The Istanbul Metro (Шаблон:Lang-tr) is a rapid transit railway network that serves the city of Istanbul, Turkey. Apart from the M11 line, which is operated by TCDD Taşımacılık, the system is operated by Metro Istanbul, a public enterprise controlled by the Istanbul Metropolitan Municipality. The oldest section of the metro is the M1 line, which opened in 1989. As of March 2024, the system now includes 158 stations in service,[2] with 36 more under construction. Istanbul is the city with the 22nd longest metro line in the world and the 4th in Europe. [3]

The system consists of eleven lines: the lines designated M1A, M1B, M2, M3, M6, M7, M9 and M11 are on the European side of the Bosporus, while lines M4, M5 and M8 are on the Asian side. Due to Istanbul's unique geography and the depth of the Bosporus strait which divides the city, the European and Asian metro networks do not connect directly. The two parts of the city are linked through the Marmaray commuter rail line, which is connected to the metro in several places. Three metro lines are under construction on the Asian side: M10 (Pendik Merkez–Fevzi Çakmak), M12 (60. Yıl Parkı–Kazım Karabekir) and M14 (Altunizade–Kazım Karabekir). Additionally, extension works on the M7 and M11 lines (on the European side) and the M4 and M5 lines (on the Asian side) are underway.

In addition to the Marmaray commuter rail, the metro connects to the F1, Tünel (F2), F3 and F4 funicular lines and with the network of the Istanbul Tram[4], Metrobüs and the cable cars.

History

Файл:Istanbul asv2020-02 img01 Tünel Karaköy station.jpg
Karaköy station of the Tünel, which entered service on 17 January 1875.

The oldest underground urban rail line in Istanbul is the Tünel, which entered service on 17 January 1875.[5] It is the world's second-oldest underground urban rail line after the London Underground which was built in 1863,[6] and the first underground urban rail line in continental Europe.

The first master plan for a full metro network in Istanbul, titled Avant Projet d'un Métropolitain à Constantinople and conceived by the French engineer L. Guerby, dates to 10 January 1912.[7] The plan comprised a total of 24 stations between the Topkapı and Şişli districts and included a connection through the Golden Horn. Each station would have a Шаблон:Convert platform next to the rail line, while the distance between stations varied from Шаблон:Convert. The blueprints of the project, which was never realized, are today displayed at the Istanbul Technical University Museum.

In 1936 the French urban planner Henri Prost proposed a metro network between the districts of Taksim and Beyazıt, to the north and south of the Golden Horn, respectively.[8][9] In October 1951 the Dutch firm Nedeco proposed a similar route between Taksim and Beyazıt, and in September 1952 the Director of the Paris Transportation Department, Marc Langevin, prepared a 14-chapter report together with his associate Louis Meizzonet for the implementation of the project and its integration with the other means of public transportation in the city. However, these plans never came into effect and all proposals were put on hold until 1987, when the planning for the current Istanbul Metro was made.Шаблон:Multiple image

Construction works for the first 'modern' mass transit railway system started in 1989, with the first stations opening in September. İstanbul Ulaşım A.Ş. (now known as Metro Istanbul) was founded the previous year to operate the system. The M1 was initially called "Hafif Metro" (which literally translates as "light metro"). Although it was built as a fully grade separated line, the M1 line operates with shorter trainsets and shorter station platforms than is standard on a traditional metro line, hence its "light metro" designation. The M1 line was later extended from Aksaray towards the western suburbs, reaching Atatürk Airport in the southwest in 2002.[10]

Construction of the M2 line began on 11 September 1992, but faced many challenges due to the numerous archaeological sites that were discovered during the drilling process, which slowed down or fully stopped the construction of many stations, especially in the south. Taking into account the seismic activity in Istanbul, the entire network was built with the cut-and-cover methodШаблон:Citation needed to withstand an earthquake of up to 9.0 on the Richter magnitude scale.[11][12]

Файл:GoldenHornMetroBridge 09.JPG
The Golden Horn Metro Bridge entered service in 2014.

The first section between Taksim and 4. Levent entered service, after some delays, on 16 September 2000. This line is Шаблон:Convert long and has 6 stations, which all look similar but are in different colours. In 2000, there were 8 Alstom-built 4-car train sets in service, which ran every 5 minutes on average and transported 130,000 passengers daily. On 30 January 2009, the first train sets built by Eurotem entered service.[13] Eurotem will build a total of 92 new trainsets for the M2 line.[13][14] As of 30 January 2009, a total of 34 trainsets, each with 4 cars, were being used on the M2 line.[14] A northern extension from 4. Levent to Maslak was opened on 30 January 2009.[15] On 2 September 2010, the northern (temporary) terminus of Darüşşafaka followed up.[16] The southern extension of the M2 line from Taksim to Yenikapı, across the Golden Horn with Haliç station on the bridge and underground through the historic peninsula, entered service on 15 February 2014. The Taksim-Yenikapı extension is Шаблон:Convert long, with four stations. The total cost of the extension was $593 million.[17] At Yenikapı, it will intersect with the extended M1 line and the Marmaray commuter line, which since its opening in 2013 has offered a connection between the Asian and European sides of the city.

