Шаблон:Short description Шаблон:Multiple image High-speed rail in Italy consists of two lines connecting most of the country's major cities. The first line connects Turin to Salerno via Milan, Bologna, Florence, Rome and Naples, the second runs from Turin to Venice via Milan and Verona, and is under construction in parts.[1] Trains are operated with a top speed of Шаблон:Convert.

Passenger service is provided by Trenitalia and, since April 2012, by NTV, the world's first private open-access operator of high-speed rail to compete with a state-owned monopoly. 25 million passengers traveled on the network in 2011.[2] In 2015, ridership increased to 55 million for Trenitalia[3] and 9.1 million for NTV,[4] for a combined 64 million passengers.

History

Шаблон:Image frame The Direttissima opened in 1977 as the first high-speed rail route in Italy and Europe, connecting Rome with Florence. The top speed on the line was Шаблон:Convert, giving an end-to-end journey time of about 90 minutes with an average speed of Шаблон:Convert. This line used a 3 kV DC supply.

High-speed service was introduced on the Rome-Milan line in 1988–89 with the ETR 450 Pendolino train, with a top speed of Шаблон:Convert and cutting travel times from about 5 hours to 4.[5] The prototype train ETR X 500 was the first Italian train to reach Шаблон:Convert on the Direttissima on 25 May 1989.[5]

The Italian high-speed rail projects suffered from a number of cost overruns and delays. Corruption and unethical behaviour played a key role.[6]

In November 2018, the first high-speed freight rail in the world commenced service in Italy. The ETR 500 Mercitalia Fast train carries freight between Caserta and Bologna in 3 hours and 30 minutes, at an average speed of Шаблон:Convert.[7][8]

Rolling stock

Шаблон:See also Service on the high speed lines is provided by Trenitalia and the privately owned NTV. Several types of high-speed trains carry out the service:

Current limitations on the tracks set the maximum operating speed of the trains at Шаблон:Convert after plans for Шаблон:Convert operations were cancelled.[10] Development of the ETR 1000 by AnsaldoBreda and Bombardier Transportation (which is designed to operate commercially at Шаблон:Convert, with a technical top speed of over Шаблон:Convert, is proceeding, with Rete Ferroviaria Italiana working on the necessary updates to allow trains to speed up to Шаблон:Convert. On 28 May 2018, the Ministry for Infrastructures and Transportation and the National Association for Railway Safety decided not to run the Шаблон:Convert tests required to allow commercial operation at Шаблон:Convert, thus limiting the maximum commercial speed on the existing Italian high-speed lines to Шаблон:Convert and cancelling the project.[11][12]

TGV trains also run on the Paris-Turin-Milan service, but do not use any high-speed line in Italy.[13]

Network

Файл:Italy TAV.png
Italy's high speed rail network

The following high-speed rail lines are in use.

Line Length
km
Opening Travel time Top speed
km/h
Voltage
Florence–Rome "Direttissima" 254 24 February 1977 / 26 May 1992 1:18 250[14] 3 kV DC
Rome–Naples 205 19 December 2005 / 13 December 2009 1:08 300[14] 25 kV 50 Hz
Turin–Milan 125 10 February 2006 (Turin-Novara)
13 December 2009 (Novara-Milan)
0:44 300[14] 25 kV 50 Hz
PaduaVenice (Mestre) 25 1 March 2007 0:14 220[14] 3 kV DC
Milan–Verona (partly under construction) 67[1] 10 June 2007 (Milano-Treviglio)
11 December 2016 (Treviglio-Brescia)
0:36 200 (Milano-Treviglio) [14]
300 (Treviglio-Brescia)
3 kV DC

25 kV 50 Hz

Naples-Salerno "via Linea Monte Vesuvio" (L.M.V.) 29 15 April 2008 0:30 250[14] 3 kV DC
Milan–Bologna 215 13 December 2008[15] 0:53 300[14] 25 kV 50 Hz
Bologna–Florence 79 5 December 2009 0:35 300[14] 25 kV 50 Hz
Total 974

The table shows minimum and maximum (depending on stops) travel times.[16]

