Шаблон:Short description Шаблон:Use dmy dates Шаблон:Infobox power station Шаблон:Location mark Hywind Scotland is the world's first commercial wind farm using floating wind turbines, situated Шаблон:Convert off Peterhead, Scotland. The farm has five 6 MW Siemens direct-drive turbines on Hywind floating monopiles, with a total capacity of 30 MW.[1] It is operated by Hywind (Scotland) Limited, a joint venture of Equinor (75%) and Masdar (25%).[2]
Equinor (then: Statoil) launched the world's first operational deep-water floating large-capacity wind turbine, the US$71 million 2.3 MW Hywind ($31/W), in 2009.[3][4] The Шаблон:Convert tall tower with a 2.3 MW Siemens turbine was towed from the Åmøy fjord and Шаблон:Convert offshore into the North Sea in Шаблон:Convert deep water, off of Stavanger, Norway on 9 June 2009 for a two-year test run,[5] but remains working at the site[6][7] while surviving Шаблон:Cvt wind speed and 19 m waves.[8]
In 2015, the company received permission to install the wind farm in Scotland, in an attempt at reducing the cost relative to the original Hywind,[9][10] in accordance with the Scottish Government's commitment for cost reduction.[11] Manufacturing for the project, with a budgeted cost of NOK2 billion (£152m), started in 2016 in Spain, Norway and Scotland. The turbines were assembled at Stord in Norway in summer 2017 using the Saipem 7000 floating crane, and the finished turbines were moved to near Peterhead.[12][13][14] Three suction anchors hold each turbine.[15] Hywind Scotland was commissioned in October 2017.[16][17][18]
While cost was reduced compared to the very expensive Hywind One at $31m/MW,[8][19][4] it still came with a final capital cost of £264m, or £8.8m/MW, approximately three times the capital cost of fixed offshore windfarms.[20] Measured by unit cost, Hywind's levelized cost of electricity (LCoE) is then £180/MWh ($248/MWh), about three times the typical LCoE of a fixed offshore wind farm at £55/MWh ($75.7/MWh).[21] The high cost is partly compensated by £165.27/MWh from Renewable Obligation Certificates.[22]
In its first 5 years of operation the facility has averaged a capacity factor of 54%, sometimes in 10 meter waves.[23][24][25][26][27] By shutting down at the worst conditions, it survived Hurricane Ophelia, and then Storm Caroline with wind gusts at Шаблон:Cvt and waves of 8.2 metres.[28]
The subsequent 88 MW Hywind Tampen (with concrete floating foundations)[29] became operational at the Snorre and Gullfaks oil fields in Norway in 2023[30] at a cost of NOK 8 billion[31] or £600m (£6.8/MW).
See also
References
Шаблон:Wind power in the United Kingdom Шаблон:Electricity generation in Scotland
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ 4,0 4,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 8,0 8,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- Английская Википедия
- 2017 establishments in Scotland
- 2017 in technology
- Equinor
- Wind farms in Scotland
- Offshore wind farms in the North Sea
- Floating wind turbines
- Energy infrastructure completed in 2017
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии