Английская Википедия:Irkut MC-21

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Redirect-distinguish-text Шаблон:Use dmy dates

Шаблон:Infobox aircraft type

The Yakovlev MC-21 (Шаблон:Lang-ru) is a single-aisle airliner, developed in Russia by the Yakovlev Corporation (formerly known as Irkut Corporation), a branch of the United Aircraft Corporation (UAC), itself a 92%-owned subsidiary of Russia's state-owned aviation giant Rostec.[1]

The program was launched in 2007. Irkut rolled out the first MC-21-300 on 8 June 2016 and first flew the aircraft on 28 May 2017. The twinjet has a carbon fibre reinforced polymer wing and is powered by Aviadvigatel PD-14 turbofans or Pratt & Whitney PW1000G engines. The standard MC-21-300 has a capacity of 132–163 passengers in a two-class configuration and 165–211 in a single class, and a range up to Шаблон:Cvt. It will be followed by a shortened MC-21-200 version. By July 2018, it had received 175 firm orders.

In early 2022, international sanctions against Russia were imposed due to the Russian invasion of Ukraine. Irkut Corporation was placed on the sanctions lists of the United States, Canada, Switzerland and Ukraine,[2] while United Aircraft Corporation was placed on the sanctions lists of the United States, European Union, Japan, Switzerland, France, Belgium and Ukraine,[3] and the European Union Aviation Safety Agency (EASA) suspended all work on type certification of the MC-21.[4] To circumvent the sanctions, Irkut intends to use only Russian avionics and engines. On 7 April 2022 Mikhail Mishustin said that the substitution of domestic assemblies should be completed within 2–3 years,[5] and the Russian government expects that the percentage of domestic components in the MC-21 will be 97% by 2022–2024, making it independent of imported equipment.[6] At the beginning of 2024, it became clear that the launch date for the MC-21 series would be shifted to 2025-2026. Due to the fact that Russian aircraft manufacturers are forced to use domestic components, the aircraft turned out to be six tons heavier and no longer met the declared characteristics.[7]

Naming

In Шаблон:Lang-ru Magistral'nyj Samoljot 21 veka translates as "mainline aircraft of the 21st century".[8] It is marketed in the West as the MC-21,[9][10] though the aircraft's Russian-language designation transliterates as Шаблон:Lang.

In 2013, Russian deputy premier Dmitry Rogozin indicated that it would be designated Yak-242 once it enters serial production, the name of a 1990s proposal of an aircraft of similar size.[11] In 2014, Oleg Demchenko, the president of Irkut at the time, also preferred the Yak-242 name, claiming it would better reflect the design bureau behind the aircraft, however, he has also said that any of these renaming decisions would be made after the aircraft first flight and certification work.[12]

In August 2023, Irkut Corporation formally rebranded the entire company as Yakovlev.[13]

Development

Файл:MC-21 on the assembly line at Irkut.jpg
Assembly of prototype in January 2016

The program was launched in 2007, planning a 2016 introduction.[8] In 2009, the MC-21 was in the "pre-design" phase, with projected completion of the first prototype in 2013 and the first flight in 2014.[14] By June 2011, the "pre-design" phase was completed and the "working design" stage was under way with three-dimensional models and drawings for subcontractors and suppliers, to be completed by mid-2012.[15] In February 2012, Russian deputy prime minister Dmitry Rogozin announced it was slated to begin certification tests in 2015/2016 and to enter production in 2020.[16] The unit cost of the MC-21-200 is US$ 72 million,[9] and US$91 million for the MC-21-300.[17]

On 8 June 2016, the -300 was rolled-out in Irkutsk, East Siberia, six years after program launch and with 175 orders. It could be the first commercial aircraft to use out of autoclave composite manufacturing for its wings. The program faces domination of the single-aisle market by Airbus and Boeing. Russian protectionism is hampering access to critical western suppliers for the avionics, landing gear, hydraulics, power systems and engines. Its introduction was delayed to the end of 2018.[18][19] It is comparable to the Airbus A320neo or Boeing 737 MAX and could replace the outgoing Tu-134, Tu-154, Tu-204 and Yak-42.

