Английская Википедия:Interstate 55 in Tennessee

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Highway detail hatnote Шаблон:Use mdy dates Шаблон:Use American English Шаблон:Infobox road

Interstate 55 (I-55) is part of the Interstate Highway System that runs from LaPlace, Louisiana, to Chicago, Illinois. In the state of Tennessee, the Interstate is located entirely within the state's second-largest city of Memphis, running Шаблон:Convert from the Mississippi state line in the Whitehaven neighborhood to the Arkansas border across the Mississippi River. Of the six states that the Interstate passes through, the segment in Tennessee is the shortest, as well as the shortest mainline Interstate segment in Tennessee. I-55 serves a number of neighborhoods and industrial areas in the southwestern portion of Memphis, and also provides access to the Memphis International Airport, the second-busiest cargo airport in the world.

I-55 is known as the Bishop J.O. Patterson Sr. Memorial Parkway and the W.B. Fowler Sr. Expressway in Tennessee. The Interstate utilizes the Memphis & Arkansas Bridge across the Mississippi River. Completed in 1949, this is the oldest bridge on the Interstate Highway System in Tennessee and the oldest bridge on I-55. The remainder of the route was constructed between 1958 and 1967, making it the first mainline Interstate Highway in Tennessee to be completed. The route also had an auxiliary Interstate, I-255, which was renumbered as an extension of I-240 in 1973. Since its construction, the Interstate has seen a number of expansion and improvement projects, with additional ones planned for the future.

Route description

Файл:I-55 North - Exit 2 - TN175 Shelby Drive (44718536525).jpg
I-55 northbound in the Whitehaven neighborhood in Memphis

I-55 is maintained by the Tennessee Department of Transportation (TDOT), along with all other Interstate, US, and state highways in Tennessee. In 2023, annual average daily traffic (AADT) volumes ranged from 113,713 vehicles per day between US Route 51 (US 51) and I-240 and 59,207 vehicles per day between McLemore Avenue and Crump Boulevard/Riverside Drive.[1]

I-55 enters Tennessee from Southaven, Mississippi, in the Whitehaven neighborhood of southwestern Memphis, with the northern ramps from the northernmost Mississippi exit extending into Tennessee. Traveling in a direct north-south alignment, this stretch of the freeway carries eight lanes, with the leftmost lanes serving as high-occupancy vehicle (HOV) lanes during rush hour. The first interchange is with State Route 175 (SR 175, Shelby Drive). The Interstate then passes west of the Memphis International Airport and shifts to the northwest, where the northbound Tennessee Welcome Center is located. A short distance later is a complex interchange with Brooks Road and US 51 (Elvis Presley Boulevard) near Graceland, the home of Elvis Presley. Gradually turning north, the HOV restrictions terminate and the Interstate crosses Nonconnah Creek before reaching a two-level cloverstack interchange with Interstate 240. Here, a pair of ramps carry I-55's traffic through the interchange into an east-west alignment, and I-240 shifts from a north-south alignment heading from Downtown and Midtown Memphis to an east-west direction through the southern neighborhoods of the city.[2][3]

Файл:Memphis Arkansas Bridge Memphis TN 2012-07-22 016.jpg
The Memphis & Arkansas Bridge carries I-55 across the Mississippi River between Tennessee and Arkansas

Carrying between four and six lanes for its remaining length in Tennessee, I-55 first crosses a series of railroads serving an industrial area to the north, and has a three-level cloverstack interchange with US 61 (Third Street). Passing to the north of a levee, the freeway then gradually turns to the north, where it crosses another railroad before reaching a single-point urban interchange (SPUI) with Mallory Avenue adjacent to an oil refinery operated by Valero Energy. Passing west of the Riverside neighborhood, the interstate has an interchange with South Parkway, part of the historic Memphis Parkway System before reaching an interchange with McLemore Avenue near the eastern end of the President's Island peninsula on the Mississippi River and crossing another railroad. Traveling northeastward for a brief distance, the Interstate reaches a cloverleaf interchange with US 61/64/70/78/79 (Crump Boulevard) currently in the process of being reconstructed, where it begins a concurrency with these routes. Here, the freeway turns directly westward, and northbound traffic must navigate a loop ramp through this interchange to stay on I-55. The freeway then turns slightly northwest at an interchange with Metal Museum Drive, and crosses the Mississippi River on the Memphis & Arkansas Bridge, where it enters Arkansas.[2][3]