Файл:İstanbul Havalimanı Station (4).jpg
M11 Istanbul Airport Station

The trip between the Şişhane station in Beyoğlu and the Haciosman station in Maslak is Шаблон:Convert long and takes 27 minutes; including Şişhane - Taksim (Шаблон:Convert, 2 minutes), Taksim - 4. Levent (Шаблон:Convert, 12 minutes), and 4. Levent - Haciosman (Шаблон:Convert, 12 minutes.)[18][19] The total length of the European side of the M2 line will reach Шаблон:Convert when all 16 stations from Hacıosman to Yenikapı will be completed;[20][21][22] not including the Шаблон:Convert-long Golden Horn Metro Bridge,[23] the Шаблон:Convert long Taksim-Kabataş tunnel connection with the Seabus port,[24] and the Шаблон:Convert long Yenikapı-Aksaray tunnel connecting the M1 line to the Yenikapı Transfer Center.[22]

On the Asian side, construction is in progress of the remaining portion of the Шаблон:Convert long M4 line from Kadıköy to Kaynarca, yielding a total of 19 stations. It cost €751 million and was built by the Astaldi / Makyol / Gülermak consortium.[25] The first section opened on 17 August 2012, terminating in Kartal. Construction of the Шаблон:Convert long M5 line from Üsküdar via Ümraniye to Çekmeköy started in March 2012.[26]

Operations

Файл:Üsküdar metro 2.jpg
Üsküdar metro station on the M5 line

The Metro operates from 06:00 AM to 00.00 AM every 6–12 minutes, except for the M8 line, which temporarily operates from 06:00 AM to 23:00 PM.[27] During peak hours the intervals could be reduced to 3 to 4 minutes.

The metro has a flat fare of 9.90 TL.Шаблон:Update after when used with the Istanbulkart, the city's universal contactless payment card.[28] Discounts or free cards are available to students, seniors and veterans.

Night operations

Файл:IstanbulMetroM4.jpg
Sabiha Gökçen Station on the M4 line

On 30 August 2019 as a gesture for the Victory Day of Turkey, Mayor of Istanbul, Ekrem İmamoğlu, announced that many lines of Istanbul were going to provide 24 hours service during the weekends with trains at 20 minutes interval.[29][30][31] Since August 2019, the Istanbul Metro started to provide 24 hours service for some lines on weekends and public holidays,[32] but this service was discontinued in March 2020 due to coronavirus pandemic. On March 5, 2022 Metro Istanbul announced that the night metro service would be re-started on the following lines: M1A Yenikapı-Atatürk Airport, M1B Yenikapı-Kirazli, M2 Yenikapı-Hacıosman, M4 Kadıköy-Sabiha Gökçen Airport, M5 Üsküdar-Çekmeköy, and M6 Levent-Boğaziçi University/Hisarüstü,[33] and later added M7 Mecidiyeköy-Mahmutbey on July 14, 2022.[34]

Lines

Each line is given a different color and name. The letter "M" stands for metro, while "T" stands for tram, "F" stands for funicular, "TF" stands for cable car and "B" for suburban. Frutiger LT Pro is used as the font for the icons.