Ground testing

Файл:MC-21-presentation-governmentru.jpg
Behind Russian Prime Minister Dmitry Medvedev at the June 2016 roll-out

In February 2017, it passed 90% of the static ultimate load test (150% of the highest load in operation) at the TsAGI but failed the 100% test for which the wingbox will need Шаблон:Convert reinforcements: this is common for new airliners like the Airbus A380, Boeing 787 or Mitsubishi MRJ, aiming for the smallest possible margin to avoid excess weight; it passed the limit load test (highest load during flight) which enables flight testing which should start in April.[20] Cracks developed at the point of contact between the titanium beam and the composite wing skin in the wingbox.[8] The reinforced wingbox withstood a load exceeding specifications without damage in mid-November at TsAGI Moscow.[21]

In May 2017, it was undergoing systems ground testing including its auxiliary power unit and taxiing tests.[22] After completing taxi and runway roll tests, its maiden flight was scheduled for late May 2017 with Pratt & Whitney Geared Turbofan engines, certified in September 2016 in Russia. The Russian certification was targeted for 2018 and the European Aviation Safety Agency certificate for 2019.[8]

Flight testing

Файл:Первый полет нового пассажирского лайнера МС-21.webm
Video of maiden flight, May 2017

On 28 May 2017 MC-21 made its successful maiden flight in Irkutsk.[23] Compared with recent 3-to-4-hour maiden flights of western types, this first flight was brief at 30-minute and low, reaching a Шаблон:Convert altitude and Шаблон:Convert.[24] The maiden flight was originally scheduled for December 2016, then to April before finally taking place in May.[25]

Following this maiden flight, trade and industry minister Denis Manturov claims it will have 12–15% lower operating costs than contemporaries, generating a demand for over 1,000 MC-21s between 2017 and 2037.[26] Aeroflot expects delivery of the first aircraft through Rostec subsidiary Aviakapital leasing in 2019.[8] Its early production rate is projected for 20 aircraft per year.[27]

In August 2017, the first prototype performed nine test flights, analysing stability and controllability in various configurations, altitude, altitude/speed sensors accuracy and engine operation. Its software is adjusted by the results as it is fitted with over 500 strain gauges measuring in-flight loading on the airframe, to verify the initial design, for "several weeks". A second prototype is finalised while three other prototypes are undergoing construction; production of 70 MC-21s annually is planned for 2024.[28] Irkut began the second testing phase on 13 September with an eventless 2-hour flight.[29] The phase will extend the mass, centering, speed and altitude envelope.[30]

In October 2017, the first prototype flew from Irkutsk Aviation Plant to Moscow Ramenskoye Airport to continue testing at the Gromov Flight Research Institute, a 6-hour flight over Шаблон:Cvt at Шаблон:Convert.[31] The flight test programme started on 2 November with a 3-hour flight reaching Шаблон:Convert.[32] Before being flown to Moscow, 20 flights were conducted in Irkutsk. In November, the second prototype was prepared for flight-tests, followed in 2018 by the third for which final assembly has started.[33]

EASA approval was targeted for mid-2020.[33] Certification testing was to start at the end of 2018 for a mid-2019 Russian type certification after a 1,150 flights effort. Entry into service was then planned for the second half of 2019 with the first five deliveries and within five years UAC plans to ramp up production to 70 aircraft per year.[34]

The second test aircraft was in final assembly in January 2018 and was to join the flight-test campaign in the first quarter.[34] It was to fly in late February or early March 2018.[35] Its construction was completed by March end.[36] It was scheduled to fly in April 2018, and the third in the 2018 fourth quarter.[37] It made its first flight on 12 May for 1 hour 7 minutes, reaching Шаблон:Convert and Шаблон:Convert, checking its landing gear retraction and testing wing configurations.[38] On 20 July 2018, it flew from Irkutsk to the Gromov Flight Research Institute near Moscow in six hours.[39]

Production started in 2018, certification slipped into late 2019 and the first delivery to 2020.[37] For three years after 2018, UAC plans to invest ₽56.4 billion ($899 million) for the MC-21.[40] By October 2018, two EASA test pilots and a test engineer test flew the plane in preparation for European certification.[41] On 3 December, a fuselage was delivered to the Central Aerohydrodynamic Institute at Moscow-Zhukovsky for fatigue testing: repetitive loads will simulate 180,000 cycles. By then, the third flying prototype was assembled, its systems installed and it was undergoing final adjustments, a fourth test aircraft was in assembly, as the first production fuselage.[42] After completing assembly, the third MC-21 was transferred to the flight-test station on 25 December.[43]

By early 2019, the two prototypes had completed 122 test sorties, and following international sanctions against Russia, 1.6 billion roubles ($24.2 million) of additional subsidies were allocated to the program for 2019, before 4.11 billion roubles in 2020 and 4.81 billion roubles in 2021: Russian content was aimed at 97% by 2022.[44] The program cost is 438 billion rubles (US$6.6 Bn)[44] In February 2019, the EASA completed initial certification testing with 2.5-to-4-hour flights up to Шаблон:Convert, including high angle-of-attack and stall onset.[45] By then, certification trials were expected to end in the second half of 2020 before first delivery to Aeroflot by year end.[46]

On 18 February 2019, Rostec delayed entry into service another year to 2021 due to US sanctions, while another 240–250 billion rubles ($3.62–3.78 billion) is needed to complete its development.[47] On 16 March 2019, the third test aircraft, which has been fully fitted out with a passenger cabin, made its maiden flight.[48] After painting at Ulyanovsk, on 13 May 2019 it joined the other two test aircraft at Moscow-Zhukovsky Airport, where the certification programme is being conducted.[49]

On 17 September 2019, the third test aircraft made its first international flight from Moscow-Zhukovsky to Istanbul Atatürk Airport.[50] The aircraft was presented to Turkish Airlines at Teknofest Istanbul, and co-production projects were proposed to Turkey.[51] The fourth flight-test aircraft was rolled out on 28 November 2019,[52] and performed its first flight on 25 December 2019.[53]

Transition to Russian-produced parts

In January 2020, Irkut received the first PD-14 engines for installation.[54] The PD-14-powered MC-21-310 made its maiden flight on 15 December from Irkutsk.[55]

In December 2021, Irkut carried out the maiden flight of the first MC-21 to be manufactured with domestically produced composite wings.[56]

By October 2022, Irkut had fitted the first flight test aircraft with PD-14 engines and other domestically produced components, and flown a test sortie in the new configuration. The aircraft will participate in the certification programme, targeted to be complete by the end of 2022.[57]

In 2022, after international sanctions against Russia were imposed due to the 2022 Russian invasion of Ukraine, Rosaviatsia announced that in a resulting change of plans Russia will only use a domestic engine.[58][59][60] The original model – the MC-21-300 powered by Pratt & Whitney PW1000G engines – will not enter service, and instead production will have to wait for the MC-21-310, powered by the Russian Aviadvigatel PD-14, built by the United Engine Corporation.[59][60] The MC-21-300 consists of between 40% and 50% imported parts, and Irkut will need to replace those that were to be supplied by the sanctioning countries.[59] The need to use Russian avionics will delay first shipment to either late 2024 or 2025.[59][60] As part of a plan announced in June 2022, aimed at bringing the proportion of domestically produced aircraft to 80% of the Russian fleet by the end of the decade, deliveries of the MC-21 are expected to start in 2024 and reach a delivery rate of 72 per year by 2029.[61]

Introduction

Aeroflot expected to lease 50 MC-21-300s from Aviakapital for 12 to 18 years and a monthly lease of less than $437,282 each.[62] By 2018, they were to be delivered from the first quarter of 2020 to the third quarter of 2026, with EASA certification targeted for early 2021.[62] Powered by PW1400Gs or possibly PD-14s for the second half, Irkut guaranteed less than Шаблон:Cvt fuel burn on a Шаблон:Cvt route with a Шаблон:Convert tailwind.[62] They were guaranteed to reach 2,100h and a dispatch reliability of 96% for the first year, rising to 2,900h and 97% in the second year then 3,750h and 98.5% in the third year.[62]

In October 2018, fuselage panels for the first customer MC-21 were completed by United Aircraft Corporation subsidiary Aviastar.[63] In early 2019, the annual output was targeted from 20 initially to 72 airframes in 2025, towards 100 and possibly 120 later for a forecast of 850 deliveries.[44]

In July 2021 it was reported that Aeroflot would launch the MC-21-300 with its regional subsidiary Rossiya Airlines in summer 2022.[64] In September 2021, Evgeny Ditrikh, CEO of GTLK (Public Transport Leasing Company of Russia), stated that the MC-21 project is in need of new government grants.[65]Шаблон:Better source neededШаблон:Importance inline

