Английская Википедия:Holyhead railway station
Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station Holyhead railway station (Шаблон:Lang-cy) serves the Welsh town of Holyhead (Шаблон:Lang-cy) on Holy Island, Anglesey. The station is the western terminus of the North Wales Coast Line Шаблон:Convert west of Шаблон:Rws and is managed by Transport for Wales Rail. It connects with the Port of Holyhead ferry terminal. The station is connected to the town centre by a stainless steel pedestrian/cycle bridge named The Celtic Gateway (Шаблон:Lang-cy).
History
The first station in Holyhead was opened by the Chester and Holyhead Railway on 1 August 1848, but this was replaced by the second on 15 May 1851.[1]
The present station was opened by the London and North Western Railway on 17 January 1866[1] and still retains its overall roof. It is believed to be the longest train shed in Wales.[2] It originally had four platforms, but only three are currently in use, the track to the former platform three having been lifted. The station approach contains a Grade II listed clock turret[3] which was unveiled on 17 June 1878 by Albert Edward, Prince of Wales to mark completion of old harbour extension. The clock is by J. B. Joyce & Co of Whitchurch.
Platform one on the western side of the station is separated from the other two by the ferry terminal buildings and inner harbour and is the one normally used by Avanti West Coast services to London Euston. Most Transport for Wales DMU services use platform two. Platform three is outside the train shed and is used by the early morning Premier Service to Cardiff Central, plus a few other trains at busy periods. There are carriage sidings and servicing facilities alongside platform one, whilst platform three also has an engine release line & run-round loop available.
A rail-served container terminal next to the station closed in 1991 when the traffic transferred to Liverpool.[4] It has since been demolished and is now used as a car parking area for the Stena Line ferry service.[5]
Passenger ships previously used to berth in the inner harbour next to Platform 1, this ceased when the port was re-developed. Stena Line built an administration building between platforms 1 and 2 in the early 1990s.
Stationmasters
- Charles Massingberd 1848 - 1879[6]
- William Guest 1879 - 1906[7]
- Joseph Jones until 1912[8] (afterwards station master at London Euston)
- Andrew William Taylor 1912[9] - 1913 (formerly station master at Flint, afterwards station master at Wigan)
- Hugh Morgan 1913 - 1936[10]
- H.W. Smith 1936 - 1942 [11]
Facilities
The station is fully staffed, with the ticket office in the main ferry terminal being staffed seven days a week. Self-service ticket machines are also provided. The terminal offers covered waiting accommodation, a payphone, a photo booth, a left luggage office, toilets, shops, and a cafe. Train running details are offered via digital information screens, timetable posters and automated announcements. Step-free access is available to all platforms.[12]
Services
Holyhead is served by a basic Transport for Wales hourly service throughout the week (although less frequently on winter Sundays) to Шаблон:Rws with services continuing to Шаблон:Rws and Шаблон:Rws on alternate hours. A limited number of trains (mostly early morning and late evening) run to/from Crewe, whilst two services operate to Manchester Piccadilly on weekdays only. On Sundays, most services run to/from Шаблон:Rws, with a limited number of trains to Birmingham, Cardiff and Manchester.[13]
Avanti West Coast operate services to London Euston and Crewe via the West Coast Main Line. On weekdays, there are 4 trains per day to London Euston, as well as 3 trains per day which run only as far as Crewe. On Saturdays, there are 3 trains per day to London Euston and 1 train to Crewe, and on Sundays there are 3 trains per day to London Euston.[14]
Holyhead station adjoins the Port of Holyhead, where sailings to Dublin are operated by Irish Ferries and Stena Line. Up to September 2014 Stena Line operated a high-speed service to Dún Laoghaire, a suburb 12km south of Dublin City Centre.
Шаблон:S-rail-start Шаблон:S-rail Шаблон:S-rail-national Шаблон:S-rail-national Шаблон:S-rail-national Шаблон:Ferry Insert Шаблон:Rail line Шаблон:Rail line Шаблон:S-end
References
Further reading
External links
Шаблон:Commons category Шаблон:Stn art lrnk
Шаблон:Anglesey railway stations Шаблон:Railway lines in Wales Шаблон:UK International Rail stations Шаблон:Railway stations served by Avanti West Coast Шаблон:Railway stations served by Transport for Wales
- ↑ 1,0 1,1 Шаблон:Cite book
- ↑ Ошибка цитирования Неверный тег
<ref>
; для сносокnhaw
не указан текст - ↑ Шаблон:NHAW
- ↑ Holyhead, 23 December 1980 www.2D53.co.uk; Retrieved 2013-08-05
- ↑ Freightliners to Holyhead 1971 - 1991 www.penmorfa.com; Retrieved 2013-08-05
- ↑ Шаблон:Cite journal
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Holyhead station facilities National Rail Enquiries; Retrieved 14 March 2017
- ↑ GB eNRT May 2019 Edition, Table 81
- ↑ Шаблон:Cite web
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Railway stations in Anglesey
- DfT Category E stations
- Former London and North Western Railway stations
- Railway stations in Great Britain opened in 1848
- Railway stations in Great Britain closed in 1851
- Railway stations in Great Britain opened in 1851
- Railway stations in Great Britain closed in 1866
- Railway stations in Great Britain opened in 1866
- Railway stations served by Transport for Wales Rail
- Railway stations served by Avanti West Coast
- Railway stations serving harbours and ports in the United Kingdom
- Holyhead
- 1866 establishments in Wales
- Grade II listed buildings in Anglesey
- Stations on the West Coast Main Line
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии
- Страницы с ошибками в примечаниях