Line Route Side Opened(first) Length Stations Notes[35]
Файл:Istanbul M1 Line Symbol (2020).svg
Yenikapı ↔ Atatürk Airport / Kirazlı European 1989[36] 26.8 km[37] 23[36]
  • Branches diverge at Otogar. Branch M1A runs to Atatürk Airport. Branch M1B runs to Kirazlı, with an extension to Halkalı currently on hold.
  • The line operates from 06:00 AM to 00.00 AM.
  • Trains are currently four cars in length, 5 car trains will run in the future
Файл:Istanbul M2 Line Symbol (2020).svg
Yenikapı ↔ Hacıosman European 2000[38] 23.49 km[37] 16[38]
  • There is a branch line between Sanayi Mahallesi and Seyrantepe.
  • Operates from 06:00 AM to 00:00 AM.
  • Maximum 8 car trains, 4 car trains during off peak
Файл:Istanbul M3 Line Symbol (2020).svg
Bakırköy-Sahil ↔ Kayaşehir Merkez European 2013[39] 26.7 km[37] 19[39]
  • Operates from 06:00 AM to 00.00 AM.
  • Yıldıztepe station is under construction.
  • Physical maximum 8 car trains (only 4 car trains used at this point due to ridership)
Файл:Istanbul M4 Line Symbol (2020).svg
Kadıköy ↔ Sabiha Gökçen Airport Asian 2012[40] 33.5 km[40] 23[40]
  • An extension to Tuzla with 6 more stations is under construction.
  • Operates from 06:00 AM to 00.00 AM.
  • Maximum 8 car trains, 4 car trains used during off peak
Файл:Istanbul M5 Line Symbol (2020).svg
Üsküdar ↔ Samandıra Merkez Asian 2017[41] 26.5 km[41] 20[41]
  • An extension 4.4 km from Samandıra Merkez to Sultanbeyli is under construction.
  • Sancaktepe Şehir Hastanesi station is under construction.
  • Operates from 06:00 AM to 00.00 AM.
  • Maximum 6 car trains, fully automated
Файл:Istanbul M6 Line Symbol (2020).svg
Levent ↔ Boğaziçi Üniversitesi/Hisarüstü European 2015[42] 3.3 km[42] 4[42]
  • Called the "Mini-Metro", M6 is actually a light metro line.
  • Single track between stations, maximum 4 car trains
Файл:Istanbul M7 Line Symbol (2020).svg
Yıldız ↔ Mahmutbey European 2020[43] 20 km[43] 17[43]
  • Opened partially on 28 October 2020. Fulya and Yıldız stations were put into service on January 2, 2023. Yıldız-Kabataş section is still under construction.
  • Physical maximum 8 car trains, but only 4 car trains used at the moment, fully automated
Файл:Istanbul M8 Line Symbol (2020).svg
Bostancı ↔ Parseller Asian 2023[44] 14.27 km[44] 13[44]
  • Opened on 6 January 2023.
  • Medium capacity system, maximum 4 car trains, fully automated
Файл:Istanbul M9 Line Symbol (2020).svg
Olimpiyat ↔ Ataköy European 2021[45] 17.2 km[45] 13[45]
  • Opened partially on 29 May 2021 between Olimpiyat and Bahariye stations. On 18 March 2024, the line was fully put into service between Olimpiyat and Ataköy stations.
  • Physical maximum 4 car trains
  • Mimar Sinan station is still under construction.
Файл:Istanbul M11 Line Symbol (2020).svg
Gayrettepe ↔ Arnavutköy Hastane European 2023[46] 51.5 km[46] 10[46]
  • Extension from Arnavutköy Hastane to Halkalı is under construction.
  • Higher maximum speed (120 km) than other lines, uses metro trains akin to Chinese metro type B trains in 4 car configuration
TOTAL: 243.26 km[37] 158[2]

Stations

Шаблон:Main Шаблон:Multiple image

The Istanbul Metro system has a total of 158 stations in operation with 36 more under construction. Since the majority of the system is underground, stations are generally accessed going down from street level. At every station entrance there is a post with the Istanbul metro "M" logo and the station name underneath it except for the M11 line which has the "U" logo next to its own entrances.[47][48] Entrances are usually built into sidewalks along a street, although many stations of newer lines have their entrances from street level on small plazas.

Out of the 158 operating stations of the Istanbul Metro:

  • 142 are fully underground
  • 7 are elevated stations
  • 7 are on an embankment or at-grade
  • 2 are partially underground

Mezzanines

Файл:Yenikapi metro station 6244.jpg
The mezzanine concourse at Yenikapı station (M1 and M2)

Most stations have a mezzanine directly below street level, which allows passengers to enter the stations from multiple locations and proceed to the correct platform without having to cross any streets. Inside the mezzanines are ticket machines and turnstiles, where passengers must pay to enter fare control zones and proceed to the trains.[49][50]

In some stations, mezzanines connect directly to nearby buildings and structures, such as shopping malls or business centres. Each station concourse or mezzanine are patrolled by Istanbul Metro security guards to prevent fare evasion and crime.

Stations with large walkways toward different exits, such as Taksim, also have travelators to cover the long walking distances.

Upon entering the station, passengers may use ticket vending machines or staffed ticket booths to purchase their fare, which can be stored on the Istanbulkart contactless smart card. After entering the fare-controlled area, via the turnstiles, passengers may continue further down to the platform level.

Platforms

Шаблон:Multiple image

Since the different lines of the Istanbul Metro have different specifications, most notably car length, there is no uniform length for platforms. The oldest platforms of the network, built between 1989 and 2002 on the M1 line, are Шаблон:Convert and can accommodate trains up to 4 cars long. Platforms on the M2, M3, M4, M7 and M11 lines span about Шаблон:Convert and can each accommodate trains up to 8 cars long. Platforms on the M5 line can accommodate up to 6-car trains, whiles platforms on the M6, M8, and M9 lines are accommodate 4-car trains.

Sections of platforms are subject to close during off-peak hours, especially on the M2 line. While platforms on the M2 line are open fully during peak hours, capacity is reduced to 4-car trains during off-peak hours. Platforms on the M5, M7, M8 and M11 lines are protected by platform edge doors. Except on funicular lines, most platforms of the Istanbul Metro consist of two side platforms or one island platform. Five stations consist of two island platforms, serving three tracks in a configuration known as the Spanish Solution. These stations are Otogar on the M1 line, Yenikapı and Sanayi on the M2 line, Olimpiyat on the M9 line, and Bostancı on the M4 line.

