Английская Википедия:Hong Kong West Kowloon railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Update Шаблон:Short description Шаблон:Distinguish Шаблон:Use dmy dates Шаблон:Use Hong Kong English Шаблон:Infobox station West Kowloon station[1] (abbreviated WEK), also known as Hong Kong West Kowloon,[2] is the southern terminus of and the only station on the Hong Kong section of the Guangshengang XRL. The station connects to China's high-speed rail (HSR) network across the border through dedicated tunnels and includes a Mainland Port Area where the laws of (Mainland) China are enforced. It was constructed by the MTR Corporation Limited as the project manager[3] commissioned by the Hong Kong Government, through subcontractors.

The station terminal is located in Jordan, Kowloon Peninsula, north of the West Kowloon Cultural District between the Airport Express and Tung Chung line's Kowloon station and the Tuen Ma line's Austin station. The footprint of the new station extends into the underground level of the West Kowloon Cultural District.[4]

The station closed between 30 January 2020 and 15 January 2023 due to the COVID-19 pandemic. Limited services resumed in 15 January 2023, with full services resumed in 1 April 2023.[5][6]

Services

Train services

Before the pandemic, the West Kowloon station was served by both short-distance and long-haul train services. Short-distance services consisted of a frequent service to mainland Chinese cities in neighbouring Guangdong province, including Shenzhen, Dongguan, and Guangzhou, while long-distance services linked Hong Kong to at least 16 major destinations in mainland China.[7] Upon the initial resumption of service in January 2023, the station will be served only by short-haul services to Guangzhou, Dongguan and Shenzhen.[8] Short-haul trains are operated by both the MTRC (the Vibrant Express) and China Railway, whereas the long-haul trains were only operated by China Railway.

Both the MTRC and China Railway sell tickets for the other's trains. Ticket prices are set in Renminbi (RMB) which are used by China Railway's ticketing services. The MTRC use only Hong Kong Dollars (HKD) which fares are set monthly based on China Railway's RMB prices and current conversion rates with the RMB. Seat selection and remaining seat information are not available on MTRC's online ticketing platform.[9]

For all trains terminating at Hong Kong West Kowloon Station, according to the regulations outlined in the "Cross-Boundary Passenger Transport Organization Rules for Guangzhou-Shenzhen-Hong Kong High-Speed Rail," onboard make-up ticket sales to Hong Kong West Kowloon Station are not available. In the event that passengers travel beyond the mainland China-Hong Kong border towards West Kowloon Station without the appropriate ticket, staff at Hong Kong West Kowloon Station will treat them as traveling without a valid ticket. As a result, passengers will be subject to a substantial additional fee based on the "Hong Kong Railway By-Laws."[10]

Although the Express Rail Link has a design capacity of 20 trains per hour in each direction, the capacity is not expected to be fully utilised for some years.[11][12]

Шаблон:Stack Short-haul services

Long-haul services

Шаблон:Maintenance

Pre-pandemic services

Short-haul services

Шаблон:Adjacent stations

Long-haul services

Шаблон:Adjacent stations Шаблон:Update inline

Ground transport

Related developments by the Hong Kong Government in West Kowloon, expect to improve the efficiency of road and pedestrian access routes, as well as to resolve a problematic traffic intersection in West Kowloon. These road developments hope to meet the transport needs of the entire area of the new development area of West Kowloon Cultural District and West Kowloon station after completion.

Transportation StudyШаблон:Which identified the following specific road improvement measures:

  • Build a connection from Austin Road West (near Canton Road) to Lin Cheung Road (Jordan Road north) via an underground carriageway, so that pedestrians will have unimpeded access and egress between West Kowloon Cultural District, West Kowloon station and Kowloon station
  • Conduct Austin Road and Canton Road junction improvement works, including considering the widening of the Canton Road carriageway and expansion of the existing underground pedestrian tunnel system
  • Other road improvement projects in West Kowloon will be directly connected to a newly developed area near the West Kowloon Highway, in order to reduce the load on the region's transport network

Structure

Файл:Hong Kong West Kowloon Station (20181005131909).jpg
Hong Kong West Kowloon Station front entrance (2018)
Файл:Hong Kong West Kowloon (32859711308).jpg
Interior of the station
Файл:HK West Kowloon Station B1M Foodium 201809.jpg
Restaurant area on the station level B2