By the end of December 2021, Russian type certification was granted for the MC-21-300 variant powered by PW1400G engines, ahead of its planned introduction with its launch operator Rossiya.[66] Additional testing was still needed for high-altitude, strong crosswinds, and low and high temperatures operations.[66] The initial target market is for 800 airframes in Russia over the next 20 years.[66]

The aircraft was denied European certification on March 14, 2022.[67]

Design

Файл:MS-21 cabin mock up Beltyukov.jpg
Cabin mock-up in 2011
Файл:MS-21 cockpit mock up Beltyukov.jpg
Flight deck mock-up with a HUD

The design is based on the never-realized, twin-engine Yakovlev Yak-242 as a development of the three-engine Yakovlev Yak-42.[11]

Airframe

The United Aircraft Corporation (UAC) subsidiary AeroComposit developed the vacuum infusion process to produce the wingbox and wing panels. The vertical and horizontal fins and wingbox are also composite and the high aspect ratio wing is a supercritical airfoil.[8] The MC-21 design is more innovative than the C919: it is the only airliner with a carbon fibre wingbox made with resin infused dry fibre, cured in an oven out of autoclave.[68] The initial design included ~33% composite materials, increasing to 40–45% with the composite wing.

By January 2019, U.S. sanctions against Russia have interrupted the supply of foreign raw materials, on which the UAC relied to produce composite parts. The UAC started looking for either domestically produced or Chinese replacements, maintaining that the wing box and consoles would still consist of polymeric composites. By then, a metal wing was "no longer on the agenda" according to the Central Aerohydrodynamic Institute (TsAGI).[69] In March 2019, AeroComposit reported that it had produced the first fuselage centre section and wing box from domestic materials.[70]Шаблон:Better source needed

The fuselage of the MC-21 is mostly made of lightweight aluminium–lithium alloy, which accounts for 40% of the airframe's structural weight.[71] It is Шаблон:Cvt wider than the A320/C919 and Шаблон:Cvt wider than the 737, for a Шаблон:Cvt aisle allowing passing others or a trolley.[68] Its Шаблон:Cvt MTOW is the same as the almost 5 m (16.5 ft.) shorter A320neo, and is Шаблон:Cvt lighter than the almost Шаблон:Cvt shorter 737-8, for similar two-class layouts of 162 to 165 while the 737-8 and A320neo have Шаблон:Cvt more range.[34]

Engines

Файл:Two MC-21 with engines PW1000G and PD-14.jpg
A МС-21-300 powered by PW1400Gs (right) and a МС-21-310 powered by PD-14 engines (left)

The Шаблон:Cvt thrust class Pratt & Whitney PW1000G was selected in December 2009.[72] The design configuration now calls for the PW1400G-JM geared turbo fan engine to be installed on one version.Шаблон:Citation needed Russia decided to have both an internal and external supplier for the engine and nacelle for greater flexibility in controlling rate and price.Шаблон:Citation needed

The Russian engine will be the Шаблон:Cvt Aviadvigatel PD-14.[73] United Engine Corporation (UEC) planned to deliver five PD-14s for the MC-21 by the end of 2018, to start flight tests in 2019 for the MC-21 variant certification in 2021.[74] By October 2018, the PD-14 had received its Rosaviatsia type certification.[75] By October 2019, PD-14 flight-testing on the MC-21 was delayed until 2020.[76]

Systems

In August 2009, Hamilton Sundstrand, a subsidiary of United Technologies, announced it will provide electric power generation and distribution equipment for $2.3 billion over 20 years of production.[77] Rockwell Collins and its Russian partner Avionika were selected to supply the MC-21's avionics.[78] Honeywell, Thales and Elbit Systems supply avionics with nine 12-inch multifunction displays, electronic flight bags, synthetic vision and enhanced vision systems. The MC-21 will be the first airliner with active side-sticks, supplied by UTC Aerospace Systems.[8] It has Fly-By-Wire controls.[68] It has a glass cockpit with side-stick controls and an optional Head-up display.

Goodrich Corporation, also a subsidiary of United Technologies, along with Aviapribor was selected to provide the flight control system actuators.[79] Zodiac Aerospace, Eaton and Meggitt provide other components.[8] Interior furnishings will come from Zodiac Aerospace, coordinated from C&D Zodiac in Huntington Beach, California. Innovations from Zodiac Aerospace in Carson, California, will be incorporated in the water and waste systems.