Design

The stations on the M1 line, which were built in the 1980s and 1990s, are very functional and plain in design. Like many stations built during this period, the stations use fluorescent tubes as light sources, and are decorated with tiled floors and ceiling panels made of white plastic ceiling slats. Platforms of stations on the M1 line are supported by square and tiled central columns (e.g. Aksaray, Emniyet - Fatih and Topkapı - Ulubatlı.)

Stations on the M2 line built between 2000 and 2011, care was taken to use light colors. For this reason, the basic wall color of the stations is white. In order to make people not confuse the stations and to make them more memorable, some characteristic patterns were also implemented. (e.g. colored stripes/tiles on walls).

Stations on the M7 line, which were built between 2017 and 2020, mostly use a combination of gray and white colors. Since the line has fully automated driverless vehicles, passengers are prevented from falling onto the tracks by using platform screen doors (PSDs).

Technical specifications

This table lists technical characteristics of the metro lines that are currently in service or under construction.

Line Route Gauge Voltage Conductor system Notes
Файл:Istanbul M1A Line Symbol (2020).svg
Yenikapı ↔ Atatürk Airport Шаблон:RailGauge 750 V DC Overhead line Light Metro
Файл:Istanbul M1B Line Symbol (2020).svg
Yenikapı ↔ Kirazlı
Файл:Istanbul M2 Line Symbol (2020).svg
Yenikapı ↔ Hacıosman Third rail
Файл:Istanbul M3 Line Symbol (2020).svg
Bakırköy-Sahil ↔ Kayaşehir Merkez 1,500 V DC Overhead line
Файл:Istanbul M4 Line Symbol (2020).svg
Kadıköy ↔ Sabiha Gökçen Airport
Файл:Istanbul M5 Line Symbol (2020).svg
Üsküdar ↔ Samandıra Merkez 750 V DC The first driverless metro in Turkey
Файл:Istanbul M6 Line Symbol (2020).svg
Levent ↔ Boğaziçi Üniversitesi Hisarüstü Third rail Mini light Metro
Файл:Istanbul M7 Line Symbol (2020).svg
Yıldız ↔ Mahmutbey 1,500 V DC Overhead line The first driverless metro in Istanbul European Side
Файл:Istanbul M8 Line Symbol (2020).svg
Bostancı ↔ Parseller Driverless metro
Файл:Istanbul M9 Line Symbol (2020).svg
Olimpiyat ↔ Ataköy
Файл:Istanbul M10 Line Symbol (2020).svg
Pendik YHT ↔ Sabiha Gökçen Airport Under Construction
Файл:Istanbul M11 Line Symbol (2020).svg
Gayrettepe ↔ Halkalı Operated by TCDD
Файл:Istanbul M12 Line Symbol (2020).svg
60. Yıl Parkı ↔ Kazım Karabekir Under Construction
Файл:Istanbul M13 Line Symbol (2020).svg
Söğütlüçeşme ↔ Yenidoğan Partially Under Construction
Файл:Istanbul M14 Line Symbol.svg
Altunizade ↔ Küçüksu Partially Under Construction
Файл:Istanbul M20 Line Symbol.svg
Sefaköy – TÜYAP Planned
Файл:Istanbul M34 Line Symbol.svg
Beylikdüzü ↔ Sabiha Gökçen Havalimanı Hızray Project (Planned)

Alignment and interchanges

Файл:Mahmutbey Metro Station.jpg
M3 Mahmutbey Metro Station
Файл:Ayrılıkçeşmesi M4.JPG
M4 Ayrılıkçeşmesi Metro Station

Apart from the Haliç station on the M2 line, about half of the M1 (mostly M1A) line, Alibeyköy and Kağıthane valleys crossing by the M7 line, viaduct section at Menekşe River of the M3 line and viaduct section at Olimpiyat of the M9 line, the lines are fully underground. All station names are on the bus lines as well.

The M2 line has an interchange between F1 in Taksim and an interchange tunnel with the Zincirlikuyu Metrobus station at the Gayrettepe station.[51] There is also a transfer station at Yenikapı with Marmaray, M1 line and İDO Ferry Port; from where it is possible to take the high-speed catamaran Seabus departing for Bursa, Bandırma or Yalova; as well as the other Seabus ports of Istanbul such as Bostancı, Kadıköy, Bakırköy and Kabataş.

The M3 line has an interchange with the M9 line at the İkitelli Sanayi station, M7 line at the Mahmutbey station, M1 line at the Kirazlı station, M2, M1 and Metrobus at the İncirli station, and lastly Marmaray (B1) and YHT at Özgürlük Meydanı Station,

The M4 line has a vapur (traditional ferry), motorboat, İDO and nostalgic tram interchange at Kadıköy which is the heart of Istanbul's Asian side. One can also interchange to Marmaray at the Ayrılık Ceşmesi station. Also at Ünalan / Uzunçayır, the line has a Metrobus interchange just like Gayrettepe in M2.

The M5 line has an interchange with the Marmaray and İDO at the Üsküdar station. Also at Altunizade the line has a Metrobus interchange.