Construction of the West Kowloon station project was divided into two parts, XRL810A (northern part) and XRL810B (southern part)[13] (XRL meaning eXpress Rail Link). The northern construction area was awarded to Leighton Contractors & Gammon Construction responsible for joint operations.[14] The southern part of the project was awarded to a consortium of Laing O'Rourke, HCCG (Hsin Chong) & Paul Y jointly responsible for the construction.[15][16][17]

As a cross-border station, the West Kowloon station has customs and immigration facilities for passengers to go through prior to boarding, removing the need for trains to stop at the Hong Kong-Mainland China border, reducing travel time.[18][19][20]

Platforms

Файл:CRH380A-0259@WEK (20180923082434).jpg
Train G6582 at Platform 7 on the first-day operation of Hong Kong West Kowloon station

The station serves both 16-car long-haul trains and shorter 8-car short-haul regional trains. In its current initial stages, the station uses only 10 tracks (6 long-haul and 4 short-haul) with 14 platforms (6 long-haul and 4 short-haul) consisting of 5 island platforms and 4 side platforms. However, the station was designed with 15 tracks (9 long-haul and 6 short-haul) with 21 platforms (9 long-haul and 12 short-haul) using 9 island platforms and 3 side platforms for full operations.[21][22][23]

The long-haul trains use longer platforms located on the eastern end of the station. This part of the station has 9 tracks with 4 island platforms and 1 side platform. However, as of 2022, it has only ever used 6 tracks with 2 side platforms and 2 island platforms (Platforms 4–9). Passengers here board and alight from the same platform. Each platform here has 4 lifts and 4 escalators (2 for arrivals and 2 for departures). This means an island platform has a total of 8 escalators and 8 lifts. The arrivals escalators and lifts connect to the Arrival concourse on B2 and the departures connecting from the Departure concourse on B3.[24][25][21]

Short-haul trains (including MTRC's Vibrant Express) use shorter platforms which employ the Spanish solution arrangement, where platforms for boarding and alighting are separately located on opposing sides of the track. This reduces dwell times of trains in the station by reducing boarding and alighting times of passengers to allow for a higher frequency of service. Currently, there are only 4 tracks in use for the short-haul trains, with 3 island platforms (2 of which are used for alighting) and 2 side platforms with a total of 8 platforms (Platforms 11–18). The boarding platforms (both island and side) each use 3 lifts and 2 lifts. The alighting platforms each use 2 lifts and 3 escalators. In the future, there will be a total of 6 tracks (5 island platforms and 2 side platforms) serving short-haul trains.[21][23]


Шаблон:West Kowloon station platforms

Exits

A: Шаблон:Rail icon Austin station Шаблон:Access icon

B: Wui Man Road Pick-up/Drop-off Шаблон:Access icon

C: Lin Cheung Road (closed) Шаблон:Access icon

D: Green Plaza Шаблон:Access icon

F: Green Plaza Шаблон:Access icon

G: Xiqu Centre Шаблон:Access icon

H: Green Plaza Шаблон:Access icon

J: Coach Pick-up/Drop-off Шаблон:Access icon

K1: Шаблон:Rail icon Austin station Шаблон:Access icon

K2: West Kowloon Station Bus Terminus Шаблон:Access icon

K4: Sky Corridor Шаблон:Access icon

M: Elements Шаблон:Access icon

N: Шаблон:Rail icon Austin station Шаблон:Access icon

Landscaping

West Kowloon station features an extensive green garden across the roof area of the station. It also sets up a large collection of cultural elements and entertainment spaces. Passengers can easily cross the ground floor between Kowloon station, Austin station and West Kowloon Cultural District, providing Hong Kong residents and visitors ample public open space and a comfortable green walking environment. Above the station, an area of approximately Шаблон:Convert has been planted with a large number of plants and trees with traffic separated. All to create a pedestrian area, a green platform, and a wooded park that will integrate with the West Kowloon Cultural District harbourside parklands.

In addition, the West Kowloon station entrance lobby area features a green ecological leisure channel zone to tie in with the greenery on top of the building.