Bologna Florence Milan Naples Rome Turin
Bologna - 0:35 0:53 3:15 (3:35) 1:54 (2:03) 2:02
Florence 0:35 - 1:31 2:31 (2:51) 1:18 (1:45) 2:38
Milan 0:53 1:31 - 3:50 (4:18) 2:40 (3:08) 0:44 (1:00)
Naples 3:15 (3:35) 2:31 (2:51) 3:50 (4:18) - 1:08 5:00 (5:25)
Rome 1:54 (2:35) 1:18 (1:45) 2:40 (3:08) 1:08 - 3:48
Turin 2:02 2:38 0:44 (1:00) 5:00 (5:25) 3:48 -

Milan to Salerno Corridor

The Milan to Salerno is the major north–south corridor of the high-speed network.

The Milan–Bologna segment opened on 13 December 2008. Its construction cost was about 6.9 billion euro. The Шаблон:Convert line runs parallel to the Autostrada del Sole, crossing seven provinces and 32 municipalities. There are eight connections with historic lines. At the Reggio Emilia interconnection a new station designed by the Valencian architect Santiago Calatrava was opened in June 2013. Calatrava has also designed a signature bridge where the line crosses the A1 motorway. The line travels through a new multi-level station at Bologna (Italy's principal railway junction) designed by Japanese architect Arata Isozaki.

Файл:FS ETR500-brandAV.jpg
An ETR 500 AV at Milano Centrale railway station. The version ETR 500 Y1 achieved 362 km/h on the Bologna-Florence line on 4 February 2009, a new world speed record in a tunnel.[17]

The Bologna–Florence segment opened on 12 December 2009, allowing a 37-minute journey between the two cities. The Bologna-Florence high-speed section was particularly complex to build mainly because about 93% of its Шаблон:Convert runs through tunnels under the Apennines mountain range. The line has nine tunnels, from 600 meters to Шаблон:Convert long, separated by short surface stretches (less than Шаблон:Convert in total). Florence will have a major new multi-level high speed station at Belfiore designed by British architect Norman Foster.

The Florence–Rome segment consists of the older "Direttissima" (literally: most direct) line between the two cities, with a length of Шаблон:Convert. The first high-speed line in Europe, the "Direttissima" was completed in between 1977 and 1992. This segment is being upgraded by Rete Ferroviaria Italiana. Entering Rome, high-speed trains have the option of stopping at either the new intermodal station at Tiburtina, developed by architects ABD Associate led by Paolo Desideri, or Termini station.

The Rome-Naples segment heads south from the Italian capital. Service on the first new high speed segment of the project started in December 2005. This line runs through 61 municipalities in two regions (Lazio and Campania) and connects with the existing national rail network at Frosinone Nord, Cassino Sud and Caserta Nord. On 13 December 2009, work was completed on the last Шаблон:Convert of the line between Gricignano and Napoli Centrale. In the Campania region, the line passes through Afragola where a major new transfer station has been built, designed by Iraqi-born architect Zaha Hadid.

Turin to Trieste Corridor

The Turin to Novara segment of the Turin to Trieste corridor runs for Шаблон:Convert and opened in February 2006. The Novara to Milan segment opened on 12 December 2009, allowing a 59-minute journey between Milan Centrale and Turin Porta Nuova (45 minutes from Milan Porta Garibaldi to Turin Porta Susa). Combined, the two segments are Шаблон:Convert long, 80% (Шаблон:Convert) of which are in the region of Piemonte (provinces of Turin, Vercelli and Novara) and 20% (Шаблон:Convert in the region of Lombardy (province of Milan). To minimize its environmental impact on the area, almost the entire length of the Turin to Milan high-speed line was constructed parallel to the A4 Turin-Milan motorway.