The M6 line has an interchange with the M2 line at the Levent station.

The M7 line interchanges with the M2 line at the Mecidiyeköy station, with the T4 tramway line at the Kiptaş-Venezia/Karadeniz station, and with the M3 at the Mahmutbey station.

The M8 line has an interchange with the Marmaray at the Bostancı station, with the M4 line at the Kozyatağı station and with the M5 line at the Dudullu station.

The M9 has an interchange with the M3 at Ikitelli station.

The M11 line interchanges with the M2 line and Metrobus at Gayrettepe station, and with the M7 line at Kağıthane station.

Rolling stock

Шаблон:Expand section Aside from running on standard gauge tracks and all models having 4 doors per side, the rolling stock is generally incompatible, with few track connections to other lines and rolling stock generally will never run on any line other than whatever they first were delivered to. As each line is generally self-contained, this has rarely become an issue.

History

Файл:M7 Tren içi.jpg
Interior of M7 rolling stock

The first Istanbul full metro rolling stocks, which entered service on 16 September 2000, on the Taksim - 4. Levent line, were built by Alstom. These trains are air-conditioned and equipped with LCD screens, and share a similar exterior design to the first three generations of rolling stock used on the Caracas Metro in Venezuela.

On 30 January 2009, the first 8 trains (each with 4 wagons) built by Eurotem (the Turkish factory of Hyundai Rotem) entered service.[52] Today the system has 268 trains.[2] These trains are also air conditioned and equipped with LCD screens, as well as dynamic route map showing the location and direction of the train.[53]

In September 2009, CAF signed a contract to supply 144 units for the M4 metro line, amounting to 1.1 million euros. These metro units are formed with 4 cars for a total length of 90 meters and have a maximum transport capacity of 1300 passengers.[54]

In August 2013, tender for the 126 driverless train units for the M5 line was won by CAF and Mitsubishi with 119 million euros.[55] The first units were delivered in November 2016.[56]

In March 2016, Eurotem signed a contract to supply 300 driverless units for the M7 line, amounting to 280.200.000 euros.[57]

Rolling stocks by line

M1ᴀ and M1ʙ

Although line M1 is a (light) metro line, its rolling stock—in use since 1989—is made up of typical ABB light rail vehicles (LRVs). These are partly the same as those used on the T4 tramway line. The rolling stock of the line is planned to be refurbished and made driverless.[58][59]

M2

The rolling stock on the M2 line, which totals a number of 192 units,[59] is made up of Alstom vehicles from France and Hyundai Rotem vehicles from South Korea which are manufactured in Adapazarı by Eurotem. All wagons have 8 double doors, making them have 4 openings on each side per wagon, the rolling stock also includes a fast passenger change, heating, air conditioning and broadcasting system.

M3

The rolling stock on the M3 line, consists of 68 Alstom Metropolis AM4 (the same vehicles are used at M4 Budapest Metro) units. Some of them are also used on the M9 Ataköy-Olimpiyat metro line.

Future extensions

As part of the Istanbul Metropolitan Municipality goal of expanding the size of the city rail transportation network to Шаблон:Cvt by 2030,[60] the Istanbul Metro has several lines that are under construction or planned. Since the city does not have a widespread railway network, the Metropolitan Municipality aims to connect urban areas of the city that do not have access to the Istanbul two coastal railways with metro lines.

Due to the city's unique geography and depth of the Bosporus which divides the city, none of the current Istanbul Metro lines cross the strait; lines are wholly located either on the European side or the Asian side of the city. In 2019, The Ministry of Transport and Infrastructure began the planning of a Шаблон:Convert line that would link İncirli with Söğütlüçeşme via a tunnel under the Bosphorus also designed to accommodate road traffic.[61]

The following metro lines are under construction:

Line Route Length Stations Notes[62]
Файл:Istanbul M1B Line Symbol (2020).svg
Kirazlı ↔ Halkalı 9.70 km (under construction) 9 (0 under construction) Under construction, partially (Kirazlı-Halkalı Üniversite) opening: 2027.
Файл:Istanbul M4 Line Symbol (2020).svg
Tavşantepe ↔ Tuzla 7.90 km (under construction) 6 (1 under construction) Under construction, partially (Tavşantepe-Kaynarca Merkez) opening: 2025.
Файл:Istanbul M5 Line Symbol (2020).svg
Samandıra Merkez ↔ Sultanbeyli 4.4 km (under construction) 3 (under construction) Under construction, opening: 2025.
Файл:Istanbul M7 Line Symbol (2020).svg
Kabataş ↔ Yıldız 4.5 km (under construction) 2 (under construction) Under construction, opening: 2025.[63]
Mahmutbey ↔ Esenyurt Meydan 18.1 km (under construction) 11 (5 under construction) Under construction, partially (Mahmutbey-Hastane) opening: 2026.
Файл:Istanbul M10 Line Symbol (2020).svg
Pendik Merkez ↔ Fevzi Çakmak 4.90 km (under construction) 2 (under construction) Under construction, opening: May 2025.
Файл:Istanbul M11 Line Symbol (2020).svg
Halkalı ↔ Arnavutköy Hastane 31.5 km (under construction) 5 (under construction) Under construction, opening: Early 2025.
Файл:Istanbul M12 Line Symbol (2020).svg
60. Yıl Parkı ↔ Kazım Karabekir 13.0 km (under construction) 11 (under construction) Under construction, opening: 2025.
Файл:Istanbul M13 Line Symbol (2020).svg
Emek ↔ Yenidoğan 5 (under construction) Under construction, opening: Unknown.
Файл:Istanbul M14 Line Symbol.svg
Altunizade ↔ Bosna Bulvarı 4.5 km (under construction) 4 (under construction) Under construction, opening: 2025.
TOTAL: 98.5 + ? km 58 (38 under construction)

