Английская Википедия:Hitchin railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use British English Шаблон:Use dmy dates Шаблон:Infobox station

Файл:Hitchin Railway Station front.jpg
The front entrance to the station in 2017
Файл:Hitchin railway station geograph-2206783.jpg
Auto-train to Bedford in 1955
Файл:Hitchin railway station geograph-2178472-by-Ben-Brooksbank.jpg
Double-headed train of bricks off Bedford line in 1957
Файл:Dunstable, Hertford, Hitchin & St Albans RJD 35.jpg
A 1902 Railway Clearing House map of railways in the vicinity of Hitchin (right)

Hitchin railway station serves the market town of Hitchin in Hertfordshire. It is located approximately Шаблон:Convert north east of the town centre and Шаблон:Convert north of London King's Cross on the East Coast Main Line.[1]

Until the current Stevenage station opened in 1973, many Intercity services stopped at Hitchin.

In August 2007 Hitchin was awarded Secure Station status after improvements to station security were made by First Capital Connect, including new lighting, extra CCTV and the installation of automatic ticket gates.

History

The first section of the Great Northern Railway (GNR) - that from Шаблон:Stnlnk to a junction with the Manchester, Sheffield and Lincolnshire Railway at Grimsby - opened on 1 March 1848, but the southern section of the main line, between Шаблон:Stnlnk and Шаблон:Stnlnk, was not opened until August 1850. Hitchin was one of the original stations, opening with the line on 7 August 1850.[2][3][4]

On 21 October 1850 Hitchin became a junction station with the opening of the first section of the Royston and Hitchin Railway, between Hitchin and Шаблон:Stnlnk (it was extended to Шаблон:Stnlnk on 3 August 1851).[5] The Midland Railway (MR) opened a route from Шаблон:Stnlnk via Шаблон:Stnlnk to Hitchin on 1 February 1858, by which MR trains used the GNR to reach London.[6]

After the opening of the Midland Railway's own line from Bedford via Шаблон:Stnlnk to London, and the line's terminus at Шаблон:Stnlnk in 1868, their line between Bedford and Hitchin was reduced to branch status. It lost its passenger service in 1961 and was closed completely in 1964, with the exception of a stub from Bedford to Cardington which itself was closed in 1969. In May 1964 part of the line was used for the railway scene in the film Those Magnificent Men in their Flying Machines.[7] The embankment for the line could, until early 2012, still be walked from just north of the station, through the fields to Ickleford, but this section is now closed off. Opened in June 2013 a new embankment now carries a single-track line onto a viaduct for Letchworth-bound trains over the East Coast Main Line as part of the Hitchin Flyover project.[8]

Accidents and incidents

  • On 14 April 1949, the solicitor and historian Reginald Hine died by suicide here by jumping in front of the slow train from Cambridge.[9][10]
  • On 19 November 1958, a freight train, hauled by BR Standard Class 9F 2-10-0 No. 92187, overran signals and was in a rear-end collision with another. A third freight train ran into the wreckage.[11]

Facilities

Шаблон:First Capital Connect services There are platforms on only the two 'Slow' lines; they are long enough for 12-car trains.

Following a refurbishment of the station by First Capital Connect in 2007, the station's subway was refurbished at a cost of £300k.[12] The refurbishment also involved general cosmetic work throughout the station and a new high quality waiting room in the existing station buildings on Platform 2. This waiting room is fully accessible at all times through automatic doors.

The station has a large booking office with touch-screen ticket machines. The station has help points throughout.

A small shop is located by the stairs on Platform 2 and there are vending machines throughout the station.

Automatic ticket gates at the station entrance were installed by First Capital Connect during 2007.

The station's bicycle facilities were completely upgraded in 2007 and now include sheltered spaces for 68 bicycles next to the station buildings.

In 2013, Network Rail proposed plans for new lifts, one on each platform, to improve access via the existing subway for those with pushchairs or disabilities, funded through the Department for Transport's Access for All scheme.[13] The new lifts opened in September 2014 after a two-month delay, giving step-free access to the southbound number 1 platform.[14]

Platforms and services

Platforms

Hitchin railway station is managed by Great Northern and has two platforms situated on the slow lines. Platform 2 is used for trains towards Peterborough and Cambridge. Platform 1 is used for trains towards London and Brighton and a few starting/terminating services from London. Platform 1 also provides access to the sidings, used for removing stone and scrap metal.

Current services

All services at Hitchin are operated by Thameslink using Шаблон:Brc EMUs.

The typical off-peak service in trains per hour is:[15]

On Sundays, the services between Brighton are reduced to hourly, with the service to Horsham not operating.

Future services

It is proposed that a two trains per hour service from Cambridge to Шаблон:Stnlnk via Шаблон:Stnlnk and Шаблон:Stnlnk will begin operating once the Thameslink Programme is fully complete.[16] This would see the existing Cambridge to London service extended through the Thameslink Core and down to Maidstone.

It was initially proposed that this service would run to Шаблон:Stnlnk.[17] However this proposal was cancelled and replaced with the Maidstone East service.

This service was due to commence in December 2019 but has now been postponed to an unknown date.[18]

Шаблон:Rail start Шаблон:S-rail-national Шаблон:S-rail-national Шаблон:Disused Rail Insert Шаблон:S-rail-national Шаблон:Historical Rail Insert Шаблон:S-rail-national Шаблон:End

Junction development

Шаблон:Main Down trains from London to Cambridge used to use a ladder crossing over the up lines in order to reach the Cambridge Line, which often caused significant delays to trains in both directions. Together with the Digswell Viaduct some Шаблон:Convert to the south, the flat junction just north of Hitchin was a major bottleneck.[19]

In June 2013 Network Rail completed a flyover to carry Down trains to Cambridge over the top of the main line,[20] built at a final cost of £47million [21]

References

Шаблон:Reflist

External links

Шаблон:Stn art lnk

Шаблон:Coord

Шаблон:Great Northern Route Шаблон:Hertfordshire railway stations Шаблон:TSGN and SE Stations