web
  173. Шаблон:Cite web
  174. Шаблон:Cite magazine
  175. Шаблон:Cite web
  176. Шаблон:Cite news
  177. Шаблон:Cite web
  178. Шаблон:Cite web
  179. Шаблон:Cite web
  180. Шаблон:Cite web