There are two types of auxiliary power units (APU) designed with specifications suitable for MC-21: HGT750 from Honeywell Aerospace[80] and TA18-200 developed by Aerosila.[81]

Component suppliers

Initially it was assumed that the share of domestic components for the MC-21 would be 38%,Шаблон:Cn but due to sanctions in the wake of the 2022 Russian invasion of Ukraine the Russian government ordered a target figure of 98% by 2023, making it independent of imported components.[6]

In July 2021 a composite wing made of Russian materials was docked to the fuselage of the aircraft.[82]

The fuselage is designed and manufactured by Irkut Corporation and Yakovlev Design.[83]

The chassis were supplied by the company "Hydromash" from Nizhny Novgorod.[84]

The cockpit and part of the aircraft's avionics were developed and supplied by the Concern Radio-Electronic Technologies and Rockwell Collins with the participation of personnel from the Russian company "Avionika".[85]

It is possible to use both imported APU and the Russian one developed and produced in NPP "Aerosila".[86]

For personnel training, the Scientific and Production Russian Company "Systems of Complex Simulators" developed and manufactured a number of simulators, including a number of flight simulators of different degrees of realism, emergency procedures simulator, firefighting simulator, service simulator, engineering simulator for technician training.[87]

Variants

In 2009, the MC-21-200 was designed around 150 passengers in single-class configuration, to be followed by a 181-seat -300 and 212-seat -400 with basic and extended-range models, plus a very-long-range -200LR.[14]

MC-21-300
Standard model with PW1400G engine, 163 passengers in two class, up to 211, up to Шаблон:Cvt range, powered by Pratt & Whitney PW1400G engines. The first flight was made on 28 May 2017; six aircraft were built.
MC-21-310
Standard model with PD-14 engines,[88] The first flight was made on December 15, 2020; one aircraft has been built. The second aircraft is a remotorization of a previous MC-21 with imported engines.[89]

Proposed

Initially a 132-seats MC-21-100 variant was planned but then superseded by the Superjet 100 development.[90] The small variant with a capacity of 130- to 150-seat was proposed with commonality with the Sukhoi Superjet 130.[91]

UAC considers more developments for the MC-21 by 2035. These include: a -400 with Шаблон:Cvt engines for a Шаблон:Cvt MTOW, a -500, a -600 with Шаблон:Cvt engines, and a -700 with Шаблон:Cvt engines, as well as a MC-21X with a Шаблон:Cvt tons MTOW for a Шаблон:Cvt km range.[92]Шаблон:Better source needed Ilyushin Finance wants a MC-21-400 stretch for up to 256 seats and plans to buy 20 to 60 of them.[93] The 250-passenger MC-21-400 single-aisle twinjet could be jointly produced in the United Arab Emirates.[94]

Variants with PD-14 engines will be designated MC-21-310 and MC-21-210.[95]

МС-21-200
Shortened version with 132 passengers in two class, up to 165, up to Шаблон:Cvt range, powered by Pratt & Whitney PW1400G engines.
МС-21-210
Similar to MC-21-200, with PD-14 engines.
МС-21-300LR
Modification of MC-21-300 with increased range up to Шаблон:Cvt and PD-18R engines.Шаблон:Cn
МС-21-400
Enlarged version with a capacity of up to 256 seats in a single-class configuration. The aircraft is supposed to be equipped with PD-14M engines.
МС-21-400LR
Modification of MC-21-400 with increased range up to Шаблон:Cvt and PD-18R engines.Шаблон:Cn

Orders

By the end of the 2013 MAKS Air Show, there were 175 firm orders including 50 for Rostec subsidiary Aviakapital leased to Aeroflot and 35 more with PD-14 engines for governmental customers, 50 for Ilyushin Finance (10 to be leased to Red Wings Airlines and six to Transaero), 30 for VEB Leasing (10 to be leased to UTair Aviation and 6 to Transaero) and 10 for IrAero with an agreement for 20 others leased from Sberbank of Russia, for a potential 195 orders.[96] Transaero bankrupted in 2015.