History

Predecessor highways and bridges

In the 19th century a number of trails connected Memphis with surrounding areas. In 1915, the Tennessee Department of Highways and Public Works, the predecessor agency to TDOT, was established, and tasked with designating a state highway system. That year, they designated the Memphis to Bristol Highway, which ran approximately Шаблон:Convert from Memphis to Bristol in the northeastern corner of the state.[4] On October 1, 1923, the highway department established the state's numbered highway system. The Memphis to Bristol Highway was designated as State Route 1 (SR 1), the road between Memphis and Vicksburg, Mississippi, was designated as part of SR 14, the main road connecting Memphis with Jackson, Mississippi, and New Orleans, Louisiana was designated as SR 3, and the road running southeast of Memphis to Birmingham, Alabama, was established as SR 4.[5] When the United States Numbered Highway System was established on November 11, 1926, these routes were designated as U.S. Routes 70, 61, 51, and 78, respectively.[6]

The Frisco Bridge was the first bridge across the Mississippi River to be constructed in Memphis, as well as the first crossing of the Lower Mississippi River. Completed in 1892, this bridge carried a single track of the Kansas City, Fort Scott and Memphis Railway, which was later acquired by the St. Louis–San Francisco Railway. The Frisco bridge was joined by the Harahan Bridge in 1916, a double-track bridge which was jointly constructed by the Rock Island, Iron Mountain, and Cotton Belt railroads. This bridge contained a series of wagonways that opened the following year and carried automobile traffic.[7] By the late 1920s, these wagonways had become congested, and the need for a new bridge exclusively carrying automobile traffic became apparent. Preliminary planning was delayed by the Great Depression, and did not begin until the creation of the joint Memphis and Arkansas Bridge committee on March 14, 1939. This committee was headed by then-Memphis mayor and political boss E. H. Crump, and included Congressman Walter Chandler and U.S. Senator Kenneth McKellar.[8] The plans also included a new street leading up to the bridge bypassing both Downtown Memphis and historic African American neighborhoods to the south. This street became known as Crump Boulevard.[9] Engineering firm Modjeski and Masters, who also helped design the Frisco and Harahan bridges, was hired on May 19, 1944,[8] and construction of the bridge began on September 12, 1945.[10] Work on Crump Boulevard began in September 1948.[9] On December 17, 1949, the Memphis & Arkansas Bridge and Crump Boulevard opened to traffic.[11]

Interstate Highway planning and construction

Файл:I-55 Memphis near MS state line.jpg
I-55 near the Mississippi state line in the early 1960s, looking north

The highway that is now I-55 had its origins in the late 1930s, when the federal government began planning for a national "superhighway" system. A 1939 report published by the Bureau of Public Roads (BPR), the predecessor agency to the Federal Highway Administration (FHWA), recommended a controlled-access highway connect Memphis with Jackson, Mississippi, to the south, and Chicago to the north.[12] This routing was affirmed in the National Interregional Highway Committee's 1944 report, titled Interregional Highways.[13] Three years later, a plan produced by the Public Roads Administration of the now-defunct Federal Works Agency recommended the freeway cross the Mississippi River in Memphis into Arkansas, and run through St. Louis before reaching Chicago.[14] A plan for Memphis' freeway system produced in 1955 recommended that a north-south freeway enter the city in the Whitehaven community, and intersect with an east-west route in Midtown. A loop encircling the city was also planned, which would interchange with the north-south route directly north of Nonconnah Creek, and run along the riverfront, crossing Crump Boulevard and the east-west route, before crossing Mud Island and intersecting with the northern terminus of the north-south route.[15] By July 1956, the freeway between Crump Boulevard and the north-south freeway north of town had been cancelled due to opposition from the Bureau of Public Roads, which resulted in the freeway being rerouted across the Memphis & Arkansas Bridge.[16] The Federal-Aid Highway Act of 1956 established the Interstate Highway System and allocated a total of Шаблон:Convert of Interstate Highways to Tennessee, including the freeway that would become I-55.[17] The numbering was approved by the American Association of State Highway Officials on August 14, 1957, for the north-south freeway between the Mississippi state line and the interchange adjacent to Nonconnah Creek, and the original loop route between this interchange and the Mississippi River.[18]