The Milan to Venice segment includes stretches from Padova to Mestre (for Venice), in service since March 2007,[18] and Milan to Brescia, which runs alongside the A35 motorway and opened for service on 11 December 2016.[19] Between Brescia and Verona the new high-speed line will parallel the A4 motorway for 30 of its Шаблон:Convert, and a 7.4-km tunnel will be constructed at Lonato del Garda.[20] This section is due for completion in 2023.[21] The final Шаблон:Convert stretch between Verona and Padua will be constructed by quadrupling the existing railway. The contract for this was let in August 2020 with completion scheduled for 2027.[22] The section between Verona and Vicenza is to be constructed first.[23]

Ports and Trans-European Connections

Шаблон:Unreferenced section A new line connecting Milan to the port of Genoa is now in development and further expansion of the trans-Alpine lines will integrate the Italian network with the European networks planned by the EU and the large intermodal Pan-European transport corridors.

The objective of the new Alpine rail links is to increase rail transport, aimed mainly at supporting the forecast development of freight transport on international lines, complete interoperability between European high-speed rail networks, the shift from road to rail of a large percentage of freight for modal rebalancing, higher safety levels in tunnels as specified in the new European technology and construction standards.

Planned engineering works include the construction of new international lines and the upgrading of existing Italian track on the following lines:

Lines under construction

Milan–Genoa

Шаблон:Main A line from Milan to Genoa was approved in 2006 at €6.2 billion; construction work started in 2011.[24] Work between Genoa and Tortona was temporarily halted due to funding problems, but restarted in 2019 and now is expected to be completed by 2026.[25]

Milan–Venice

Шаблон:See also On the line from Milan to Venice high speed trains still have to use the conventional line between Brescia and Padua. The remaining portion from Brescia to Padua is under construction at a cost of €2.5 billion, while the rest of the line is already in operation. The section between Brescia and Verona will be completed in 2023 while construction should finish on the section between Verona and Padua in 2027, including a 7.7 kilometer tunnel between Lonato del Garda and Desenzano del Garda.[26]

Naples–Bari

The construction of the line from Naples to Bari began in 2015[27] and will cut Naples–Bari journeys from four to two hours.[28] Totaling €6.2 billion for the whole project, the final €2.1 billion needed to complete the project was approved in 2019.[26] The completion of the line is projected for 2027.[28]

Palermo–Catania

Palermo and Catania, Sicily's largest cities, are currently connected by a double-track railway which is limited to a single-track section between Catenanuova and Bicocca (near Catania). This requires trains to stop and wait for the train from the opposite direction to pass. The first step to improving this line is doubling this single-track section of 38 kilometers. This will enable a higher maximum speed of Шаблон:Cvt compared to the current Шаблон:Cvt.[29] Construction started in 2019 at a cost of €415 million. The work on both tracks is expected to finish in 2023. Eventually, further improvements as part of the entire €8 billion project will enable a maximum speed of Шаблон:Cvt on the line.[30] The upgrade of the line will reduce the journey time between Palermo and Catania to one hour and 45 minutes in 2025, saving one hour.[31]

Turin–Lyon

Шаблон:Main The Turin–Lyon line should connect Turin, Lyon and Chambéry, and join the Italian and the French high speed rail networks. It would take over the role of the current Fréjus railway. The project costs €26 billion, with the Mont d'Ambin Base Tunnel, a 57.5 kilometer trans-alpine tunnel between Italy and France, costing €18.3 billion.[32] Although the plan was highly controversial, the Italian senate approved funding in mid-2019,[33] with the project tentatively due to be completed in 2032.[34][35]

Verona–Innsbruck

The Brenner Base Tunnel will link Verona, Innsbruck, and Munich, and thus connect the Italian, Austrian and German railways. The tunnel is the most important link in a series of projects that will create a single connection from Berlin in Germany to Palermo in Sicily as part of the Trans-European Transport Networks. The tunnel crosses the border between Innsbruck in Austria and Franzensfeste in Italy. The total costs of the tunnel are estimated at €8.4 billion, of which 40% is co-financed in equal measure by Italy and Austria and 50% by the European Union.[36] As of 2020, half of the tunnel's length has been excavated[37] and it is due to be opened in 2032.[38]

A new high speed line between Verona and Fortezza is constructed on the Italian side and is about 180 kilometers long. The line will have a design speed of 200–250 kilometers and will quadruple the current two tracks of the existing low speed line. It has been budgeted at approximately €5 billion and is expected to be completed by the end of the works on the Brenner Base Tunnel.[36]