In June 2016, Azerbaijan Airlines tentatively signed to lease ten -300s from Ilyushin Finance.[97] By July 2018, 175 firm orders and nearly 150 intentions had been recorded.[98]

At the 2019 MAKS Air Show, at Zhukovsky International Airport, Moscow, Bek Air signed a letter of intent for ten Irkut MC-21 aircraft, Yakutia Airlines likewise signed for five aircraft and an undisclosed customer for a further five aircraft. Delivery of the new aircraft was expected to be in the second half of 2021.[99]

Date Airline EIS Orders
-200 -300 Options Total
21 Jul 2010 Шаблон:Flagicon Nordwind Airlines TBA 3 2 5
21 Jul 2010 Шаблон:Flagicon VEB Leasing TBA 30 30 60
1 Sep 2010 Шаблон:Flagicon Aeroflot 2024[100] 50 50[101]
18 Aug 2011 Шаблон:Flagicon Ilyushin Finance 2024 28 22 50[102]
23 Aug 2011 Шаблон:Flagicon Rostec 2024 15 35 35 85[103]
16 Sep 2011 Шаблон:Flagicon IrAero 2024[104][105] 10 10 20[106]Шаблон:Efn
27 Aug 2013 Шаблон:Flagicon Utair TBA 10 10Шаблон:Efn
29 Aug 2013 Шаблон:Flagicon Sberbank Leasing TBA 20 20[107]
30 Aug 2013 Шаблон:Flagicon Red Wings Airlines 2024 16 16[108]Шаблон:Efn
8 Jun 2016 Шаблон:Flagicon Azerbaijan Airlines TBA 10 10[97]
19 Jul 2017 Шаблон:Flagicon Angara Airlines TBA 3 3[109]
19 Jul 2017 Шаблон:Flagicon ALROSA 2023 3 3 6[110][111]Шаблон:Efn
Total without duplicates 175[98]
Letters of Intention signed
30 August 2019 Шаблон:Flagicon Yakutia Airlines 2024[112] 5+ 5[113]
7 Jun 2022 Шаблон:Flagicon Aeroflot TBA 100+ 100+[114]Шаблон:Bsn
30 August 2019 Unknown customer TBA 5[115] 5[116]
Total without duplicates 140+[117]

Шаблон:Notelist

Accidents and incidents

On 18 January 2021, an MC-21-300 (prototype 73051) experienced a runway excursion at Zhukovsky Aerodrome and came to a stop in heavy snow during testing. There were no injuries to the crew.[118]

Specifications

MC-21 aircraft family specifications and performance[119]
Variant MC-21-200 MC-21-300
Cockpit crew 2
2-class seats 132 (12J + 120Y) 163 (16J + 147Y)
1-class seats 165 @ 29–28" 211 @ 29–28"
Cargo capacity Шаблон:Cvt – 5 LD3-45 Шаблон:Cvt – 9 LD3-45
Length Шаблон:Cvt Шаблон:Cvt
Wingspan Шаблон:Cvt
Height Шаблон:Cvt
Fuselage width Шаблон:Cvt
Cabin width Шаблон:Cvt
Runway Length 2,200m
Maximum take-off weight Шаблон:Cvt Шаблон:Cvt
Maximum landing weight Шаблон:Cvt Шаблон:Cvt
Maximum payload Шаблон:Cvt Шаблон:Cvt
Fuel capacity Шаблон:Cvt
Turbofans (x 2) Aviadvigatel PD-14[120]
Max. thrust (x 2) PW1428G: Шаблон:Cvt PW1431G: Шаблон:Cvt
2-class range Шаблон:Cvt Шаблон:Cvt