History and development

Файл:West Kowloon Terminus Construction Site View1 201105.jpg
Construction site in 2011

The original Шаблон:Cn span Шаблон:Cn span Шаблон:Cn span While construction of the station was still planned for completion in 2015, major flooding occurred in the railway tunnels under construction on 30 March 2014. This resulted in great damage to the tunnel boring machines.Шаблон:How many Internal MTR reports suggested causes were incomplete tender drawings, site surveys, and planning before construction began.[26] The station was formally opened on 4 September 2018 and high-speed trains started to run to destinations in Mainland China from 23 September 2018.[27]

RTHK reported that the final cost of the construction was 30% more than the initial estimate.[28]

Due to the COVID-19 pandemic, then chief executive of the territory Carrie Lam announced that West Kowloon station will be closed from midnight of Шаблон:Date until further notice.[29] The station has since then remained closed to the public, although it was used on 30 June and 1 July 2022 to facilitate Chinese leader Xi Jinping and first lady Peng Liyuan's visit to Hong Kong for ceremonies related to 25th anniversary of the Hong Kong handover and inauguration of John Lee as the new Chief Executive.

The station reopened on 15 January 2023.[30]

Mainland Port Area

Файл:港府公佈高鐵一地兩檢方案5.jpg
The Government announced the implementation of co-location arrangement on 25 July 2017
Файл:HK West Kowloon Station Mainland Port Area B3 Entrance 201809.jpg
Entrance of the Mainland Port Area
Файл:HK West Kowloon Station B3 Mainland Port Area Police Station 2018.jpg
Police station in the Mainland Port Area

Шаблон:Split portions Шаблон:Undue weight section The Mainland Port Area is an area inside West Kowloon station that serves as a border control point between mainland China and Hong Kong.[31][32][33] The area has been effectively ceded to Mainland China for a token HK$1,000 a year in rent.[34][35] Since September 2018, Mainland Chinese immigration and police personnel operate exclusively within the area, and the laws of mainland China, rather than Hong Kong, are enforced.[36][37]

This arrangement was controversial both before and after its implementation. Pro-democracy advocates were concerned about the erosion of Hong Kong's freedoms and autonomy under the "One Country, Two Systems" framework, and the Hong Kong Bar Association stated that the arrangement caused "the integrity of the Basic Law" to be "irreparably breached" and would "severely undermine" confidence in the rule of law in Hong Kong.[38][39][40] Notably, the International Covenant on Civil and Political Rights, which applies in Hong Kong, does not apply in the Mainland Port Area, leading to human rights concerns.[41][42]

Area definition

The area delineated and coloured orange on Plan No. 1 and Annex 1 to Plan No. 1 in Schedule 2 of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (Co-location) Ordinance is declared as the Mainland Port Area. It comprises the designated areas on B2 and B3 levels, the platform areas on B4 level as well as the connecting passageways.[43][44] A train compartment of a passenger train in operation on the Hong Kong Section of the Express Rail Link is to be regarded as part of the Mainland Port Area. This arrangement will facilitate mainland border control preclearance in Hong Kong. Reports in the British press suggested this area amounts to a cession of Шаблон:Convert of the station for a token annual rent of HK$ 1,000 (reported as being equivalent to £99).[45]

Except for reserved matters, the Mainland Port Area is to be regarded as an area lying outside Hong Kong but lying within Mainland China for the purposes of the application of the laws of Mainland China, and of the laws of Hong Kong, in the Mainland Port Area; and the delineation of jurisdiction over the Mainland Port Area. It does not affect the boundary of the administrative division of the Hong Kong Special Administrative Region.[46]

Although the West Kowloon HSR station is listed on a page titled [47] by the Shenzhen municipal government online, it is unclear whether this qualifies as a Port of Exit for the Shenzhen SEZ Visa on Arrival.

Implementation process

The joint meeting on 8 August 2017 of the Panel on Transport, the Panel on Security and the Panel on Administration of Justice and Legal Services of the Legislative Council passed the motion supporting the implementation of the "co-location arrangement" at the West Kowloon station.[48]

The meeting on 15 November 2017 of the Legislative Council passed the motion on taking forward the follow-up tasks of the co-location arrangement at the West Kowloon station.[49]

The Government of the Hong Kong Special Administrative Region signed the Co-operation Arrangement between the Mainland and the Hong Kong Special Administrative Region on the Establishment of the Port at the West Kowloon Station of the Guangzhou-Shenzhen-Hong Kong Express Rail Link for Implementing Co-location Arrangement with the People's Government of Guangdong Province on 18 November 2017.[44]

On 27 December 2017, the Standing Committee of the National People's Congress approved the Co-operation Arrangement and stated that it is consistent with the Constitution of the People's Republic of China and the Basic Law of the Hong Kong Special Administrative Region.[50]

The Guangzhou–Shenzhen–Hong Kong Express Rail Link (Co-location) Bill was passed by the Legislative Council at the meeting on 14 June 2018. The Ordinance gazetted on 22 June 2018 and come into operation on a day to be appointed by the Secretary for Transport and Housing by notice published in the Hong Kong Government Gazette.[51]