The first segment of I-55 to begin construction after the passage of the Federal-Aid Highway Act was the interchange with I-240, along with a short stretch of that route east of the interchange. A contract for this project was awarded on July 25, 1958.[19] The section between the Mississippi state line and US 51/Brooks Road was awarded in two smaller segments on June 26, 1959, and October 30, 1959, and was opened to traffic on December 2, 1961.[19][20] This was the first completed freeway segment in Memphis.[20] On December 15, 1962, the short section between Brooks Road/US 51 and I-240, along with an adjacent section of I-240 to the east, was dedicated and opened to traffic.[21][22] The section between I-240 and east of US 61 (Third Street) was let on February 16, 1962,[23] and the adjacent section extending to Horn Lake Road was awarded on December 13, 1963.[24] The section between Horn Lake Road and South Parkway was let on February 28, 1964.[24] On March 18, 1966, the section between I-240 and US 61 was dedicated and opened.[25] The section between US 61 and South Parkway was dedicated and opened on October 14, 1966.[26] Work on the last section, located between South Parkway and the Memphis & Arkansas Bridge and which consisted of upgrading the reused stretch of Crump Boulevard between the bridge and the cloverleaf interchange to freeway standards, began on September 11, 1964, and was opened on April 20, 1967.[27]

Later history

Crump Interchange reconstruction

As traffic volumes grew, the cloverleaf interchange with Crump Boulevard gradually became inadequate, leading to congestion and a high accident rate. The design required I-55 northbound traffic to utilize a loop ramp with a Шаблон:Convert design speed to pass through the interchange. Southbound traffic used a one-lane ramp in order to remain on I-55. Originally, northbound traffic had to merge onto a one-lane loop with a tight radius while traffic going from I-55 southbound to Riverside Drive merged into traffic on another loop ramp. A temporary solution was put into effect in 2011 by widening the northbound loop to two lanes, eliminating the loop ramp between I-55 southbound and Riverside Drive, and creating a left turn lane for this traffic. This eliminated having to make a lane change in order to stay on I-55 northbound.[28] In June 2021, a second lane was added for the I-55 southbound ramp in response increased traffic due to the Hernando de Soto Bridge closure.[29] The FHWA first approved a draft environmental impact statement for the project on March 25, 2009.[30] Two initial plans were developed that would have required the demolition of eight homes in the predominately African American French Fort neighborhood, but after input from residents, two additional designs were created to shift the I-55 lanes to the east in order to avoid this.[31][32] These designs also included a roundabout between Crump Boulevard, Riverside Drive, and Alson Avenue at the location of the cloverleaf interchange.[33] The FHWA approved the final environmental impact statement on June 28, 2011,[31] and a record of decision for the final design, called Alternative Z-1, on January 25, 2012.[34]

Файл:Int55nRoad-Exit12B-TurnToStayOnInt55Curve (30578439532).jpg
I-55 northbound approaching the original configuration of the Crump interchange

The final design includes construction of a flyover bridge to carry I-55 traffic through the interchange, with ramps providing access to the roundabout. In addition, the interchange with Metal Museum Drive will be eliminated, a new Wisconsin Street overpass will be constructed, noise walls will be erected, and the Memphis & Arkansas Bridge will be repaired.[35][36] The project which was expected to cost $32.4 million in 2014, was first delayed that year due to a shortage of federal transportation funds.[37] On May 27, 2015, TDOT announced plans to close the Memphis & Arkansas Bridge for nine months as part of the project, beginning in early 2017.[38] This drew considerable backlash from residents, businesses, and government officials in the Memphis area, prompting TDOT to reconsider their plans for construction and further delay the project.[39][40] At the time, bidding for the project was scheduled for December 2015.[38] On July 24, 2015, TDOT announced that they would no longer pursue a long-term closure of the bridge, and would conduct more detailed studies on how to implement construction over the next year.[41] On March 30, 2022, TDOT awarded a $141.2 million contract for the project.[42] The project shortens the closure time of the Memphis & Arkansas Bridge to two weeks.[43][44] Preliminary work began on May 3, 2022,[36] and construction was scheduled to begin on June 6, but was postponed by seven days due to inclement weather.[45][46] Work is expected to be completed by February 14, 2025.[36][42]

