Английская Википедия:Horton-in-Ribblesdale railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station Horton-in-Ribblesdale is a railway station on the Settle and Carlisle Line, which runs between Шаблон:Rws and Шаблон:Rws via Шаблон:Rws. The station, situated Шаблон:Convert north-west of Leeds, serves the village of Horton-in-Ribblesdale, Craven in North Yorkshire, England. It is owned by Network Rail and managed by Northern.

History

The station was completed by the Midland Railway in 1876 and was opened for passengers on 1 May. It was initially named "Horton".Шаблон:Sfn The London Midland and Scottish Railway absorbed the Midland Railway on 1 January 1923 and renamed the station as Horton-in-Ribblesdale on 26 September 1927.Шаблон:Sfn

The station buildings were designed by the Midland Railway company architect John Holloway Sanders.[1]

The station is currently (2019) served and managed by Northern, as are all the trains calling at the station. It is unstaffed, with no ticket vending facilities (so tickets can only be purchased in advance or on the train – Northern has stated it plans to provide a ticket machine here in the future). The station waiting room is open for public use, having been restored by the Settle & Carlisle Railway Trust in 2002 as part of a wider refurbishment of the main buildings on the eastern side (other parts of the building are rented out for commercial use).[2]

It is located near to Pen-y-ghent, one of the mountains known collectively as the Yorkshire Three Peaks. The station and the village of Horton-in-Ribblesdale are at 850 feet above sea level, as stated on the decorative station information board, and are about Шаблон:Convert north of Settle.

In the 1950s and 1960s under stationmaster Taylor, Horton won the "Best Kept Station" award for 17 consecutive years.[3] The station lost its passenger service on 4 May 1970, but reopened in July 1986,[4] along with several other local stations on the line under British Rail. Goods traffic was handled at the station until 1964, with sidings at the southern end serving the nearby Horton Quarry continuing in use until the early 1980s. These were removed after the station signal box was decommissioned in 1986, but plans to reinstate them (as was done at nearby Arcow Quarry in 2016) have been approved and preliminary work to do so is under way (as of February 2024).

Stationmasters

Шаблон:Div col

  • J.H. Preston 1876 – 1877[5]
  • H.J. Newth 1877 – 1880[5]
  • Thomas Rawlings 1880[5] – 1882[6]
  • William Henry Bunce 1882 – 1886[6] (afterwards station master at Hawes Junction (Garsdale))
  • Charle James 1886 – 1898[6]
  • Richard Davies 1898[6] – ca. 1911
  • W. Hardy ca. 1914
  • Albert Daw 1929 – 1938[7] (afterwards station master at Barnoldswick)
  • F. Hodgson ca. 1945 ca. 1947
  • James M. Taylor 1947 - 1959 (afterwards station master at Settle)

Шаблон:Div col end

Facilities

As the station does not have a footbridge, the platforms are linked by a foot crossing (known in railway terms as a barrow crossing).[8] Both platforms are lower than standard (though the southbound one has been partially raised to improve access to trains); there is no step-free access.[9] Train running information is available via telephone and timetable posters, with digital PIS displays also now available following a rolling upgrade programme of station facilities by operator Northern.

There is a proposal that the station receives a new footbridge (announced in March 2020), thanks to a £1.9 million scheme funded jointly by Network Rail and the government. This will see a fully accessible footbridge (complete with lifts) installed to replace the current barrow crossing.[10] The bridge will also allow a scheme to relay the former quarry sidings (to permit Horton Quarry to dispatch its stone by rail once more) to proceed, as more trains would be shunting in and out of the station.[11] However, the Yorkshire Dales National Park authority have objected to the proposal for a footbridge on the grounds that the design will impede on the conservation area, as the buildings that will house the lift shafts will be prominent above the station.[12]

Service

Шаблон:Northern (train operating company) route 7 There are about one train every two hours in each direction: southbound to Leeds (seven in total) and northbound to Carlisle (eight, plus one evening train that terminates at Ribblehead). The total is slightly unbalanced as some trains do not stop here. There is an extra train to Leeds on Saturdays, whilst there are five trains a day to both Leeds and Carlisle on Sundays (one of the former now continues to Шаблон:Rws).[13]

References

Шаблон:Reflist

Sources

Шаблон:Refbegin

Шаблон:Refend

External links

Шаблон:Rail start Шаблон:Rail line Шаблон:Historical Rail Insert Шаблон:Rail line Шаблон:S-end

Шаблон:Railway stations in Craven Шаблон:North Yorkshire railway stations Шаблон:Railway stations served by Northern Trains