Construction of the following metro lines are planned or on hold:

Line Route Length Stations Notes[64]
Файл:Istanbul M2 Line Symbol (2020).svg
Yenikapı ↔ Sefaköy 14 km (planned) 10 (planned) Line planned.
Файл:Istanbul M13 Line Symbol (2020).svg
Söğütlüçeşme ↔ Emek ? km (planned) 10 (planned) Line planned.
Файл:Istanbul M20 Line Symbol.svg
Sefaköy ↔ TÜYAP 18.5 km (planned) 10 (planned) Line planned.
Файл:Istanbul M34 Line Symbol.svg
Beylikdüzü ↔ Sabiha Gökçen Airport 74.5 km (planned) 13 (planned) Line planned.

European side

Файл:Istanbul Railway Systems Network Map.svg
Istanbul network with lines and extensions under construction

M7 metro line extension

The M7 Kabataş-Yıldız metro line extension is under construction. The extension will have 2 new stations and is expected to go into service in 2025.[65] It will interconnect with ferries at Beşiktaş and Kabataş stations, with T1 trams line at Kabataş station and with F1 funicular line at Kabataş station.

M11 Metro Line

Файл:Göktürk Station (1).jpg
M11 Göktürk Metro Station

The M11 Gayrettepe-Arnavutköy Hastane metro extension to Halkalı is under construction. The extension from Arnavutköy Hastane to Halkalı will be opened in early 2025.

Asian side

Файл:M4 göztepe metro g3.jpg
Göztepe Metro Station
Файл:Fevzi Çakmak-Hastane Metro Station Platform.jpg
Fevzi Çakmak Hastane Metro Station
M4 metro line

M4 Kadıköy–İçmeler Metro Line is extending to İçmeler. Planned opening date of Kaynarca Merkez is 2025. Construction between Kaynarca Merkez and İçmeler has not started yet.

  1. Kaynarca Merkez (M10 Line Interchange)
  2. Çamçeşme
  3. Kavakpınar
  4. Esenyalı
  5. Aydıntepe
  6. İçmeler (Marmaray Interchange)
M5 metro line

M5 Üsküdar–Çekmeköy-Sultanbeyli Metro Line was being extended a tender signed in April 2017 but construction was restarted in November 2019. The section between Çekmeköy and Samandıra Merkez opened on 16 March 2024 and the remaining section to Sultanbeyli is expected to open in 2025.

  1. Veysel Karani
  2. Hasanpaşa
  3. Sultanbeyli
M12 metro line
Файл:Yenisahra1.JPG
Yenisahra Station

The M12 60. Yıl Parkı-Kazım Karabekir Metro Line will connect the underserved Ataşehir district with the regional centres of densely populated Ümraniye and integrate those districts into the Istanbul rapid rail system. Planned opening date is 2025.

  1. 60. Yıl Parkı
  2. Tütüncü Mehmet Efendi (Marmaray Interchange)
  3. Sahrayıcedit
  4. Yenisahra (M4 Line Interchange)
  5. Ataşehir
  6. Finans Merkezi
  7. Site
  8. Atakent
  9. Çarşı (M5 Line Interchange)
  10. SBÜ Hastanesi
  11. Kazım Karabekir
M14 metro line
Файл:Altunizade metro.jpg
Altunizade Metro Station

The M14 Altunizade-Bosna Bulvarı Metro Line will serve the Çamlıca Hill, Çamlıca Mosque and Bosna Boulevard and will be connect the M5 metro line. Planned opening date is 2025.