Lines planned

Salerno–Reggio Calabria

A line from Salerno to Reggio Calabria is currently in the planning stage. It is expected to be operational by 2030.[39] The new line will be 445 kilometers long and cost €22.8 billion. It will reduce the travel time from Rome to Reggio Calabria to three hours and forty minutes. This compares to five hours of current travel time for the existing railway between Salerno and Reggio Calabria, excluding the section between Rome and Salerno.[40]

The project is divided into seven functional lots:[40]

  1. Salerno-Battipaglia
  2. Battipaglia-Praia a Mare
  3. Praja a Mare-Tarsia
  4. Tarsia-Montalto Uffugo
  5. Montalto Uffugo-Lamezia Terme
  6. Lamezia Terme-Gioia Tauro
  7. Gioia Tauro-Reggio Calabria

See also

Шаблон:Portal

Further reading

  • Binari dal Tevere all'Arno. La nuova linea direttissima Roma-Firenze, Roma, Ufficio relazioni aziendali delle Ferrovie dello Stato, 1974
  • La Direttissima Roma-Firenze, in Ingegneria ferroviaria, gennaio 1978
  • Azienda autonoma Ferrovie dello Stato, Direttissima Roma-Firenze, Roma, Ufficio relazioni aziendali delle Ferrovie dello Stato, 1978
  • La Direttissima Roma-Firenze, in Ingegneria ferroviaria, marzo 1991
  • Giampaolo Mancini, Donato Carillo, Mauro Papi, Prove a 320 km/h dell'ETR 500 Politensione, in Ingegneria ferroviaria, 56 (2001), n. 8, pp. 513–519
  • Bruno Cirillo, Paolo Comastri, Pier Luigi Guida, Antonio Ventimiglia, L'Alta Velocità ferroviaria, Roma, Collegio Ingegneri Ferroviari Italiani, 2009, Шаблон:ISBN,

External links

References

Шаблон:Reflist

Шаблон:High-speed rail

  1. 1,0 1,1 Шаблон:Cite news
  2. Шаблон:Cite web
  3. Шаблон:Cite news
  4. Шаблон:Cite web
  5. 5,0 5,1 Шаблон:Cite web
  6. Шаблон:Cite journal
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. Marco Morino: All'Expo con il Frecciarossa 1000 Il Sole 24 Ore, 7 August 2014
  10. Шаблон:Cite web
  11. Шаблон:Cite web
  12. Lucio Cillis: [1] Repubblica Affari e Finanza, 2018-05-28
  13. Substantial travel time differences between the French TGV (around 80 minutes) and Italian high speed trains (around 50 minutes) (Both non-stop times). This time difference of 30 minutes can only be caused by the TGV taking the slower classic route. The fast regional trains who do not take the high speed take only slightly a bit longer, but they have more stops. There is one TGV that stops in Novara with only marginal extra time. It is not possible to stop in Novara without using the Novara - Milan old classic line. Consulted 2017 and 2016 timetables.
  14. 14,0 14,1 14,2 14,3 14,4 14,5 14,6 14,7 see Fascicoli Circolazione Linee links in [2] for technical data of RFI (Rete Ferroviaria Italiana) lines
  15. Reuters Italy launches Milan-Bologna high speed train link December 13, 2008
  16. The table is based on Trenitalia timetables (2011)
  17. Шаблон:Cite web
  18. Шаблон:Cite web
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. Шаблон:Cite web
  22. Шаблон:Cite web
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite web
  26. 26,0 26,1 Шаблон:Cite web
  27. Шаблон:Cite web
  28. 28,0 28,1 Шаблон:Cite web
  29. Шаблон:Cite web
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite web
  33. Шаблон:Cite web
  34. Шаблон:Cite web
  35. Шаблон:Cite web
  36. 36,0 36,1 Шаблон:Cite web
  37. Шаблон:Cite web
  38. Шаблон:Cite web
  39. Шаблон:Cite web
  40. 40,0 40,1 Шаблон:Cite web