After a ceremony to "mark the commissioning of the Mainland Port Area" was held jointly by Frank Chan, Secretary for Transport and Housing, and "a leading Communist party official from Guangdong province",[45] democracy activists noted that it constituted an erosion of the SAR's autonomy, with Tanya Chan reported as telling local radio that "the unlawful and unconstitutional joint checkpoint has been implemented forcefully — it has caused an irreparable damage to our legal system and rule of law."[45] Chief Executive Carrie Lam, however, denied that there was any attempt to cover up the event, despite the ceremony being closed to press and being held without advance notice to news media or to members of the Legislative Council.[45]

In the Court of First Instance of the High Court, Judge Anderson Chow refused the applications for leave to apply for judicial review by his decision dated 27 September 2017[52] and 18 April 2018.[53] He refused the applications for interim relief by his decision dated 14 August 2018.[54] He granted the applications for leave to apply for judicial review but dismissed the substantive applications for judicial review by his judgment dated 13 December 2018.[55]

Mainland police operations

Since the Mainland Port Area began operations, there have been several reported cases of travellers being detained or arrested by mainland officials in Hong Kong.[56][57][58] In one case, Simon Cheng, a Hong Kong resident working for the British consulate was detained upon returning to Hong Kong and sent back to mainland China by mainland police officers.[59][60] Amid the 2019–20 Hong Kong protests, Chinese border officers have also begun to routinely search the phones of travellers for evidence of involvement in the protests.[61]

Awards

In 2010, the West Kowloon station design won "Cityscape Awards for Architecture" in the Emerging Markets of Tourism, Travel & Transport Future Awards.[62] In the same year on 4 November, the West Kowloon station design won the "Best Future Project ─ Infrastructure" World Architecture Festival Awards.[63]

See also

Шаблон:Commons category

References

Шаблон:Reflist

Further reading

Шаблон:Yau Tsim Mong District Шаблон:XRL Шаблон:Eastern Guangdong & Hong Kong transit Шаблон:Immigration Control Stations in Hong Kong Шаблон:China–Hong Kong border crossings

Шаблон:Coord

  1. Шаблон:Citation
  2. Шаблон:Cite news
  3. Шаблон:Cite web
  4. Шаблон:Cite report
  5. Шаблон:Cite news
  6. Шаблон:Cite news
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite web
  11. 大珠三角之鐵路發展 Шаблон:Webarchive 第25頁,香港鐵路公司,2008年10月18日
  12. 高鐵班次及載客量 Шаблон:Webarchive 香港鐵路公司
  13. Шаблон:Cite web
  14. Шаблон:Cite web
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite web
  18. Шаблон:Cite web
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. 21,0 21,1 21,2 Ошибка цитирования Неверный тег <ref>; для сносок stationlayout не указан текст
  22. Шаблон:Cite report
  23. 23,0 23,1 Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite web
  26. Шаблон:Cite news
  27. Шаблон:Cite news
  28. Шаблон:Cite web
  29. Шаблон:Cite news
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite press release
  33. Шаблон:Cite news
  34. Шаблон:Cite news
  35. Шаблон:Cite news
  36. Шаблон:Cite news
  37. Шаблон:Cite news
  38. Шаблон:Cite news
  39. Шаблон:Cite news
  40. Шаблон:Citation
  41. Шаблон:Cite web
  42. Шаблон:Cite news
  43. Шаблон:Cite web
  44. 44,0 44,1 Шаблон:Cite web
  45. 45,0 45,1 45,2 45,3 Шаблон:Cite news
  46. Шаблон:Cite web
  47. Шаблон:Cite web
  48. Motion on "Customs, Immigration and Quarantine Arrangements of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link" passed at the joint meeting on 8 August 2017
  49. Voting Results
  50. Шаблон:Cite web
  51. Шаблон:Cite press release
  52. Шаблон:Cite web
  53. Шаблон:Cite web
  54. Шаблон:Cite web
  55. Шаблон:Cite web
  56. Шаблон:Cite web
  57. Шаблон:Cite web
  58. Шаблон:Cite web
  59. Шаблон:Cite web
  60. Шаблон:Cite news
  61. Шаблон:Cite news
  62. Real Estate Investment, Development and Construction Exhibition - 2010 Winners Шаблон:Webarchive Cityscape,2010年
  63. West Kowloon Terminus Шаблон:Webarchive World Buildings Directory