Memphis & Arkansas Bridge replacement

Since the early 1990s, leaders in the Memphis area have projected an eventual need for a third highway bridge across the Mississippi River in the area due to increasing traffic volumes. In addition, the need to eventually replace the Memphis & Arkansas Bridge on I-55 has been recognized, due to its age and the fact that it does not meet Interstate Highway standards. The bridge is also located within the New Madrid Seismic Zone, one of the most seismically active regions in North America, and was not designed to withstand a high magnitude earthquake. In 2006, TDOT commissioned a feasibility study on the possibility of constructing an additional bridge across the Mississippi River in Memphis. This explored the possibility of constructing a third bridge to relieve congestion on the Memphis & Arkansas Bridge and the nearby Hernando de Soto Bridge on I-40, as well as replacing the former entirely.[47][48] A study was conducted in 2009 on the possibility of a toll bridge across the river, and on January 11, 2011, TDOT completed a study on the possibility of a new rail and auto bridge in Memphis, which was known as the "Southern Gateway Project".[49] In February 2014, TDOT completed a cost benefit analysis on this project.[50] This project reportedly faded away due to cost and an inability of the communities in the Memphis area to agree on a location for the bridge.[51]

The need for a new bridge was once again thrust into the spotlight when the Hernando de Soto bridge was closed to all traffic between May 11 and August 2, 2021, due to a fracture in the structure.[52][53] This forced much of the traffic on I-40 to detour across the Memphis & Arkansas Bridge. Later that year, the Infrastructure Investment and Jobs Act (IIJA) was enacted by Congress. This legislation includes the Bridge Investment Program (BIP), which provides $7.25 billion in federal funding until 2026 for bridge projects costing over $100 million. These projects are awarded in competitive grants at 50% of the total cost.[54] On April 17, 2023, Governor Bill Lee signed into law the Transportation Modernization Act, which provides increased funding for highway projects in Tennessee.[55] Six months later TDOT and the Arkansas Department of Transportation (ARDOT) completed a study on the possibility of a new bridge in Memphis, which found that replacing the Memphis & Arkansas bridge would be the most cost-effective option.[56] On December 4, 2023, TDOT and ARDOT jointly submitted an application for a grant under the BIP to replace the Memphis & Arkansas Bridge. Under the terms of the application, TDOT and ARDOT have agreed to each pay for 25% of the total cost of the bridge, which is tentatively expected to cost $787.5 million, although the final figure could be higher. This project, which has been named "America's River Crossing", is tentatively planned to begin in 2026.[57]

Other history

Файл:Interstate 240 Tennessee.jpg
I-55 northbound at the interchange with I-240 in Memphis

I-55 was widened from four to eight lanes between the Mississippi state line and the I-240 interchange in two phases. The first phase, which took place between February 1999 and June 2001, widened the section between Winchester Road and I-240. The second phase, which ran from early 2000 to July 2002, extended the widening south to the state line.[58] In May 2008, work began on a project to reconfigure the interchange with Mallory Avenue from a partial cloverleaf interchange into a single-point urban interchange.[59] As part of this project, I-55 was widened to six lanes through the interchange, and new bridges were constructed over Mallory Lane, a railyard serving the Valero refinery, and Paul L. Lowery Road. Initially slated for completion in late 2010, the project experienced multiple delays, and was not completed until December 2012.[60][61]

An extension of Interstate 69 through Tennessee was proposed under the 1991 Intermodal Surface Transportation Efficiency Act (ISTEA) as part of a corridor to facilitate trade between Canada and Mexico. This extension was further spearheaded by the enactment of the North American Free Trade Agreement (NAFTA) in 1994.[62] This extension, sometimes considered part of the unofficial NAFTA superhighway, was proposed to utilize the section of I-55 between the Mississippi border and I-240, and continue north along that route.[63][64] On January 18, 2008, the FHWA authorized Mississippi and Tennessee to sign I-69 between an interchange on I-55 in Hernando, Mississippi, and the I-40/SR 300 interchange in north Memphis.[65] Tennessee has not signed the extension of the route, although Mississippi has already done so. It is unclear, however, if the route will ever be built through Memphis.[63][64] In November 2023, the American Association of State Highway and Transportation Officials (AASHTO) approved an extension of US 78 into Arkansas, which utilizes I-55 between the Memphis & Arkansas Bridge and the Crump interchange.[66]