  1. Altunizade (M5 Interchange)
  2. Ferah Mahallesi
  3. Çamlıca Camii
  4. Bosna Bulvarı

Network overview

Metro, suburban rail, tram, funicular, ropeway and Metrobus (as of March 2024):

  • In operation: 446.15 km / 351 stations
  • Under construction: 84.5 km / 53 stations
  • Planned: ? km / ? stations
  • Sum: ? km / ? stations
In operation Under construction

(new lines or extensions)

In Planning, project on hold or

in revision

Line Length Opening

Date

Length

km

Stat. Notes Length

km

Stat. Notes Length

km

Stat. Notes
METRO
Файл:Istanbul M1A Line Symbol (2020).svg
Yenikapı ↔ Atatürk Airport 3 September 1989 19.9 18 8 stations are jointly used with Файл:Istanbul M1B Line Symbol (2020).svg
Файл:Istanbul M1B Line Symbol (2020).svg
Yenikapı ↔ Kirazlı 14 June 2013 15.4 13 8 stations are jointly used with Файл:Istanbul M1A Line Symbol (2020).svg 9.7 9 Kirazlı ↔ Halkalı
Файл:Istanbul M2 Line Symbol (2020).svg
Yenikapı ↔ Hacıosman-Seyrantepe 16 September 2000 23.49 16 1.8 km of branch line to Seyrantepe 5 Yenikapı ↔ İncirli
5.7 3 Hacıosman ↔ Sarıyer
4 Seyrantepe ↔ Alibeyköy Cep Otogarı
Файл:Istanbul M3 Line Symbol (2020).svg
Bakırköy-Sahil ↔ Kayaşehir Merkez 14 June 2013 26.7 19 Free interchange at Kirazlı to Файл:Istanbul M1B Line Symbol (2020).svg
Файл:Istanbul M4 Line Symbol (2020).svg
Kadıköy ↔ Sabiha Gökçen Airport 17 August 2012 33.5 23 3 Sabiha Gökçen Airport ↔ Kurtköy YHT/ViaPort
7.9 6 Tavşantepe ↔ İçmeler/Tuzla Belediyesi 2 İçmeler/Tuzla Belediyesi ↔ Tuzla Marina
Файл:Istanbul M5 Line Symbol (2020).svg
Üsküdar ↔ Samandıra Merkez 15 December 2017 26.5 20 4.4 3 Samamdıra Merkez ↔ Sultanbeyli 4 Sultanbeyli ↔ Kurtköy YHT/ViaPort
Файл:Istanbul M6 Line Symbol (2020).svg
Levent ↔ Boğaziçi University Hisarüstü 19 April 2015 3.3 4
Файл:Istanbul M7 Line Symbol (2020).svg
Yıldız ↔ Mahmutbey 28 October 2020 20.0 17 4.5 2 Yıldız ↔ Kabataş 5.4 4 Esenyurt Meydan ↔ Saadetdere
18.1 11 Mahmutbey ↔ Esenyurt Meydan
Файл:Istanbul M8 Line Symbol (2020).svg
Parseller ↔ Bostancı IDO 6 January 2023 14.27 13
Файл:Istanbul M9 Line Symbol (2020).svg
Olimpiyat ↔ Ataköy 29 May 2021 17.2 13 Free interchange at İkitelli Sanayi to Файл:Istanbul M3 Line Symbol (2020).svg
Файл:Istanbul M10 Line Symbol (2020).svg
Pendik Merkez↔ Sabiha Gökçen Airport - Until Pendik section is finished Sabiha Gökçen Airport-Fevzi Çakmak section will only be used by Файл:Istanbul M4 Line Symbol (2020).svg 4.9 2 Fevzi Çakmak ↔ Pendik Merkez 3 Sabiha Gökçen Airport ↔ Kurtköy YHT/ViaPort
Файл:Istanbul M11 Line Symbol (2020).svg
Gayrettepe ↔ Arnavutköy Hastane 22 January 2023 51.5 10 17.5 5 Arnavutköy Hastane ↔ Halkalı
Файл:Istanbul M12 Line Symbol (2020).svg
60. Yıl Parkı ↔ Kazım Karabekir - 13.0 11
Файл:Istanbul M13 Line Symbol (2020).svg
Söğütlüçeşme ↔ Yenidoğan - 24.6 15
Файл:Istanbul M14 Line Symbol.svg
Altunizade ↔ Bosna Bulvarı - 4.5 4
SUBTOTAL: 243.26 158 84.5 53 ? ?
SUBURBAN RAIL
Файл:Marmaray logo.svg
Halkalı ↔ Gebze 29 October 2013 76.6 43 operated by TCDD
Файл:Istanbul B2 Line Symbol.svg Halkalı ↔ Bahçeşehir 23 May 2022 13.5 3
SUBTOTAL: 90.1 46
TRAMWAY
Файл:Istanbul T1 Line Symbol (2020).svg
Kabataş ↔ Bağcılar 13 June 1992 19.3 31
Файл:Istanbul T2 Line Symbol (2020).svg
Taksim ↔ Tünel 29 December 1990 1.6 5 operated by IETT
Файл:Istanbul T3 Line Symbol (2020).svg
Kadıköy-Moda ring line 1 November 2003 2.6 11
Файл:Istanbul T4 Line Symbol (2020).svg
Topkapı ↔ Mescid-i Selam 12 September 2007 15.3 22
Файл:Istanbul T5 Line Symbol (2020).svg
Eminönü ↔ Alibeyköy Cep Otogarı 1 January 2021 10.1 14
Istanbul T6 Line Symbol Kazlıçeşme ↔ Sirkeci 26 February 2024 8.394 8
SUBTOTAL: 57.294 91
FUNICULAR
Файл:Istanbul F1 Line Symbol.svg
Taksim ↔ Kabataş 30 June 2006 0.6 2
Файл:Istanbul F2 Line Symbol (2020).svg
Beyoğlu ↔ Karaköy 17 January 1875 0.6 2 operated by IETT
Файл:Istanbul F3 Line Symbol (2020).svg
Vadistanbul ↔ Seyrantepe 29 October 2017 0.8 2
Файл:Istanbul F4 Line Symbol (2020).svg
Rumeli Hisarüstü ↔ Aşiyan 28 October 2022 0.8 2
SUBTOTAL: 2.8 8
ROPEWAY
Файл:Istanbul TF1 Line Symbol (2020).svg
Maçka ↔ Taşkışla 11 April 1993 0.3 2
Файл:Istanbul TF2 Line Symbol (2020).svg
Eyüp ↔ Pierre Loti 30 November 2005 0.4 2
SUBTOTAL: 0.7 4
METROBUS
Файл:Metrobüs symbol.svg
TÜYAP ↔ Söğütlüçeşme 17 September 2007 52.0 44 operated by IETT
SUBTOTAL: 52.0 44
TOTAL 446.15 351 84.5 53 ? ?