See also

Шаблон:Portal Шаблон:Aircontent

Notes

Шаблон:Notelist

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:Yakovlev aircraft

  1. Шаблон:Cite web
  2. Шаблон:Cite web
  3. Шаблон:Cite web
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. 6,0 6,1 Шаблон:Cite web
  7. Шаблон:Cite web
  8. 8,0 8,1 8,2 8,3 8,4 8,5 8,6 8,7 Шаблон:Cite news
  9. 9,0 9,1 Шаблон:Cite news
  10. Шаблон:Cite news
  11. 11,0 11,1 Шаблон:Cite news
  12. Шаблон:Cite news
  13. Шаблон:Cite news
  14. 14,0 14,1 Шаблон:Cite news
  15. Шаблон:Cite news
  16. Шаблон:Cite web
  17. Шаблон:Cite news
  18. Шаблон:Cite news
  19. Шаблон:Cite news
  20. Шаблон:Cite news
  21. Шаблон:Cite news
  22. Шаблон:Cite news
  23. Ошибка цитирования Неверный тег <ref>; для сносок 28May2017PR не указан текст
  24. Шаблон:Cite news
  25. Шаблон:Cite web
  26. Шаблон:Cite news
  27. Шаблон:Cite news
  28. Шаблон:Cite news
  29. Шаблон:Cite news
  30. Шаблон:Cite press release
  31. Шаблон:Cite news
  32. Шаблон:Cite news
  33. 33,0 33,1 Шаблон:Cite news
  34. 34,0 34,1 34,2 Шаблон:Cite news
  35. Шаблон:Cite news
  36. Шаблон:Cite press release
  37. 37,0 37,1 Шаблон:Cite news
  38. Шаблон:Cite news
  39. Шаблон:Cite press release
  40. Шаблон:Cite news
  41. Шаблон:Cite news
  42. Шаблон:Cite news
  43. Шаблон:Cite news
  44. 44,0 44,1 44,2 Шаблон:Cite news
  45. Шаблон:Cite news
  46. Шаблон:Cite news
  47. Шаблон:Cite news
  48. Шаблон:Cite news
  49. Шаблон:Cite news
  50. Шаблон:Cite news
  51. Шаблон:Cite news
  52. Шаблон:Cite news
  53. Шаблон:Cite press release
  54. Шаблон:Cite news
  55. Шаблон:Cite news
  56. Шаблон:Cite news
  57. Шаблон:Cite news
  58. Шаблон:Cite web
  59. 59,0 59,1 59,2 59,3 Шаблон:Cite web
  60. 60,0 60,1 60,2 Шаблон:Cite web
  61. Шаблон:Cite news
  62. 62,0 62,1 62,2 62,3 Шаблон:Cite news
  63. Шаблон:Cite news
  64. Шаблон:Cite news
  65. Шаблон:Cite web
  66. 66,0 66,1 66,2 Шаблон:Cite news
  67. Шаблон:Cite web
  68. 68,0 68,1 68,2 Шаблон:Cite news
  69. Шаблон:Cite news
  70. Шаблон:Cite news
  71. Шаблон:Cite news
  72. Шаблон:Cite press release
  73. Шаблон:Cite press release
  74. Шаблон:Cite news
  75. Шаблон:Cite news
  76. Шаблон:Cite news
  77. Шаблон:Cite news
  78. Шаблон:Cite news
  79. Шаблон:Cite news
  80. Шаблон:Cite web
  81. Шаблон:Cite web
  82. Шаблон:Cite web
  83. Шаблон:Cite web
  84. Шаблон:Cite web
  85. Шаблон:Cite web
  86. Шаблон:Cite web
  87. Шаблон:Cite web
  88. Шаблон:Cite news
  89. Шаблон:Cite news
  90. Шаблон:Cite news
  91. Шаблон:Cite news
  92. Шаблон:Cite news
  93. Шаблон:Cite news
  94. Шаблон:Cite news
  95. Шаблон:Cite web
  96. Шаблон:Cite web
  97. 97,0 97,1 Шаблон:Cite news
  98. 98,0 98,1 Шаблон:Cite web
  99. Шаблон:Cite journal
  100. Шаблон:Cite web
  101. Шаблон:Cite web
  102. Шаблон:Cite news
  103. Шаблон:Cite news
  104. Шаблон:Cite web
  105. Шаблон:Cite web
  106. Шаблон:Cite news
  107. Шаблон:Cite news
  108. Шаблон:Cite news
  109. Шаблон:Cite news
  110. Шаблон:Cite web
  111. Шаблон:Cite web
  112. Шаблон:Cite web
  113. Шаблон:Cite news
  114. Шаблон:Cite web
  115. Шаблон:Cite web
  116. Шаблон:Cite web
  117. Шаблон:Cite web
  118. Irkut MC-21 Suffers Runway Overrun Шаблон:Webarchive, AINonline, by Gregory Polek, January 18, 2021, 3:54 PM
  119. Шаблон:Cite web
  120. Шаблон:Cite web