Honorary designations

The section of I-55 between the Arkansas state line and I-240, along with part of I-240 to the east, was named the "W.B. Fowler Sr. Expressway" by the Memphis City Commission in 1960 in honor of William B. Fowler, who served as city engineer between 1919 and 1962.[67][68] The portion between the Mississippi state line and I-240 was named the "Bishop J. O. Patterson Sr. Memorial Parkway" by the Tennessee General Assembly in 1995 in honor of J. O. Patterson Sr., who served as presiding bishop of the Memphis-based Church of God in Christ from 1968 until his death in 1989.[69]

Exit list

Шаблон:Jcttop Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:TNint Шаблон:Jctplace Шаблон:ARint Шаблон:Jctbtm

Auxiliary routes

The stretch of I-240 extending from north of the I-55/I-240 interchange to I-40 in downtown Memphis was originally numbered I-255. This section of highway opened in segments between 1965 and 1971.[70] On November 1, 1971, the Tennessee Department of Highways sent a request to the FHWA to renumber I-255 as part of I-240, which was approved by AASHTO on November 10, 1973.[71][72] I-255 is an auxiliary Interstate Highway that begins at a junction with I-55 in southeast Missouri, and crosses the Mississippi River on the Caruthersville Bridge into northwest Tennessee, before terminating in Dyersburg, about Шаблон:Convert north of Memphis.[2][73]

References

Шаблон:Reflist

External links

Шаблон:AttachedKML Шаблон:State detail page browse

  1. Шаблон:Cite web
  2. 2,0 2,1 2,2 Шаблон:Cite map
  3. 3,0 3,1 Шаблон:Cite map
  4. Шаблон:Cite web
  5. Шаблон:Cite book
  6. Шаблон:Cite map
  7. Шаблон:Cite news
  8. 8,0 8,1 Шаблон:Cite news
  9. 9,0 9,1 Шаблон:Cite news
  10. Шаблон:Cite news
  11. Шаблон:Cite news
  12. Шаблон:Cite book
  13. Шаблон:Cite web
  14. Шаблон:Cite map
  15. Шаблон:Cite news
  16. Шаблон:Cite news
  17. Шаблон:Cite book
  18. Ошибка цитирования Неверный тег <ref>; для сносок AASHO-1957 не указан текст
  19. 19,0 19,1 Шаблон:Cite book
  20. 20,0 20,1 Шаблон:Cite news
  21. Шаблон:Cite news
  22. Шаблон:Cite news
  23. Шаблон:Cite book
  24. 24,0 24,1 Шаблон:Cite book
  25. Шаблон:Cite news
  26. Шаблон:Cite news
  27. Шаблон:Cite news
  28. Шаблон:Cite web
  29. Шаблон:Cite news
  30. Шаблон:Cite book
  31. 31,0 31,1 Шаблон:Cite book
  32. Шаблон:Cite news
  33. Шаблон:Cite news
  34. Шаблон:Cite book
  35. Шаблон:Cite web
  36. 36,0 36,1 36,2 Шаблон:Cite web
  37. Шаблон:Cite news
  38. 38,0 38,1 Шаблон:Cite press release
  39. Шаблон:Cite news
  40. Шаблон:Cite news
  41. Шаблон:Unbulleted list citebundle
  42. 42,0 42,1 Шаблон:Cite press release
  43. Шаблон:Cite news
  44. Шаблон:Cite news
  45. Шаблон:Cite news
  46. Шаблон:Cite news
  47. Шаблон:Cite book
  48. Шаблон:Cite book
  49. Шаблон:Cite book
  50. Шаблон:Cite book
  51. Шаблон:Cite news
  52. Шаблон:Cite news
  53. Шаблон:Cite news
  54. Шаблон:Cite web
  55. Шаблон:Cite press release
  56. Шаблон:Cite book
  57. Шаблон:Cite book
  58. Шаблон:Cite news
  59. Шаблон:Cite press release
  60. Шаблон:Cite news
  61. Шаблон:Cite news
  62. Шаблон:Cite web
  63. 63,0 63,1 Шаблон:Cite news
  64. 64,0 64,1 Шаблон:Cite news
  65. Шаблон:Cite web
  66. Шаблон:AASHTO minutes
  67. Шаблон:Cite news
  68. Шаблон:Cite news
  69. Шаблон:Unbulleted list citebundle
  70. Шаблон:Unbulleted list citebundle
  71. Шаблон:Cite web
  72. Шаблон:AASHTO minutes
  73. Шаблон:Cite web