Network map

Шаблон:Rapid transit OSM map

See also

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:Istanbul Metro navbox Шаблон:Public Transport in İstanbul Шаблон:Local transport in Turkey Шаблон:International Metro Organizations Шаблон:Rapid transit in Europe Шаблон:Rapid transit in Asia Шаблон:Coord missing

  1. https://t24.com.tr/haber/metro-istanbuldan-logo-degisikligi-aciklamasi,683689 Information on the old 'M' logo and the new 'Metro Istanbul' logo.
  2. 2,0 2,1 2,2 Ошибка цитирования Неверный тег <ref>; для сносок network не указан текст
  3. https://www.enerjiatlasi.com/ulkelere-ve-sehirlere-gore-metro-uzunlugu
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. CONSORTIUM DE CONSTANTINOPLE, Bruxelles (French)
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite web
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. 13,0 13,1 Шаблон:Cite web
  14. 14,0 14,1 Шаблон:Cite web
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite web
  18. Шаблон:Cite web
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. Шаблон:Cite web
  22. 22,0 22,1 Шаблон:Cite web
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite journal
  26. İstanbul Büyükşehir Belediyesi. Ibb.gov.tr. Retrieved on 12 August 2013.
  27. Шаблон:Cite web
  28. Шаблон:Cite web
  29. Шаблон:Cite web
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite web
  33. Шаблон:Cite web
  34. Шаблон:Cite tweet
  35. Шаблон:Cite web
  36. 36,0 36,1 Шаблон:Cite web
  37. 37,0 37,1 37,2 37,3 Шаблон:Cite web
  38. 38,0 38,1 Шаблон:Cite web
  39. 39,0 39,1 Шаблон:Cite web
  40. 40,0 40,1 40,2 Шаблон:Cite web
  41. 41,0 41,1 41,2 Шаблон:Cite web
  42. 42,0 42,1 42,2 Шаблон:Cite web
  43. 43,0 43,1 43,2 Шаблон:Cite web
  44. 44,0 44,1 44,2 Шаблон:Cite web
  45. 45,0 45,1 45,2 Шаблон:Cite web
  46. 46,0 46,1 46,2 Шаблон:Cite web
  47. Шаблон:Cite web
  48. Шаблон:Cite web
  49. Шаблон:Cite web
  50. Шаблон:Cite web
  51. İstanbul Büyükşehir Belediyesi. Ibb.gov.tr. Retrieved on 12 August 2013.
  52. Шаблон:Cite web
  53. İstanbul Ulaşım: Metro Şişhane'den Maslak'a uzandı
  54. İstanbul Büyükşehir Belediyesi Шаблон:Webarchive. Ibb.gov.tr. Retrieved on 12 August 2013.
  55. https://rayhaber.com/2013/08/126-adet-metro-alimi-ihalesi-icin-en-iyi-teklif-veren-firma-mitsibushi-oldu/ Retrieved on 1 August 2013.
  56. https://rayhaber.com/2016/11/uskudar-cekmekoy-metro-hattinin-yeni-vagonlari-raylara-indi/ Retrieved on 23 November 2016.
  57. https://rayhaber.com/2016/03/kabatas-mecidiyekoy-mahmutbey-rayli-ulasim-sistemi-icin-arac-alimi-ihalesini-kazanan-firma-belli-oldu/ Retrieved on 3 March 2016.
  58. Шаблон:Cite web
  59. 59,0 59,1 Шаблон:Cite book
  60. Шаблон:Cite web
  61. Шаблон:Cite web
  62. Шаблон:Cite web
  63. Шаблон:Cite web
  64. Шаблон:Cite web
  65. Шаблон:Cite web